Published

    26D710021 - Sanierung Bestand Internat, Landesgymnasium Sport Leipzig

    Notice number: 00573684-2026

    🇩🇪 GermanyStaatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und VertragsmanagementServices

    KEY INFORMATION

    Submission deadline
    Sep 18, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und Vertragsmanagement
    Accepted Languages
    German
    Tender type
    Services
    Contract Value
    Published date
    Aug 19, 2026

    TENDER DESCRIPTION

    This tender solicits comprehensive building planning services for the renovation of the existing students' residence at the State Sports High School Leipzig, which entails a complete overhaul of the roof and façade, alongside partial interior refurbishment to create 40 accommodation places for students over 18 and a sports medicine area. The core scope includes updating inventory plans, developing demolition concepts, establishing planning and cost data, and providing execution planning (LPH 5), while integrating sustainability, environmental protection, and accessibility measures, including specific NBS training and audits. Technical requirements necessitate compliance with SächsBO, DIN 18040, and the Klimastadtvertrag, emphasizing alternative energy use, waste heat utilization, and energy saving concepts, with documentation through the PlanTeam-Space project server, digital Room and Building Books (RGB), and Technical Asset Books (TAB) according to CAD/FM-DokuRL. Performance Level 1 deliverables are due by April 2027, with construction scheduled from May 2028 to November 2029, followed by commissioning in December 2029. Bidders are required to declare their total and…

    TENDER BRIEF

    The contract timeline includes the following key dates and phases:

    • Start of Construction (Baubeginn): May 2028
    • Completion Date (Fertigstellungstermin): November 2029
    • Start of Commissioning Phase (Beginn der Inbetriebnahmephase): December 2029
    • Performance Level 1 (sämtliche Leistungen der Leistungsstufe 1): April 2027

    The total duration from the start of construction to completion is approximately 1 year and 6 months. The contract start date is not explicitly stated.

    Sources

    • 1C02_Vertragsformular - Gebäude.pdf — “erbringen, dass folgende Termine eingehalten werden können: | Baubeginn: 05/2028 | Fertigstellungstermin: 11/2029 | ☐ Beginn der Inbetriebnahmephase: 12/2029 | Übergabetermin nach Abschnitt H RLBau: ☐ | ☐ 5.4.2 | Auf der…

    • Measures to avoid runoff for stormwater management.
    • Compliance with SächsBO (Sächsische Bauordnung).
    • Compliance with DIN 18040 for accessibility.
    • Compliance with the Klimastadtvertrag der Stadt Leipzig for environmental protection.
    • Use of alternative energies.
    • Development of concepts for waste heat utilization (Abwärmenutzung).
    • Development of concepts for energy saving (Energieeinsparung).
    • Fulfillment of the Zielvereinbarung nachhaltiges Bauen Sachsen (Target agreement for sustainable building Saxony).
    • Electronic invoicing according to legal and client specifications, using Leitweg-ID: 14-0411124SIBL2BAU01-95.
    • Project server PlanTeam-Space for documentation, plan management, data entry, and project communication.
    • Utilization of functionalities for area management and component/asset management within PlanTeam-Space.
    • Two-factor authentication using an application (app) on a mobile device.
    • Data entry in the digital Room and Building Book (RGB).
    • Data entry in the Technical Asset Book (TAB).
    • Use of the DV-Anwendung im PM-System (PTS).
    • Documentation according to CAD/FM-DokuRL (CAD/FM Documentation Guideline).
    • Area calculation according to DIN 277.
    • Creating a building inventory list for management tasks according to Annex 0-07 of the CAD/FM-DokuRL.

    Sources

    • 1A03.00_Projektbeschreibung Landesgymnasium Sanierung.pdf — “Gutachten werden parallel beauftragt und zeitnah zur Verfügung gestellt. - K1 Gutachten inkl. aller darin enthaltenen Gutachten Seite 5 von 7 (Stand 22.05.2026) 4. - Baugrundgutachten in Erarbeitung Positionsplan Bestand…
    • 2C02_Vertragsformular - Gebäude.pdf — “Erstellung von Bauaufnahmezeichnungen notwendig, d. h. die Anfertigung von maßstabsgetreuen grafischen Dokumentationen des IST-Zustandes von Bauwerksteilen, Bauwerken oder Bauwerksgruppen (vor Be- ginn einer Maßnahme) ha…
    • 3B01_Anlage1_Spezifische_Leistungspflichten_Gebäu.pdf — “mithilfe Anlage 2-02. Hierfür ist die DV- Anwendung im PM-System (PTS) zu nutzen. | | Erstellen einer Baubestandsliste für Bewirtschaftungsaufgaben gemäß Anlage 0-07 der CAD/FM-DokuRL (Reinigungsdaten vor Bauübergabe) |…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 31 FILES

    • A03.00_Projektbeschreibung Landesgymnasium Sanierung.pdf
    • A03.02_Leitungsplan Bestandsleitungen.pdf
    • A02_902-AI EU_Ausfüllhinweise Vertragsformular.pdf

    and 24 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders