    Μελέτη νέων Έργων για την Βέλτιστη Εκμετάλλευση του ΚΕΛΨ (Ψυττάλεια – Φάση 3), Κωδικός μελέτης Μ-217

    Notice number: 26PROC019632642

    🇬🇷 GreeceΕυδαπ αε

    KEY INFORMATION

    Submission deadline
    Oct 16, 2026
    Location
    🇬🇷 Greece
    Contracting authority
    Ευδαπ αε
    Accepted Languages
    Greek
    Tender type
    Contract Value
    Published date
    Aug 5, 2026

    TENDER DESCRIPTION

    This tender seeks a comprehensive study for the optimal utilization of KELP (Psittalia – Phase 3), involving the transformation of one of Europe's largest Wastewater Treatment Centers, encompassing an integrated understanding of treatment units, biogas production, sludge management, energy balance, and operational safety. The core scope includes a wide range of specialized studies such as hydraulic, mechanical/electrical, chemical-technical, environmental, static, geological, economic, port, topographical, and energy studies, along with associated tender documents and Health and Safety Plans. Key technical requirements specify expertise in advanced oxidation with ozone, activated carbon adsorption, membrane systems, energy utilization of sludge and biogas, energy recovery technologies, and advanced sludge treatment methods. Financial standing requirements mandate professional liability insurance with minimum limits of €750,000 per claim and €1,000,000 cumulatively, plus an average annual turnover exceeding €400,000 from relevant services over the last three fiscal years. The project is structured into four phases, with an expected completion timeline of thirty-five (35) months…

    TENDER BRIEF

    Question: What is the contract timeline?

    Context: Contract start date, end date, total duration, and any key milestones or phases mentioned. Return null if not stated.

    The contract timeline is as follows:

    • Contract Start Date: The date of signing the agreement. The contracting authority reserves the right to set a later start date for the contract deadlines when signing the agreement.
    • Total Duration: Thirty-five (35) months from the signing of the agreement.
    • Potential Extension: The contracting authority has the right to unilaterally modify the contract for Phase 4 of the study for an additional period of up to six (6) months from the expiration of the total deadline, without increasing the financial consideration.
    • Key Milestones/Phases: The service approves the studies of each partial deadline and orders the execution of the next study. An indicative timeline for the study is presented in the Technical Data Sheet (details of which are not provided in the snippets).

    Sources

    • 126PROC019632642.pdf — “να μελετήσουν τα τεχνικά στοιχεία του έργου, η δε οικονομική τους προσφορά περιλαμβάνει τη συνολική αμοιβή τους για το σύνολο του προς μελέτη αντικειμένου, όπως αυτό προδιαγράφεται στο Φάκελο δημόσιας σύμβασης. Τεκμαιʆρε…

    The core scope of work for this tender involves the comprehensive transformation of one of Europe's largest Wastewater Treatment Centers. This project is a single, unified undertaking, not subdivided into parts, and requires an integrated understanding of the interaction between various treatment units, biogas production and utilization, sludge management, the facility's energy balance, and the requirements for continuous and safe operation.

    The Statement of Work summary and core deliverables are primarily focused on a wide range of specialized studies (μελέτες) and their associated tender documents and Health and Safety Plans, which include:

    • Hydraulic studies, hydraulic works, and water resource management studies.
    • Mechanical, Electrical, and Electronic studies.
    • Chemical-technical studies.
    • Environmental studies.
    • Static studies.
    • Geological studies.
    • Geotechnical investigations and studies.
    • Economic studies.
    • Port studies.
    • Topographical studies.
    • Energy studies.

    The main studies emphasized are hydraulic, mechanical/electrical (M/E), chemical (ΧΜ), static, and port studies, along with their supporting studies. The project is expected to be completed within thirty-five (35) months from the signing of the agreement, with a potential extension of up to six (6) additional months for Phase 4.

    Sources

    • 126PROC019632642.pdf — “συνεκτιʆμηση της τεχνικηʆς αξιοπιστιʆας, της λειτουργικηʆς συμβατοʆτητας, της βιωσιμοʆτητας και του κοʆστους κυʆκλου ζωηʆς. Τα αντικειʆμενα Β και Δ, αν και αποτελουʆν σαφωʆς οριοθετημεʆνα αντικειʆμενα εργασιωʆν, συνδεʆον…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 1 FILE

    • 26PROC019632642.pdf

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders