    Antsla reoveepuhasti energiatõhususe tõstmise projekteerimis-ehitustööd

    Notice number: 313527-0000

    🇪🇪 Estoniaaktsiaselts VÕRU VESIWorks

    KEY INFORMATION

    Submission deadline
    Sep 30, 2026
    Location
    🇪🇪 Estonia
    Contracting authority
    aktsiaselts VÕRU VESI
    Accepted Languages
    Estonian
    Tender type
    Works
    Contract Value
    Published date
    Jul 24, 2026

    TENDER DESCRIPTION

    This tender seeks a fixed-price, design-build turnkey contractor for the comprehensive energy efficiency improvement of the Antsla Wastewater Treatment Plant, aiming to achieve an approximate 32% reduction in energy consumption, equating to 48,229 kWh/a savings. The scope encompasses existing situation analysis, detailed design, replacement of equalization tank pumps and mixer, SBR blowers, sludge thickener blower, SBR mixers and aerators with demand-based control, full purification process automation, ammonium measurement, energy and airflow monitoring, and SCADA interfacing. Key technical requirements include the implementation of SCADA, frequency converters, advanced automation, hydraulics and control systems, demand-driven control, and ammonium-based aeration control for optimized energy efficiency. The project has a total duration of 12 months from contract signing, with a phased completion including design submission within 4 months and reconstruction, commissioning, and a 30-day trial run completed within 11 months, alongside a financial qualification requiring a minimum average annual turnover of 160,000 EUR for the period 2023-2025 and no outstanding tax or social…

    TENDER BRIEF

    The contract timeline is as follows:

    The total duration for the performance of works is 12 months from the signing of the contract.

    Key milestones and phases include:

    • Phase I: Up to 2 months from the signing of the contract, which involves completing necessary surveys and checking initial data for the design, with the findings submitted to the Client.
    • Phase II: Up to 4 months from the signing of the contract, by which time the working design must be complete, coordinated with relevant parties, and submitted to the Building Register for the construction permit or notification process.
    • Phase III: Up to 11 months from the signing of the contract, during which the wastewater treatment plant must be reconstructed, technical commissioning and at least a 30-day trial run successfully completed, analyses and adjustments made, and as-built documentation submitted to the Client.

    The full execution time of 12 months from the contract signing also includes rectifying any deficiencies found during the trial run, coordinating the complete as-built documentation with the Client, and submitting the proper application for an occupancy permit along with all required documents to the Building Register. The time taken for the issuance of the occupancy permit is not part of the Contractor's deadline, provided the delay is not attributable to the Contractor's fault or inaction.

    Sources

    • 1II OSA Lepingutingimused.pdf — “| Viide ETÜ tingimuste punktile Tingimuse määratlus või sõnastus | | Tellijale esitatud. | | Etapp II - kuni 4 kuud lepingu sõlmimisest: tööprojekt on valmis, asjaosalistega kooskõlastatud ja ehitusloa või -teatise menet…

    The core scope of work for this tender, titled "ANTSLA REOVEEPUHASTI ENERGIATÕHUSUSE TÕSTMISE PROJEKTEERIMIS-EHITUSTÖÖD" (Antsla Wastewater Treatment Plant Energy Efficiency Improvement Design-Build Works), is a fixed-price design-build turnkey contract focused on enhancing the energy efficiency of the wastewater treatment plant.

    The Statement of Work summary and core deliverables include:

    • Existing Situation Analysis and Data Verification: Control and analysis of the current operational state and initial data.
    • Design and Approvals: Comprehensive design works for all project stages, including hydraulics, control systems, air systems, wash water booster systems, technology, structures, fasteners, pipelines, electrical installations, automation, measurement, SCADA, temporary work arrangements, occupational safety, and restoration. This also covers obtaining necessary approvals, notices, and permits.
    • Energy Efficiency Improvement Works: This involves specific equipment replacements and optimizations, such as:
    • Replacement of equalization tank pumps (4 pcs) and mixer (1 pc) with new control systems.
    • Replacement of batch reactor air blowers (3 pcs) and sludge thickener air blower (1 pc), along with air consumption optimization.
    • Replacement of aerators in two SBR tanks and SBR mixers (2 pcs) with demand-based control.
    • Automation of the purification process.
    • Implementation of ammonium measurement and aeration control (2 sensors).
    • Energy and process measurement and monitoring, including two air flow meters.
    • SCADA and remote control interfacing.
    • Analysis and optimization of EP.1 and MT.1 washing cycles and booster pump P.11 operation.
    • Demolition, installation, and management of temporary work arrangements.
    • Verification and documentation of achieved energy efficiency performance requirements.
    • Construction and Installation Works: This covers all civil and structural works, including equipment carriers, foundations, guides, lifting points, penetrations, corrosion protection, surface coatings, finishing, and ensuring water tightness and structural reliability.
    • Air Ducting and Associated Components: Installation of all necessary pipes, compensators, valves, condensate removal systems, measuring points, carriers, penetrations, marking, and insulation.
    • Electrical, Automation, Measurement, Cabling, and Interface Works: Including all related electrical installations, automation systems, measurement devices, cabling, and system interfaces.
    • Testing, Commissioning, and Handover: Conducting testing, commissioning, and a minimum 30-day trial run.
    • Documentation, Training, and Warranty: Providing all required documentation, training for the client's personnel, and fulfilling warranty obligations.
    • Restoration Works: Restoring any damaged surfaces and systems to their pre-work condition.

    The overall objective is to achieve an energy saving target of approximately 48,229 kWh/a, representing a 32% reduction compared to the energy audit baseline, with a target annual plant consumption of approximately 102,216 kWh/a and a specific electricity consumption of up to 70 kWh/(ie-a).

    Explicitly excluded from the scope are the establishment of solar electricity or battery storage systems, and modifications to the main sludge treatment process, apart from the specified sludge thickener blower replacement, air consumption optimization, and analysis/optimization of specific washing cycles. Owner's supervision services are also not part of the contractor's scope.

    Sources

    • 1IV OSA Loendid.xlsx — “HANKEDOKUMENDID OSA IV: LOENDID,,,,, ,,,,, Riigihange:,ANTSLA REOVEEPUHASTI ENERGIATÕHUSUSE TÕSTMISE PROJEKTEERIMIS-EHITUSTÖÖD,,,, Viitenumber:,313527,,,, Hankija nimi:,AS VÕRU VESI,,,, ,,,,, ,,,,, ,,,,, Nr.,Töö nimetus,…
    • 2IV OSA Loendite preambula.pdf — “Hankija | AS VÕRU VESI Projekt | ANTSLA REOVEEPUHASTI ENERGIATÕHUSUSE TÕSTMISE PROJEKTEERIMIS-EHITUSTÖÖD Riigihanke nr | 313527 Hankemenetlus | Lihthankemenetlus 2026 HANKEDOKUMENDID IV OSA LOENDITE PREAMBULA Hankedokume…
    • 3III OSA Töökirjeldus.pdf — “puhasti aastane sihttarbimine on ligikaudu 102 216 kWh/a ja spetsiifiline elektritarve kuni $70~kWh/(ie\cdot a)$ kui koormus ja vooluhulgad vastavad lähteandmetele. Nimetatud 32% säästu- ja $70~kWh/(ie\cdot a)$ sihttase…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 34 FILES

    • SR4230.010_STD_2.2kW_3.0hp_3~_50_60_380 V.pdf
    • I OSA Juhised pakkujale.pdf
    • 313527_ESPD_v2.0_laiendatud.xml

    and 27 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders