Published
L'accord-cadre porte sur la Tierce Maintenance et l'Exploitation Applicative du SIRH HR Access d'INRAE
Notice number: 00530151-2026
KEY INFORMATION
- Submission deadline
- • Sep 9, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Inrae
- Accepted Languages
- French
- Tender type
- Services
- Contract Value
- Published date
- Jul 31, 2026
TENDER DESCRIPTION
This framework agreement seeks a service provider for the Third-Party Maintenance and Application Operation of INRAE's HR Access HRIS, encompassing the design, realization, implementation, and monitoring of the initial solution and its evolutions, including extensive deployment activities, ongoing maintenance, and the administration of development, test, and pre-production platforms. The scope also includes skill transfer, reversibility, and the provision of software licenses, utilizing methodologies such as classical V-cycle and Agile approaches, alongside tools like ServiceNow, Kantree, and requiring MFA authentication for system access. The contract has a firm duration of two years, renewable twice for one year each, allowing for a maximum total duration of four years, with critical milestones including a launch meeting within one week, a responsibility transfer by the end of the third month, and a subsequent one-month service validation period. Candidates must demonstrate financial capacity through declarations of global annual turnover and domain-specific turnover for the last three available financial years.
TENDER BRIEF
The contract has a firm duration of 2 years, which is renewable twice for a period of 1 year each, starting from the execution date notified by INRAE. This implies a maximum total duration of 4 years.
Key milestones and phases include:
- A launch meeting to be organized no later than 1 week after the contract notification, with supporting documents submitted 48 hours prior.
- The formalization of a takeover strategy by the contractor within the week following the launch meeting.
- Phase 1: Knowledge Acquisition (M1), which is scheduled to last 4 weeks from the notification.
- A responsibility transfer (bascule de responsabilité) at the end of M3, no later than 3 months after notification, formalized by a handover report.
- A regular service validation (VSR) period of one month, observed after the responsibility transfer.
- A weekly takeover committee from the start of the contract until the responsibility transfer.
A specific contract start date or fixed end date is not explicitly stated, as the start date is dependent on INRAE's notification and the end date depends on the renewals.
Sources
- 12026_AOO_INRAE_TMA-SIRH_CCAP.doc — “dans les pi ces du dossier de consultation. ARTICLE 5 DUR E ET MONTANTS DU MARCH Le march cute pour une dur e de 2 ans fermes reconductible deux fois pour une dur e de 1 an compter de la date de d but d cution notifi e p…”
- 22026_AOO_INRAE_TMA-SIRH_ATTRI1.docx — “relevé(s) d’identité bancaire) Nom de l’établissement bancaire : Numéro de compte : B4 - Avance (article R. 2191-3 ou article R. 2391-1 du code de la commande publique) Je renonce au bénéfice de l'avance : Non Oui (C…”
- 32026_AOO_INRAE_TMA-Exploit-SIRH_CCTP V8_20260710.docx — “| Mêmes délais que pour P3 (§Prestation 3 – Maintenance évolutive) PV de bascule de responsabilité | A la fin de M3, maximum 3 mois après la notification PV de VSR | 1 mois après la bascule de responsabilité Exigences Ré…”
The core scope of work for this tender involves the design, realization, implementation, and monitoring of an initial solution and its evolutions on pilot sites. This includes the provision of an initial solution, its launch, overall project management, installation of application software, and the supply and installation of hardware and non-application software for development, test, and pre-production platforms. Key activities also encompass general design, detailed differential studies, parameterization, specific development (including user documentation), solution integration, and acceptance testing.
The tender also covers the implementation and monitoring of pilot sites, including coordination of deployment work, project management assistance, user support, and deployment reviews. For subsequent evolutions, the scope extends to their design, realization, and deployment on pilot sites.
Deployment activities are a significant part of the scope, involving the framing and coordination of deployment waves, assistance with various deployment tasks (parameterization, data recovery, training, user assistance), preparation and assistance for deployment within establishments, and assistance with HR organization. It also includes data quality improvement before migration, customization of the solution to specific establishment needs, and specific evolutions of the solution, as well as assistance with data recovery, training kit adaptation, training session animation, and start-up assistance.
Maintenance and monitoring are crucial, covering the monitoring of application software packages, third-party application maintenance (TMA) for parameterization and specific developments of the initial solution, and extensions of TMA for evolutions. Maintenance of hardware and non-application software, along with the support and operation of a competence center, are also included.
Furthermore, the tender requires skill transfer and reversibility, specifically knowledge transfer for the competence center and reversibility for taking over TMA of specific developments.
Operational aspects include the administration and exploitation of development, test, and pre-production platforms, as well as ongoing application operations through annual and quarterly fixed-price packages. The provision of software licenses is also part of the scope.
Deliverables mentioned include reformulations of business needs, presentations of possible solutions, functional breakdowns, use case scenarios, technical lists of new and old functions, impacts on databases, and architecture modifications. For testing, deliverables include lists to identify test use cases and elements for test case drafting. Documentation requirements involve identifying the impact of modifications on project documentation (user documentation). Development is expected to follow a classic V-cycle method, with an integration of an "agile" approach. Initial deliverables also include a transfer plan, action tracking tables, quality assurance and security assurance plans, performance indicators, and various reports and meeting minutes.
Sources
- 12026_AOO_INRAE_TMA-Exploit-SIRH_BPU.xlsx — “plates-formes de production)", ,,Suivi de progiciels applicatifs (jusqu'à la fin de VSR),Jusqu'à la fin de la VSR (plutôt que VA) ,,Conception générale, ,,Etude différentielle détaillée, ,,Paramétrage et développement sp…”
- 22026_AOO_INRAE_TMA-Exploit-SIRH_CCTP V8_20260710.docx — “doit contenir les informations suivantes : Pour l'axe fonctionnel : Une reformulation de l'expression de besoin d'origine avec une présentation des solutions possibles, Une cinématique des cas d'usage, Une réponse au bes…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 5 FILES
- 2026_AOO_INRAE_TMA-SIRH_RC.docx218 KBDOCX
- 2026_AOO_INRAE_TMA-Exploit-SIRH_CCTP V8_20260710.docx2.7 MBDOCX
- 2026_AOO_INRAE_TMA-SIRH_CCAP.doc1.2 MBDOC
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.