    2026-1004956_Flughafen München_Generalplanungsleistungen der Lph 1-4 für Bauvorhaben GSH - E; Vorfeld / Auftauchpunkt, Ver- Entsorgung aus Bestand und Hochbau

    Notice number: ocds-mnwr74-ee177ce3-bd91-4fdd-b545-cb0525908ec6

    🇩🇪 GermanyTerminal 2 Gesellschaft mbH & Co oHGServices

    KEY INFORMATION

    Submission deadline
    Sep 17, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Terminal 2 Gesellschaft mbH & Co oHG
    Accepted Languages
    DEU
    Tender type
    Services
    Contract Value
    Published date
    Aug 18, 2026

    TENDER DESCRIPTION

    This tender seeks general planning services for a structural facility at Munich Airport, encompassing building planning, engineering structures, structural engineering, technical equipment, building physics, and a dismantling concept. The scope includes all HOAI service phases 1-9, with an initial fixed assignment for phases 1-2, to prepare a functional performance specification for a subsequent general contractor award. Required technical expertise includes extensive experience as a general planner, specifically across HOAI service phases 2-4, with the ability to perform services under ongoing operations, within security areas, and under comparable access restrictions. Planning for technical equipment will cover wastewater, water, gas, heating, ventilation, power, telecommunication, conveyor, use-specific systems, and building automation. Financially, bidders must demonstrate an average annual turnover of at least €500,000.00 (excluding VAT) for comparable services over the last three completed financial years, utilizing 2022-2024 if 2025 is incomplete. While specific project dates are indicated by placeholders, the project encompasses the full spectrum of HOAI phases from…

    TENDER BRIEF

    The document includes placeholders for "Zeitraum der Leistungserbringung" (period of service provision) from `[tt.mm.jjjj]` to `[tt.mm.jjjj]`, "Baubeginn" (construction start) on `[tt.mm.jjjj]`, and "Datum der Inbetriebnahme (=Fertigstellung)" (date of commissioning/completion) on `[tt.mm.jjjj]`.

    Key phases mentioned are the "Leistungsphasen (Lph) HOAI" (Service Phases HOAI), which include Lph 1 to Lph 9. These phases indicate the progression of the project from initial concepts to completion.

    Since specific dates for contract start, end, and total duration are not explicitly stated and are represented by placeholders, they cannot be provided.

    Sources

    • 12026-1004956_Bewerbungsbogen.docx — “bis [tt.mm.jjjj] | Baubeginn | [tt.mm.jjjj] | Datum der Inbetriebnahme (=Fertigstellung) | [tt.mm.jjjj] | Alternativ: Die Planung wurde mindestens bis zu einem genehmigungsreifen oder ausführungsreifen Stand entwickelt.…

    The core scope of work for this tender, inferred from the requirements for comparable reference projects, involves general planning services for objects such as baggage sorting halls, logistics and distribution centers, warehousing/freight forwarding halls, production halls with material flow, and mail sorting facilities.

    The specialized planning and service areas required include:

    • Building planning (Objektplanung Gebäude).
    • Engineering structure planning (Objektplanung Ingenieurbauwerke).
    • Structural engineering (Tragwerksplanung).
    • Technical equipment (Technische Ausrüstung).
    • Building physics (Bauphysik).
    • Construction logistics planning (Baustellenlogistikplanung).

    Within technical equipment, specific plant groups are referenced according to HOAI § 53 Abs. 2, including:

    • Wastewater, water, and gas systems.
    • Heating systems.
    • Ventilation systems.
    • Power installations.
    • Telecommunication and information technology systems.
    • Conveyor systems.
    • Use-specific systems.
    • Building automation.

    The work also includes services performed under special circumstances such as ongoing operations, in security areas, or with comparable access restrictions. Applicants must demonstrate experience as a general planner having completed at least HOAI service phases 2-4, with the potential for work across all nine HOAI phases (Lph 1-9).

    Sources

    • 12026-1004956_Bewerbungsbogen.docx — “der Referenz | [Bezeichnung] | Name des AG: | [Name] | Adresse des AG: | [Adresse] | Ansprechpartner: | Die Benennung eines Ansprechpartners beim Auftraggeber mit Telefonnummer und E-Mail-Adresse bleibt zur Überprüfung d…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 3 FILES

    • Leitfaden eVergabe_TNW.pdf
    • 2026-1004956_Bewerbungsbogen.docx
    • Erlaubte und geblockte Office-Dokumentenformate.pdf

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders