Published
Accord-cadre à bons de commande multi-attributaires pour prestations de contrôle technique et missions connexes
Notice number: 00522813-2026
KEY INFORMATION
- Submission deadline
- • Sep 10, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Sa hlm des chalets
- Accepted Languages
- French
- Tender type
- Services
- Contract Value
- Published date
- Jul 29, 2026
TENDER DESCRIPTION
This tender outlines a multi-award framework agreement for technical inspection and related diagnostic services across various new construction and rehabilitation projects. The core scope encompasses a wide range of missions for new buildings, including parasitic state realizations, acoustic and air permeability testing, ventilation verification, energy performance diagnostics, and Carrez Law measurements, alongside extensive base and additional technical control missions (e.g., F, GTB, HYS, ENV, LE, AV, Pha, PV, CO, SEI, STI, PARK, RE2020 conception and realization). For rehabilitation operations, services include specific technical control missions (LP, SH, TH, LE), energy performance diagnostics, and additional missions (e.g., F, GTB, HYS, Phh, ENV, Pha, PV, CO, Sei, STI, HAND, ATT, Brd, AV), with all desired missions detailed in individual purchase orders. Required technologies and methodologies include the Freedz platform, RE 2020 CARBONE, and RE 2020 for regulatory air permeability tests. The framework agreement is anticipated to cover provisional operations over a four-year period with potential renewals, while individual project execution times vary from less than 2…
TENDER BRIEF
The contract timeline is defined by a framework agreement that allows for individual operations, rather than a single fixed duration. While a definitive contract start and end date for the overall agreement are not explicitly stated, the documents mention "Nombre d'opérations prévisionnel sur 4 ans" (Provisional number of operations over 4 years), suggesting a potential duration of 4 years for the operations conducted under the agreement. The validity of offers is 6 months from the submission deadline of September 10, 2026. The contract also allows for renewals.
For individual construction projects or phases, the execution times vary:
- For rehabilitation operations, the execution time can range from less than 2 months to more than 30 months.
- For new operations, the execution time can range from less than 9 months to more than 30 months.
Specific examples of work phases and durations are provided:
- In a scenario with a time gap between phases, "Phase 1 travaux" takes 8 months, followed by a two-month pause, and "Phase 2 travaux" takes 9 months, resulting in a total works duration of 17 months.
- In a scenario with superimposed phases, "Phase 1 travaux" takes 8 months, and "Phase 2 travaux" begins 6 months into the first phase and takes 9 months, leading to a total works duration of 15 months.
Individual purchase orders ("bons de commande") will specify the provisional start date of the works and the execution time of the construction site.
Sources
- 11-Bordereau de Prix DQE.xlsx — “M € < C =< 1 M €",1 M € < C =< 2 M €,, ,Coût de l'opération,250000,750000,1500000,, ,% / opération,0,0,0,, ,Montant du BDC,0,0,0,, ,Nombre d'opérations prévisionnel sur 4 ans,1,1,1,, ,Total prévisionnel,0,0,0,, ,Total pr…”
- 2LDM42194_AAPC.pdf — “: Non Reconductions Oui Conditions relatives au contrat Autres conditions Conditions particulières d'exécution : Conditions de participation Critères de participation : renvoi au R.C. Marché réservé : Non Informations su…”
- 3CCP.pdf — “d'exécution de la phase 2 Phase 2 travaux: 9 mois Délai des travaux de 15 mois Le titulaire de l'accord cadre ne pourra prétendre à une rémunération supplémentaire en cas de superposition ou de décalage temporel d'une ou…”
The core scope of work for this tender involves various technical control and diagnostic missions for both new construction and rehabilitation operations.
For new constructions, the services include:
- Realization of parasitic states in new buildings.
- Acoustic testing.
- Air permeability testing.
- Ventilation system verification.
- Energy performance diagnostics.
- Carrez Law measurements.
- Parasitic states for land.
- Base missions and additional missions such as F, GTB, HYS, ENV, LE, AV, Pha, PV, CO, SEI, STI, PARK, RE2020 conception, and RE2020 realization.
For rehabilitation operations, the services include:
- Technical control missions, specifically LP, SH, TH, and LE, both as common core missions and LP missions outside the common core.
- Energy performance diagnostics for buildings under rehabilitation.
- Additional missions such as F, GTB, HYS, Phh, ENV, Pha, PV, CO, Sei, STI, HAND, ATT, Brd, and AV.
The tender also refers to "Missions de contrôles techniques souhaitées" and "Missions connexes éventuellement souhaitées" which are to be indicated in the purchase order. These services are broken down by the duration of the execution phase, ranging from less than 2 months to over 30 months for rehabilitation operations, and less than 9 months to over 30 months for new operations.
Sources
- 11-Bordereau de Prix DQE.xlsx — “,PF,Total,, ,6,5,0,0,, ,TOTAL,,,0,, ,,,,,, , REALISATION ETATS PARASITAIRES DANS BATIMENTS NEUFS,,,,, ,Logt individuel,,,,, ,Nombre de BDC prévisionnel sur 4 ans,Nbre moyen de logts / opération,PU / logt Individuel,Total…”
- 2CCP.pdf — “d'exécution de la phase 2 Phase 2 travaux: 9 mois Délai des travaux de 15 mois Le titulaire de l'accord cadre ne pourra prétendre à une rémunération supplémentaire en cas de superposition ou de décalage temporel d'une ou…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 14 FILES
- AWS-Achat_depot-sans-signature.pdf572 KBPDF
- 1-Bordereau de Prix DQE.xlsx71 KBXLSX
- CCP.pdf766 KBPDF
and 7 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.