Published

    3626EMF127 - Untersuchung der Veränderung der EMF-Risikowahrnehmung über die Zeit im Kontext der Ultranet-Inbetriebnahme

    Notice number: ocds-mnwr74-5158cfb9-80e5-4736-8518-9da441e5aa1b

    🇩🇪 GermanyBundesamt für Strahlenschutz (BfS)

    KEY INFORMATION

    Submission deadline
    Sep 8, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Bundesamt für Strahlenschutz (BfS)
    Accepted Languages
    DEU
    Tender type
    Contract Value
    Published date
    Jul 30, 2026

    TENDER DESCRIPTION

    This tender seeks a contractor for the "Investigation of the Change in EMF Risk Perception over Time in the Context of Ultranet Commissioning," focusing on the temporal dynamics of electromagnetic field (EMF) risk perception through quantitative surveys at four points in time. The core scope encompasses a comprehensive work program including literature research (AP 1), development and pre-testing of general population and in-depth survey questionnaires (AP 2), and detailed project planning across Work Packages 1 through 7. Submissions must be made via the e-Vergabe-Plattform in German, with all concepts in accessible PDF format, adhering to specified tools like PAC 3 and using gender-neutral language and German spelling/grammar rules. The contract award is anticipated in September 2026, with the critical first survey (T1) commencing in Q4/26 prior to Ultranet commissioning and completed within three months, while the overall contract end date and total duration are not explicitly defined. Bidders must declare absence of exclusion grounds, demonstrate professional capability with at least three comparable references, and for bids over 30,000 EUR net, an excerpt from the…

    TENDER BRIEF

    The contract timeline details are partially specified:

    • Contract Start Date: The contract award is expected very soon after the bid opening, likely in September 2026. The performance of the first survey (T1) is to begin as early as possible in Q4/26, before the Ultranet commissioning. The term "startzeitpunkt" is binding.
    • Contract End Date: The contract states, "Die Leistung ist bis zum ... zu erbringen" (The service is to be provided by...). The exact date is not specified and is left as a placeholder. Similarly, the final result according to §13 ABFE-BMUV is to be submitted "bis zum..." (by...).
    • Total Duration: Not explicitly stated as a single duration.
    • Key Milestones/Phases:
    • The first survey (T1) must begin as early as possible in Q4/26, prior to the Ultranet commissioning.
    • The T1-measurement (first survey) must be completed within 3 months, even if this extends into 2027, which is after the official Ultranet commissioning.
    • The finalization of Work Package (AP) 3.1 is permissible in 2027.
    • The fourth survey (T4) represents the last measurement point.
    • Payments are linked to the delivery and acceptance of Work Packages 1 through 7, and the final result according to §13 ABFE-BMUV, though specific delivery dates for these are not provided in the snippet.

    Sources

    • 13626EMF127_Bieterfragenbeantwortung_2026-08_27.pdf — “keinen Rechtsanspruch auf | | | | einen bestimmten Zuschlagstermin. Vor | | | | Hintergrund wird erwartet, dass Sie Ihre konzeptionelle Ausarbeitung so diesem | | | | gestalten, dass die erste Befragung vor der Ultranet-…
    • 23626EMF127_Vertragsentwurf.pdf — “und B sowie C sind Bestandteile dieses Vertrages. § 2 Vertragslaufzeit, Ausführungsfristen (1) Die Leistung ist bis zum ... zu erbringen. (2) (3) Der Auftragnehmer hat der Auftraggeberin das Ergebnis nach § 13 ABFE-BMUV…

    The core scope of work for this tender is structured around several "Arbeitspakete" (Work Packages), specifically Work Package 1 through Work Package 7, with detailed descriptions provided in the "Leistungsbeschreibung" (performance description) document.

    A high-level summary of the Statement of Work and core deliverables includes:

    • Work Program/Implementation Proposal: Bidders must submit a description of their work program or an implementation proposal, outlining methods and phases, demonstrating an independent execution of the required tasks.
    • AP 1: Literature Research: This involves conducting a comprehensive literature search using relevant databases and sources. The deliverable is an independent report, due one month after project commencement, summarizing the current state of knowledge, providing an overview of relevant work, and enabling access to key documents. This report must be submitted as a draft, discussed in a meeting, revised, and a shortened version will be part of the final report.
    • AP 2: Development of Questionnaires for the First Survey: Based on the findings from AP 1, two questionnaires need to be developed for both a general population survey and an in-depth survey. These questionnaires must undergo pre-tests and associated reporting, and further refinement.
    • Project Planning: The tender requires a project structure and work plan that allows for an estimation of necessary processing times and efforts, broken down by individual work packages. This planning must include all deadlines for interim reports and project meetings.
    • Justification of Costs: The concept must clearly explain the technical assumptions and considerations underpinning the pre-calculated effort (resource requirements), including personnel, travel expenses, and any material or special operating costs. If subcontracts are planned, their performance descriptions and calculations must also be included.
    • Conferences/Meetings: These are part of the service only if explicitly required in the performance description or if they are essential for fulfilling the service.
    • Catering Costs: Costs for catering are generally not part of the required service.

    Sources

    • 13626EMF127_Angebotsvordruck.pdf — “ANSCHRIFT DES BIETERS Firmenname Strasse PLZ - Ort Land Seite 1 bis Seite 4 Angebot ANSCHRIFT DER VERGABESTELLE Bundesamt für Strahlenschutz ZD 2 Willy-Brandt-Straße 5 38226 Salzgitter Sehr geehrte Damen und Herren, zu d…
    • 23626EMF127_Angebotsbedingungen.pdf — “die erfor- derlichen Erklärungen/Nachweise dem Angebot beizulegen. Für die von den Unterauftragnehmer / Nachunterauftragnehmer auszuführende Leistung ist ebenfalls eine Kalkulation beizufügen. Im Angebot muss das für die…
    • 33626EMF127_Leistungsbeschreibung_inkl_Bewertungsmatrix_2026-08_13.pdf — “Literaturrecherche); Aktuelle Beratungen in einschlägigen nationalen und internationalen Gremien. Die Literaturrecherche ist anhand der einschlägigen Literaturdatenbanken und Recherche- möglichkeiten durchzuführen. Die R…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 12 FILES

    • 3626EMF127_Bieterfragenbeantwortung_2026-08_27.pdf
    • 3626EMF127_Anlage_C_zum_Vertragsentwurf_Vereinbarung zur Autragsverarbeitung.docx
    • 3626EMF127_Angebotsvordruck.pdf

    and 5 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders