TENDER DESCRIPTION
This tender seeks comprehensive architectural services for the outdoor facilities and green roofs, including a PV system, of buildings E and F at Hochschule Heilbronn as part of a major renovation. The scope encompasses basic services for HOAI service phases 1-9, along with special services for phases 1-4 and 9, integrating extensive BIM-related duties such as model creation, quantity derivation, and logistics planning, utilizing technologies like VDI 2552 Blatt 12.1, ISO 19650, a Common Data Environment, and GAEB interfaces. Preliminary planning is targeted for completion by January 31, 2027, with provisions for further agreed-upon contract dates and the commissioning of additional services within 36 months of prior service completion. Bidders must demonstrate financial stability through professional liability insurance covering €3.0 million for personal injury and €5.0 million for other damages, along with a minimum annual net turnover of €100,000 in relevant activities for the last three fiscal years.
TENDER BRIEF
The contract timeline includes several key milestones and phases, but a definitive contract start date, overall contract end date, or total duration for the main contract are not explicitly stated.
Key Milestones and Phases:
- Completion of preliminary planning: By January 31, 2027.
- Further contract dates: These will be agreed upon with the further commissioning according to § 3 number 3.3.
- Project Phases (Leistungsphasen): The contract refers to Leistungsphase 2-3, 4, 5, 6-7, 8, and 9 for personnel deployment.
- Project Phases (Organisational): The project is structured into "Planung" (Planning), "Ausschreibung / Vergabe / Abrechnung" (Tendering / Award / Billing), and "Baudurchführung" (Construction Execution).
- Framework Schedule (Rahmenterminplan): A framework schedule is to be established at the project start, detailing the overall project, processing/approval periods, critical processes, and important milestones.
- Updating Schedules (Fortschreibung Terminpläne): The schedule is to be updated during the planning phase, with a detailed schedule including deadlines for award periods recommended by Leistungsphase 3.
- Tendering / Award Phase Schedule (Terminplan in der Ausschreibungs- / Vergabephase): The client is to prepare an award schedule after receiving the planning order. The contractor must create an award schedule for the executing trades no later than Leistungsphase 6.
- Execution Schedule / Construction Schedule Planning (Ausführungsterminplan / Bauablaufplanung): During the execution phase, the schedule must be updated and monitored to include detailed steps such as acceptances, defect management, commissioning, handover to users, and documentation.
- Duration for additional services: The client can commission additional services within 36 months after the completion of previously commissioned services.
Not stated:
- Contract start date.
- Contract end date for the main contract.
- Total duration for the main contract.
Sources
- 1M211_Vertrag_Freianlagen_26-40183.docx — “Auftragnehmer ist verpflichtet, solche Leistungsänderungen, Leistungserweiterungen oder Zusatzleistungen auszuführen, es sei denn, das Büro der Auftragnehmerin oder des Auftragnehmers ist auf solche Leistungen nicht eing…”
- 2Anlage zum Vertrag_Organisationshandbuch_blanko.pdf — “(03/2025) Seite 26 von 29 7 HINWEISE ZU PROJEKTPHASEN 7.1 Planung Die Haftung des AN für die Richtigkeit und Vollständigkeit seiner Leistungen wird durch die Abstimmung mit dem AG und die Entgegennahme von Arbeitsergebni…”
The core scope of work for this tender involves architectural services for outdoor facilities ("Freianlagen") and green roofs ("Dachbegrünung") of buildings E and F, including a PV system, as part of the overall renovation of Hochschule Heilbronn.
The Statement of Work summarizes the following service phases and core deliverables:
- Leistungsphase 1: Grundlagenermittlung (Basic Evaluation)
- Clarifying the task and advising on planning methods.
- Site inspection.
- Documenting results.
- Special Services: Creating an existing model of the processing area, including connections to existing outdoor facilities, trees, fire department access, terrain, art installations, and paths/squares.
- Leistungsphase 2: Vorplanung (Preliminary Planning)
- Analyzing fundamentals, coordinating services with involved parties, including BIM execution plan (BAP) and data exchange.
- Developing a planning concept with variant evaluations, considering topography, ecological, environmental, design, and functional requirements.
- Presenting the preliminary design in a digital model with explanations and timeline.
- Cost estimation according to DIN 276 - 1: 2018-12.
- Special Services: Assessing and evaluating existing artistic installations ("Kunst am Bau"), developing integration and protection concepts.
- Special Services: Assessing and evaluating existing trees/vegetation, developing preservation and protection concepts.
- Leistungsphase 3: Entwurfsplanung (Design Planning)
- Developing the design based on preliminary planning, deepening various requirements (design, functional, economic, ecological, etc.).
- Coordinating planning with relevant authorities.
- Presenting the design in a digital model (scale 1:500 to 1:100) with details on planting, materials, legal measures, and timeline.
- Object description including compensation and replacement measures.
- Cost calculation according to DIN 276 - 1: 2018-12.
- Special Services: Updating concepts for existing artistic installations and protection concepts for trees/vegetation.
- BIM-Related Duties (across various phases)
- Planning documentation at the end of service phases 2, 3, 4, 5, and 8.
- Rule-based derivation of quantities and cost estimations from BIM models.
- Element-based determination of masses and quantities from digital models, exported to lists.
- Planning and communication of logistics processes (e.g., construction site setup, traffic areas).
- Regular comparison of planned (As-Planned) with actual (As-Built) construction progress, including transferring selected point clouds for documentation.
The tender also outlines the potential for the client to commission further services in Leistungsphase 6 (Vorbereitung der Vergabe - Preparation for Award) and Leistungsphase 7 (Mitwirkung bei der Vergabe - Assistance in Awarding).
- Leistungsphase 6 (Preparation for Award): Preparing service descriptions with bills of quantities, determining quantities, coordinating descriptions, developing a schedule, determining costs, and cost control.
- Leistungsphase 7 (Assistance in Awarding): Reviewing and evaluating offers, participating in bidder discussions, preparing award proposals, and cost control.
Sources
- 1M211_Anl1_AIA_V9_Freianlagen_BIM_26-40183.docx — “Vertragsnummer.: | 26-40183 Objekt: | Hochschule Heilbronn, Gesamtsanierung E+F mit PV, Max-Plank-Straße.39, 74081 Heilbronn Freianlage: | 1.2.1 | Freianlagen Bauteile E und F einschließlich Innenhöfe, Campusanbindung un…”
- 2M211_Vertrag_Freianlagen_26-40183.docx — “für die Herbeiführung des Gesamtwerkerfolgs erforderlich sind. Hierbei hat die Auftragnehmerin oder der Auftragnehmer insbesondere die in der Anlage 1 gekennzeichneten Leistungen zu erbringen, die als wesentliche Arbeits…”
- 3M120_Angebotsschreiben_26-40183.docx — “| Bieterin/Bieter: | | | | Vermögen und Bau Baden-Württemberg Amt Heilbronn Rollwagstr. 16 74072 Heilbronn Vergabenummer | : | 26-40183 Projekt | : | Hochschule, BT E + F, Gesamtsanierung + PV-Anlage, Max-Planck-Str. 39,…”
- 4Anlage zum Vertrag_BAP BIM-Pflichtenheft.pdf — “und Dokumentenableitung | Planungsdokumentation zum Abschluss der Leistungsphase 2, 3, 4, 5 und 8 gemäß Arbeitsmittel Dokumentation Pläne und Daten". | Mengen- und 100 Kostenermittlung Mengen- und Massenermittlung | Rege…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 24 FILES
- M130_Wertung_Zuschlagskriterien_26-40183.pdf81 KBPDF
- M107_3_Verpflichtungserklaerung_Eignungsleihe_26-40183.docx27 KBDOCX
- Stand 2022-08_Modell-Informationsanforderungen_CAFM.pdf112 KBPDF
and 17 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.