Published
Matériels, accessoires informatiques et services associés, périmètre Hauts-de-France et Normandie
Notice number: 26-99609
KEY INFORMATION
- Submission deadline
- • Nov 2, 2026
- Location
- 🇫🇷 France
- Contracting authority
- CAP Territoires (60)
- Accepted Languages
- FRA
- Tender type
- Goods
- Contract Value
- Published date
- Oct 15, 2026
TENDER DESCRIPTION
This framework agreement, identified as AC 26-018 Lot 1, covers the comprehensive supply of IT equipment, accessories, and associated services specifically for the Hauts-de-France and Normandy regions. The scope encompasses supply and installation, extended maintenance and technical support, provision of service personnel, certified repurchase of old equipment with data erasure, and rigorous commercial and progress planning, alongside strict adherence to GDPR and environmental reporting. Key technical specifications include support for Windows 11 Pro, TPM 2.0, Wi-Fi 6/6E, Android (minimum 3 years updates), iOS, various display resolutions up to UWQHD, specific connectivity (HDMI, DisplayPort, USB-C with power delivery, Ethernet ≥ 1 Gbit/s), SSD NVMe, VESA compatibility, and Apple M4/M5/M5 Pro chips, with all products compliant with Article 58 of the AGEC Law. Bidders must declare global and specific annual turnover for the last three financial years, with provisions for newly established companies. The contract commences on April 6, 2027, or upon notification, with a one-month preparation period followed by an execution period of 12 months, tacitly renewable three times for 12…
TENDER BRIEF
The contract timeline is as follows:
- Contract start date: The framework agreement takes effect from April 6, 2027, or the date specified in the notification letter.
- Phases: The agreement comprises a preparation period and an execution period.
- Preparation period: 1 month, starting from the effective date of the framework agreement's notification. During this period, the contractor must attend a launch meeting within 5 working days of notification and submit technical data sheets and visuals for all products listed in the BPU.
- Execution period: 12 months, commencing after the preparation period concludes.
- Renewal: The agreement can be tacitly renewed three times, with each renewal lasting 12 months.
- Total duration: The total duration of the framework agreement, excluding the preparation period, cannot exceed 48 months (4 years).
- End date: Not explicitly stated as a fixed date, but the maximum possible duration implies an end date. Considering the start date of April 6, 2027, a 1-month preparation period, and a maximum of 48 months for execution, the latest possible end date for the execution period would be April 6, 2031. The duration of purchase orders may extend beyond the framework agreement's expiration, provided they were issued before that date and their execution timeframe is clearly indicated on each order.
Sources
- 126-018RCV2.pdf — “PSE obligatoires Sans objet. Marché 26-018/RC Page 5 sur 21 4.2.2 PSE facultatives Sans objet. Article 5 - Durée de l'accord-cadre Le présent accord-cadre comprend une période de préparation et une période d'exécution. L…”
- 226-018CCAP.pdf — “de 1 mois à compter de la date d'effet de notification de l'accord-cadre. L'éventuelle prorogation prévue à l'article 9.3 ne saurait proroger la date de fin de l'accord-cadre. Les délais intermédiaires sont précisés aux…”
The core scope of work for this tender, identified as AC 26-018, involves the supply of IT equipment, accessories, and associated services. This includes specific lots such as Lot 1 covering the Hauts-de-France and Normandie regions, and Lot 5 for the Auvergne-Rhône-Alpes region, both pertaining to the supply of IT equipment, accessories, and associated services.
The Statement of Work (SOW) and core deliverables encompass several key areas:
- Supply and Installation Services: This includes prior labeling of materials, unpacking, installation at workstations, connection, power-on, and removal of packaging. It also covers tablet preparation, such as case and screen protector installation for ready-to-use delivery, and deployment services for blocks of 10 or 100 PCs.
- Maintenance and Support: The tender requires extended maintenance beyond the manufacturer's warranty for various PC models, directly managed by the contractor. It also includes details on the scope of coverage and exclusions for warranties and maintenance contracts, warranty registration, and technical support, covering availability, reactivity, incident management, escalation processes, coordination with manufacturers, and quality assurance.
- Service Personnel Provision: The provision of technicians, project managers, and park managers, available for both on-site and remote assistance, is a key service.
- Equipment Repurchase and Data Management: The contractor must demonstrate the capacity to repurchase old equipment (PCs, tablets, screens), regardless of initial supply, including financial valuation methods, on-site removal logistics, and certified data erasure with proof provided.
- Commercial and Progress Planning: A business plan is required, detailing objectives for the first and second semesters, including the number of organizations to be contacted, effective proposals (pipeline), and new beneficiaries (signatures) to be integrated into the new market. This plan must specifically target organizations not currently within CAP Territoires' portfolio for the market's purchase family. Additionally, a progress plan is essential for monitoring and developing the framework agreement, incorporating performance indicators such as the number of orders, customer details, average order value, total deliveries, delivery errors, incomplete orders, complaints, customer returns, delivery times, and quality compliance. The contractor is expected to propose a realistic frequency for transmitting this performance dashboard and actively contribute to improving service quality.
- Operational Procedures: The tender outlines various operational aspects, including contract reviews, order formalities, procedures for modifying the framework agreement, a development plan for the agreement, delivery conditions (general, deadlines, delivery notes, proof of delivery), and verification and reception operations (quantitative and qualitative).
- Reporting and Compliance: The contractor must provide reportings related to sales statistics, environmental data, and circular economy initiatives. Furthermore, obligations regarding GDPR, confidentiality, and data protection must be strictly adhered to.
Sources
- 126-018CadredeReponsecriteres234V3.xlsx — “plan de progrès permet un suivi de l’accord-cadre, mais aussi un développement de celui-ci. Exemple : tableau (ou camembert ou autre) de bord de suivi de performance de l’accord-cadre et/ou de la centrale contenant des i…”
- 226-018BPUV4.xlsx — “unitaire € HT",Commentaires du candidat Prestations diverses,,,,, SRV-01,Étiquetage préalable,"Étiquetage des matériels avant livraison selon les consignes du bénéficiaire (inventaire, code-barres, …)",par équipement,, S…”
- 326-018AE.pdf — “indiqués ci-dessus devront être réalistes et réalisables sous peine d'application des pénalités prévues au CCAP. Article 9: Business Plan (1) Tableau à compléter Comme énuméré dans le règlement de la consultation, le can…”
- 426-018CCAP.pdf — “de la période de préparation 12 9.2 Eléments attendus...... 13 9.3 Validation des éléments par le pouvoir adjudicateur.. 18 Article 10-Modalités d'exécution de l'accord-cadre 18 10.1 Revues de contrat..... 18 10.2. Forma…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 11 FILES
- 26-018Fichecontactmarche.docx60 KBDOCX
- 26-018CCTP.pdf1.6 MBPDF
- 26-018RCV2.pdf4.9 MBPDF
and 4 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.