TENDER DESCRIPTION
This framework agreement seeks comprehensive project management services for the urban renewal of the Marc Pourpe Residence in Lorient, encompassing urban master planning, elaboration of regulatory dossiers, development permit applications, and detailed urban, architectural, and environmental coordination, alongside public information and consultation facilitation. Key technical specifications mandate integrated rainwater management prioritizing nature-based solutions with zero discharge to public networks, specific semi-underground and integrated parking requirements, and provisions for a future urban heating network, all adhering to homologated standards and requiring electronic submission and invoicing. The framework agreement is established for a duration of six years from notification, with subsequent contracts defining specific completion times for missions, and bidders are required to provide proof of professional civil liability insurance and their global turnover from the last three years.
TENDER BRIEF
The contract timeline is as follows:
- Total Duration: The framework agreement is concluded for a duration of 6 years. The urban renewal/renovation operation is estimated to have a realization period of 6 years.
- Contract Start Date: The framework agreement starts "à compter de sa notification" (from its notification). The notice for this contract was dispatched to JOUE on July 7, 2026, and published on July 9, 2026.
- Contract End Date: Implicitly 6 years after the notification date of the framework agreement.
- Key Milestones/Phases:
- The framework agreement itself is not renewable.
- Subsequent contracts (marchés subséquents) concluded under the framework agreement will have their specific completion times determined by those individual contracts. These subsequent contracts are also not renewable.
- Estimated duration for specific mission steps:
- Step 1: Preliminary design studies (AVP) - 8 weeks.
- Step 2: Project studies (PRO) - 5 weeks.
- Step 3: Assistance with contract award for works (ACT) - 5 weeks.
- Step 4: Supervision of works execution (DET) - Following the works schedule.
- Step 5: Examination of conformity of execution studies and their approval.
Sources
- 126S0121 CONVENTIONAC RUMARCPOURPE.pdf — “l'offre financière du titulaire définis dans les marchés subséquents ainsi que ceux qui seraient rendus contractuels lors de la mise au point des marchés. 5. DURÉE DE L'ACCORD-CADRE ET DES MARCHES SUBSEQUENTS - PENALITES…”
- 200.0-AAPC_rectificatif_15-07-2026_604.pdf — “l’accord-cadre : La présente opération de renouvellement urbain / de rénovation urbaine, dont la durée de réalisation est estimée à 6 années, nécessite l'intervention d'un maître d'œuvre urbain dans la durée, afin de gar…”
- 3AAPC RUMARCPOURPE.pdf — “note méthodologique et de l’audition : 60 % Se référer au règlement de la consultation pour le barème détaillé. Durée de validité des offres : 120 jours à compter de la date limite de remise des offres finales. Variante…”
- 426S0121 CCTP RUMARCPOURPE.pdf — “entreprises concernées, assorti d’une décision du représentant légal du Maître d’ouvrage les mettant en demeure de remédier aux défauts signalés. Constat de non-achèvement Si l’entrepreneur n’a pas déféré à la mise en de…”
The core scope of work for this tender primarily revolves around urban master planning and development, encompassing several key missions and deliverables.
Core Scope of Work / Statement of Work Summary:
- Elaboration of Regulatory Dossiers and Development Permit Applications: This includes preparing complete regulatory dossiers, applying for development permits ("permis d'aménager"), providing all necessary graphic documents, notices, and regulatory annexes, and responding to requests for additional information from instructing services. Editable and PDF versions of documents are required.
- Urban, Architectural, and Environmental Coordination: This mission involves the comprehensive coordination of urban, architectural, and environmental aspects of the project.
- Urban Master Planning for Public Spaces and Plot Development: This focuses on the design and engineering of public spaces and the viability of development plots ("viabilisation des illots").
- Assistance and Facilitation of Information and Consultation: This involves supporting and animating processes for information dissemination and public consultation.
- Project Study Services: These services require sufficient precision to assign responsibility, enable contractor pricing, and establish execution plans. Key activities include defining the overall solution for infrastructure, confirming technical, architectural, and landscape choices, specifying materials and implementation, and determining characteristics and dimensions of works for execution.
- Cost Estimation and Planning: This involves establishing provisional costs for works based on preliminary measurements, broken down by lots and technical elements, and allowing for the determination of the overall project completion timeline.
High-Level Deliverables:
- Complete regulatory dossiers, ready for submission.
- Application for a development permit.
- All required graphic pieces, notices, and regulatory annexes, in both editable (DWG, office) and PDF formats.
- Project studies, including preliminary dimensioning of structures and technical installations with supporting calculations.
- General project composition and orientation plans, delimitation plans for buildable lots and public spaces, road plans, ecological continuity schemes, and program distribution schemes.
- Explanatory notes on the program, development orientations, and projected developments, along with summary hydraulic studies.
- Comparative analysis of scenarios with multi-criteria analysis for decision support.
- Technical feasibility studies for networks and roads, including infrastructure project conception and principle plans of networks with connections to existing public or private networks.
- Communication and consultation materials, such as presentation plans, diagrams, maps, exhibition panels, presentation slides, educational documents, infographics, photomontages, and perspectives.
- Minutes and synthesis notes from consultation actions, identifying observations, expectations, and potential project impacts.
Sources
- 126S0121 ANNEXE1 DPGF.pdf — “| MISSION: Elaboration des dessiers réglementaires et du dossier de permis d'aménager | Quantite estimative | Collt unitaire | HT en C pour quantite estimative | Honoraires HT | PU | PU | PU | PU | PU | PU | e | | | F F…”
- 226S0121 CCTP RUMARCPOURPE.pdf — “des incidences éventuelles des prescriptions réglementaires sur le projet d'aménagement, le coût prévisionnel de l'opération, le calendrier ou les modalités de réalisation. Livrables Selon les bons de commande qui seront…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 10 FILES
- 26S0121 ANNEXE declarationsurlhonneur.pdf151 KBPDF
- 26S0121 PLANDELOCALISATION.pdf405 KBPDF
- 26S0121 ANNEXE1 DPGF.pdf84 KBPDF
and 3 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.