Accord cadre de maîtrise d'oeuvre urbaine pour l'aménagement de la ZAC du Campus technologique à Colombelles
Notice number: 00533738-2026
KEY INFORMATION
- Submission deadline
- • Sep 22, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Normandie Aménagement
- Accepted Languages
- French
- Tender type
- Services
- Contract Value
- Published date
- Aug 3, 2026
TENDER DESCRIPTION
This framework agreement encompasses comprehensive urban project management services for the development of the ZAC of the Technological Campus in Colombelles, focusing on the design, monitoring, and execution of public road spaces and hydraulic structures from preliminary design through to reception. The scope also includes synthesis missions, detailed project studies, site preparation, treatment of invasive alien species, new plantations, and the development of wildlife habitats, all requiring adherence to French and international standards, the Avoid, Reduce, Compensate methodology, and the exclusive use of "soft techniques" for maintenance without phytosanitary products. Financial standing requirements include declarations of turnover, appropriate bank declarations or professional risk insurance, and specific minimum coverage for professional and operating liability insurance. The agreement has an initial duration of two years, tacitly renewable for two additional one-year periods, for a maximum total duration of four years, with services provisionally starting in November 2026 and individual work packages ranging from one to six months, followed by vegetation recovery…
TENDER BRIEF
The contract timeline consists of an overarching framework agreement and specific timelines for individual work packages.
For the framework agreement (accord-cadre):
- Contract start date: The date of contract notification.
- Provisional start date for services: November 2026.
- Initial duration: 2 years.
- Renewal: The agreement can be tacitly renewed for 2 additional periods of 1 year each.
- Total duration: The maximum duration of the contract, including all renewal periods, is 4 years.
For specific work packages (travaux):
- Work duration:
- For some sites (e.g., Site de compensation 4, 5, 6), the works are planned for a maximum of 6 months, including the preparation period.
- For other sites (e.g., Site de compensation 10, 11), the works are planned for a maximum of 1 month, including the preparation period.
- Preparation period: A two-week preparation period is foreseen, which can be reduced to one week upon the company's request at the time of contract notification.
- Key milestones/phases: Following the main work, there are "constats de reprise des végétaux" (vegetation recovery assessments) scheduled at N+1 and N+2 years (two visits per year), as indicated in timelines extending from 2026 to 2028.
Sources
- 1CCAP_MOE ZAC.pdf — “la protection des personnes physiques à l'égard du traitement des données à caractère personnel (RGPD). Pour l'application de ces dispositions, il est rappelé que, dans le cadre de leurs relations contractuelles, le pouv…”
- 2ZAC Campus - PRO Site de compensation 4 - ind.D.pdf — “la notification de marché. Les périodes d'exécution pourront être ajustées également. Durant cette période, l'ensemble des documents suivants seront fournir par l'entrepreneur au maître d'ouvrage : Projet d'installation…”
- 3ZAC Campus - PRO Site de compensation 6 - ind.D.pdf — “des contraintes techniques des sites et du respect de la sensibilité des milieux et des espèces. Sans oublier des possibles aléas et perturbations météos Période de préparation Une période de préparation des travaux de D…”
- 4ZAC Campus - PRO Site de compensation 5 - Ind.D.pdf — “sensibilité des milieux et des espèces. Sans oublier des possibles aléas et perturbations météos Période de préparation Une période de préparation des travaux de DEUX SEMAINES est prévue. (Elle peut être réduite sur dema…”
- 5ZAC Campus - PRO Site de compensation 10 - ind.D.pdf — “lors de la notification de marché. Les périodes d'exécution pourront être ajustées également. Durant cette période, l'ensemble des documents suivants seront fournir par l'entrepreneur au maître d'ouvrage: Projet d'instal…”
- 6ZAC Campus - PRO Site de compensation 11 - Ind.D.pdf — “demande de l'entreprise à UNE SEMAINE, lors de la notification de marché. Les périodes d'exécution pourront être ajustées également. Durant cette période, l'ensemble des documents suivants seront à fournir par l'entrepre…”
The core scope of work for this tender involves several distinct missions and associated deliverables.
Mission 1: Aménagement des espaces publics viaires (Development of public road spaces). This mission encompasses various stages: AVP (preliminary design), estimation of global work cost (AVP stage), PRO (project design), estimation of global work cost (PRO stage), DCE (tender documents), ACT (assistance for contract award), VISA (validation of execution studies), DET (supervision of work execution), OPC (scheduling, piloting, and coordination), and AOR (assistance for reception operations).
Mission 2: Réalisation des travaux de création et/ou adaptation des ouvrages publics hydrauliques (Execution of works for the creation and/or adaptation of public hydraulic structures). This mission follows the same sequence of stages as Mission 1: AVP, estimation of global work cost (AVP stage), PRO, estimation of global work cost (PRO stage), DCE, ACT, VISA, DET, OPC, and AOR.
Mission 3: Mission de synthèse (Synthesis mission). A specific deliverable for this mission is the Actualisation du plan masse (Updating of the master plan).
In addition to these missions, the tender includes a detailed étude de projet (project study) which aims to define the composition of works, plans, and forms from the dimensioning phase. This study dossier includes a descriptive notice detailing the project, conditions, and rules for implementation (e.g., framing, access, execution modalities, seasonal calendars, environmental prescriptions). It also comprises a technical dossier with an initial state, technical principles, and details of structures (nature, volume, dimensions). The project studies also involve situation plans, a provisional schedule for works and developments, and a detailed financial project with cost estimates.
Specific interventions and deliverables include:
- Préparation de chantier (Site preparation).
- Traitement des Espèces Exotiques Envahissantes (Treatment of invasive alien species), which specifically covers:
- Gestion de la Renouée du Japon (Japanese Knotweed management): involving mowing of aerial parts, incineration or industrial composting, and excavation/in-situ burial of contaminated soil.
- Gestion du Buddléia de David (Butterfly Bush management): including manual uprooting of young plants and mechanical uprooting of older subjects with grubbing.
- Gestion du Robinier faux acacia (Black Locust management): involving manual uprooting of shoots.
- Plantations: This includes soil preparation, supply and planting of hedgerow shrub species, and installation of individual protections and biodegradable mulch.
- Aménagements pour la faune (Wildlife developments): Such as creating rock piles or hibernacula for reptiles and supplying and installing nest boxes for passerine birds.
- Réception/plans de récolement (Reception/as-built drawings): This involves a reception meeting and the provision of as-built drawings.
The contractor is also required to provide several documents, including a project for site installation and circulation plan, a quality and environmental assurance plan (SOSED), DICT (Declaration of Intent to Commence Work) and concessionaire responses, execution procedures, and any necessary site inspection reports for roads before work commences.
Sources
- 1DPGF (Prestat° à MS).xlsx — “"""ZAC CAMPUS TECHNOLOGIQUE"" - Accord-Cadre partie à marchés subséquents Décomposition du Prix Global et Forfaitaire (DPGF)",,,,,,,, ,,,,,,,, ,,,,,,,, ,,,,,,,, PRESTATIONS PAR MISSIONS,,,,,,,, Dénomination des éléments…”
- 2DPGF (Prestat° à MS).pdf — “| 0,00 € | 1.7 | VISA | 0,00 € | 0,00 € | 0,00 € | 0.00 € | 1.8 | DET | 0,00 € | 0.00 € | 0.00 € | 0.00 € | 1.9 | OPC | 0,00 € | 0,00 € | 0,00 € | 0,00 € | 1.10 | AOR | 0,00 € | 0,00 € | 0,00 € | 0,00 € | | TOTAL | 0,00…”
- 3ZAC Campus - PRO Site de compensation 11 - Ind.D.pdf — “5] 1. CADRE DU PRO – AVANT PROPOS 1.1. DEMARCHES ET COMPOSITION DU PRESENT DOCUMENT L'étude de projet a pour objectif de définir la composition des travaux de préciser les plans, les formes des différents éléments issus…”
- 4ZAC Campus - PRO Site de compensation 4 - ind.D.pdf — “site MC4 Normandie Aménagement / www.normandie-amenagement.com 1. CADRE DU PRO – AVANT PROPOS 1.1. DEMARCHES ET COMPOSITION DU PRESENT DOCUMENT L'étude de projet a pour objectif de définir la composition des travaux de p…”
- 5ZAC Campus - PRO Site de compensation 10 - ind.D.pdf — “lors de la notification de marché. Les périodes d'exécution pourront être ajustées également. Durant cette période, l'ensemble des documents suivants seront fournir par l'entrepreneur au maître d'ouvrage: Projet d'instal…”
- 6ZAC Campus - PRO Site de compensation 1 - ind.D.pdf — “| 201 Gestion de la Renouée du Japon | | | | Fauchage préalable des parties aériennes, puis envoi en incinérateur (UVE) ou composteur industriel Excavation des terres contaminées et enfouissement in situ à plus de 3m de…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 87 FILES
- 3509 planning indicatif.pdf522 KBPDF
- ZAC Campus - PRO Site de compensation 2 - Ind.D.pdf5.6 MBPDF
- ZAC Campus - PRO Site de compensation 4 - ind.D.pdf4.8 MBPDF
and 80 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.