Published
79 - SAINT MAIXENT L'ECOLE - ENSOA - Quartier COIFFE - Construction d'un poste d'accueil et de filtrage
Notice number: 26-72643
KEY INFORMATION
- Submission deadline
- • Sep 24, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Sid so
- Accepted Languages
- French
- Tender type
- Works
- Contract Value
- Published date
- Jul 21, 2026
TENDER DESCRIPTION
This tender concerns the comprehensive construction of a reception and filtering post (Poste d'Accueil et de Filtrage - PAF) at ENSOA – QUARTIER COIFFE in Saint-Maixent-l'École. The project scope encompasses all necessary external infrastructure, including site preparation, new roadways, parking areas, pedestrian paths, perimeter fencing with vehicle and pedestrian SAS, outdoor lighting, signage, green spaces, and extensive drainage and utility networks (stormwater, wastewater, potable water, CFO/CFA trenches), along with associated earthworks. Concurrently, it covers all structural and internal works for the main building, comprising technical execution studies, concrete work for foundations, basements, slabs, insulation, and drainage, as well as the construction of concrete walls, columns, beams, and high slabs with all necessary sealings and openings. Key technical requirements mandate specific retained processes for earthworks, new road creation, network installation, structural work, joinery, and HVAC, requiring calculation notes, environmental materials, bulletproof joinery and glass, an emergency door, a heat pump for HVAC, a comprehensive ventilation system, and a Waste…
TENDER BRIEF
The contract timeline is as follows:
The total duration for the execution of all lots is 15 months. This duration is broken down into specific phases for each lot (Lot 1 and Lot 2).
Key phases mentioned are:
- Preparation Period: 3 months, starting from the date specified in the service order to commence this period.
- Works: 12 months, starting from the date specified in the service order to commence the works.
The execution period for each lot begins on the date indicated in the service order instructing the start of the works. A detailed execution calendar, outlining the intervention periods for each lot, must be approved by the contracting authority at least 10 days before the end of the preparation period. The service order for starting the works can be notified up to 9 months after the market notification.
Specific contract start and end dates are not explicitly stated, as they are contingent upon the issuance of service orders. The provisional calendar is not attached to the current contract.
Sources
- 1AE LOT 2.pdf — “sous-traitant concerné et d'agrément des conditions de paiement du contrat de sous-traitance, demande qui est réputée prendre effet à la date de notification du marché; cette notification est réputée emporter acceptation…”
- 2AE LOT 1.pdf — “annexe constitue le montant maximal de la créance que le sous-traitant concerné pourra présenter en nantissement ou céder. LOT 1: VRD 6 Chaque annexe constitue une demande d'acceptation du sous-traitant concerné et d'agr…”
- 3CCAP commun a tous les LOTS SIGNE.pdf — “(décision) du pouvoir adjudicateur (P.A) 10 jours au moins avant la fin de la période de préparation visée au 8.1 ci-après. B- Le délai d'exécution propre à chacun des lots commence à courir à la date figurant sur l'ordr…”
- Procédé retenu (retained process/methodology) for earthworks
- Procédé retenu (retained process/methodology) for new road creation
- Procédé retenu (retained process/methodology) for the installation of all networks
- Procédé retenu (retained process/methodology) for structural work (gros œuvre)
- Procédé retenu (retained process/methodology) for joinery work
- Procédé retenu (retained process/methodology) for the HVAC section
- Méthodologie mise en place (methodology implemented) for waste management
- Notes de calcul (calculation notes) for various processes
- Matériaux et/ou produits environnementaux (environmental materials/products) meeting higher standards
- Menuiseries (fenêtre et portes) pare-balles (bulletproof joinery including windows and doors)
- Vitres pare-balles (bulletproof glass)
- Porte de secours (emergency door)
- Pompe à chaleur (heat pump) for heating/ventilation
- Système de ventilation (ventilation system)
- Schéma d’Organisation et de Gestion des Déchets (SOGED) (Waste Organization and Management Plan)
Sources
- 1RC Commun à tous les lots SIGNE.pdf — “(4 fiches maximum) Note technique détaillée concernant l'opération. Cette note permet au RPA d'apprécier à la fois la pertinence et la qualité technique de la solution proposée par le candidat au regard des éléments du C…”
- 2RC Commun a tous les lots SIGNE.pdf — “proposée par le candidat au regard des éléments du CC l'Y, et de s'assurer de la prise en compte de cette problématique. Le candidat joint dans cette note technique tout élément qui permet de présenter, expliquer et just…”
- 3Cadre memoire technique - LOT1.docx — “autre élément qui permet de présenter, expliquer et justifier la solution qu’il propose. 3.3. Voirie Décrire de manière détaillée le procédé retenu (ainsi que note de calcul) pour la création de la nouvelle voirie compre…”
- 4Cadre memoire technique - LOT2.docx — “prises pour assurer la gestion des déchets, la méthodologie mise en place ainsi que les moyens de traçabilités. 2.2. Présence du SOGED Fournir un Schéma d’Organisation et de Gestion des Déchets (SOGED) cohérent avec la s…”
- 5LOT 2 - ST2 - CCTP - CVC Plomberie.pdf — “d’exécuter tous les travaux de son corps d’état ou faire l’objet d’une demande d’augmentation de prix. *NOTE : L’Entreprise adjudicataire du présent lot tiendra compte du fait que les plans joints au dossier ne sont que…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 35 FILES
- PJ4 - Annexes G2 PRO - 06_05_2026.pdf1.1 MBPDF
- SOSED.PDF468 KBPDF
- Annexe 1 CCAP_PROCEDURE DECLARATION ACCIDENTS ESID BDX.pdf4.3 MBPDF
and 28 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.