Published

    2026ETP202 - Accord cadre de diagnostics et maîtrise d’œuvre concernant le Génie-Civil des ouvrages portuaires des sept ports Départementaux du Calvados

    Notice number: 26-100115

    🇫🇷 FranceConseil departemental du calvados (cd 14)Services

    KEY INFORMATION

    Submission deadline
    • Nov 23, 2026
    Location
    🇫🇷 France
    Contracting authority
    Conseil departemental du calvados (cd 14)
    Accepted Languages
    French
    Tender type
    Services
    Contract Value
    Published date
    Oct 15, 2026

    TENDER DESCRIPTION

    This framework agreement seeks a contractor for diagnostics and project management services related to civil engineering works on port structures across the seven departmental ports of Calvados. The scope encompasses missions such as DIAGnostic, Avant-Projet (AVP), PROjet (PRO), assistance for public works contract award (AMT), and VISA, with services executed via successive purchase orders. Key technical requirements include electronic submission via specific platforms, adherence to French language requirements, and precise geolocated data standards using Lambert 93-RGF93 and NGF-IGN69/Zéro Hydrographique systems. The patrimonial management must employ the méthode des Visites Simplifiées Comparées (VSC), with inspection reports capitalized on GECOPE software, and technical memorandums limited to 20 pages per sub-criterion. Financially, bidders must hold professional liability insurance (RC Exploitation and RC Professionnelle) with a minimum guarantee of €1,000,000 per claim/year, and ten-year civil liability insurance (RC décennale) of at least €1,500,000 per claim for construction works. The contract allows for a tacit one-year renewal, with a maximum one-month provisional…

    TENDER BRIEF

    The contract timeline includes the following elements:

    • Initial Duration: Not explicitly stated in the provided documents.
    • Reconduction: The framework agreement can be renewed once for an additional period of 1 year. This reconduction is tacit.
    • Non-Reconduction Notification: If the contracting authority decides not to renew the framework agreement, they must provide express notification to the contractor at least 90 calendar days before the agreement's expiration date. The contractor does not have the option to refuse reconduction.
    • Execution Deadlines: Deadlines for the execution of services will be specified in each purchase order.
    • Study Document Establishment Deadlines: These deadlines are included within the timeframe of each corresponding mission.
    • Study Document Acceptance Deadline: The maximum provisional period for the acceptance of study documents by the client or their representative is 1 month for each project management mission.
    • Phases/Missions: The contract encompasses various missions, including DIAGnostic (DIAG), studies for Avant-Projet (AVP), studies for PROjet (PRO), Assistance apportée au maître d'ouvrage pour la passation des Marchés publics de Travaux (AMT), and VISA.

    Sources

    • 12026ETP202-RC.pdf — “le pouvoir adjudicateur se réserve la possibilité d'attribuer le marché sur les offres initialement remises. 2.2 Dispositions relatives aux groupements L'accord-cadre pourra être attribué à une seule entreprise ou à un g…”
    • 22026ETP202-CCAP.pdf — “la consistance du projet | 19 14. | Admission - Achèvement de la mission.. 19 14.1 | Admission des documents 19 14.2 | Achèvement de la mission 19 15. | Suspension des prestations en cas de circonstances imprévisibles 20…”

    The core scope of work for this tender involves a framework agreement for diagnostics and project management concerning the civil engineering of port structures across the seven departmental ports of Calvados.

    The Statement of Work (SOW) summarizes the following core missions and deliverables:

    • Mission de DIAGnostic (DIAG): This mission aims to inform the client about the condition of the structure and to define a program of necessary works. Deliverables include a detailed inspection report, photographic records, scaled plans, comprehensive mapping of identified disorders, an inventory of measurement devices, and an updated structure sheet. A report summarizing the structure's history, characteristics, observed disorders, proposed safeguarding measures, and a prioritized description of required works with associated financial estimates and deadlines must also be provided.
    • Etudes d'avant projet (AVP): This involves preliminary design studies. Key deliverables are a detailed pre-project report that includes a reminder of the problem and chosen orientation, historical data, meteorological and oceanographic conditions, justification for proposed scenarios, main characteristics of the solution, potential execution phasing, implementation methods, and an analysis of any complementary studies. This mission also requires the establishment of situation plans, general and detailed plans of the proposed solution, technical cross-sections, a preliminary bill of quantities, an estimation of work costs, a project schedule, an analysis of constraints (technical, regulatory, environmental, budgetary), a preliminary analysis of the resources needed for execution, and an analysis of the advantages and disadvantages of the proposed solutions. Additionally, it includes defining requirements for complementary data (such as topographic, geotechnical, subaquatic) and drafting the corresponding specifications.
    • Etudes de projet (PRO): This mission focuses on detailed project studies. Deliverables encompass a general hypothesis note, calculation notes for the structures with their underlying assumptions, and a set of plans. These plans include those for existing structures, projected structures (general plans with technical cross-sections and details), a preliminary bill of quantities for cost estimation, detailed work costs based on unit prices, a proposal for operation and maintenance costs, project planning, and, if applicable, a proposal for lotting.
    • Etudes d'Assistance et Contrat de Travaux (ACT) / Mission d'Assistance apportée au maître d'ouvrage pour la passation des Marchés publics de Travaux (AMT): The objective of this phase is to support the client in preparing the definitive tender documents, evaluating offers to select a candidate, and finalizing the contract for public works.
    • VISA: This covers the review and approval of execution studies and related documents. The contractor is responsible for ensuring that all documents necessary for the execution of works receive a favorable visa from the project manager before the commencement of work.

    The tender is structured as a single framework agreement, not divided into lots, as the technical services are not distinct. The services will be executed through successive purchase orders based on specific needs.

    Sources

    • 12026ETP202-DGPF.xlsx — “"ACCORD CADRE DE DIAGNOSTICS ET MAITRISE D’ŒUVRE CONCERNANT LE GENIE-CIVIL DES OUVRAGES PORTUAIRES DES SEPT PORTS DEPARTEMENTAUX DU CALVADOS Décomposition du Prix Global et Forfaitaire (Consultation n°2026ETP202)",,,,, N…”
    • 22026ETP202-CCTP.pdf — “de justifier les délais nécessaires à l'exécution de chaque bon de commande. 3 MISSIONS DU MARCHE 3.1 Mission de DIAGnostic (DIAG) La mission de diagnostic a pour objet de renseigner le maître de l'ouvrage sur l'état de…”
    • 32026ETP202-RC.pdf — “Enveloppe prévisionnelle des travaux Les règles concernant le montant des travaux seront définies dans l'acte d'engagement et ne pourront en aucun cas être changées. 1.1.4 Planning prévisionnel Les règles concernant la d…”

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 7 FILES

    • 2026ETP202-DGPF.xlsx
    • 2026ETP202-CCTP-Annexes.pdf
    • 2026ETP202-CCTP.pdf

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders