TENDER DESCRIPTION
This tender solicits comprehensive Photovoltaic Installation services for the "Neubau Verfügungsgebäude 1.BA CatLab" project at the Helmholtz-Zentrum Berlin für Materialien und Energie GmbH. The scope includes the supply and installation of PV modules, substructures, inverters, cabling, safety systems, potential equalization, and fall protection, culminating in expert acceptance, issuance of a system certificate B, and full commissioning. Critical technical specifications mandate documentation in digital and paper formats, adherence to a common plan server for planning status, and the use of fastening systems with "Allgemeine bauaufsichtliche Zulassung" or project-specific approval, with restrictions on drilling in reinforced concrete. Proposers must submit turnover information for the past three financial years related to construction services, as per Form 124 "Self-declaration of suitability." The contract requires execution to begin within a specified timeframe after order receipt, with key milestones including workshop planning submission six weeks post-award, construction start between calendar weeks 6-10 of 2027, and project completion by September 30, 2027.
TENDER BRIEF
The contract timeline is as follows:
- Contract start date: The execution is to begin no later than 5 working days after the receipt of the order letter, or within 12 working days after a request from the client, or according to the start date specified in the attached construction schedule. The client is expected to issue the request by a date that is not explicitly stated in the document.
- Contract end date: The performance is to be completed (ready for acceptance) by September 30, 2027.
- Total duration: Not explicitly stated as a single value.
- Key milestones or phases:
- Submission of verifiable and complete workshop and assembly planning: 6 weeks after contract award.
- Start of construction: Between calendar weeks 6 and 10 of 2027. The client will provide the exact start date 4 weeks in advance through a separate performance call-off.
- End of installation work: Calendar week 18 of 2027.
Sources
- 1214_Besondere Vertragsbedingungen.pdf — “Maßnahme BA CatLab Photovoltaik Leistung Photovoltaikinstallation BESONDERE VERTRAGSBEDINGUNGEN 214 (Besondere Vertragsbedingungen) Vergabenummer V454_2026 1 Ausführungsfristen (§ 5 VOB/B) 1.1 Fristen für Beginn und Voll…”
- 2Bekanntmachung_E65436149.pdf — “2] j) Nebenangebote ☐ zugelassen 121 (Bekanntmachung Öffentliche Ausschreibung) - Innerhalb der 6.KW-10. KW 2027 erfolgt der Baubeginn, der AG teilt den genauen Termin für den Baubeginn 4 Wochen vorher durch einen gesond…”
The core scope of work for this tender involves the comprehensive "Photovoltaic Installation" for the "Neubau Verfügungsgebäude 1.BA CatLab" project at the Helmholtz-Zentrum Berlin für Materialien und Energie GmbH (HZB).
The core deliverables and statement of work summary include:
1. Photovoltaic Installations:
- Laying systems: Installation of the necessary systems for mounting the PV components.
- Distributors, inverters, and accessories: Provision and installation of all required electrical components for power distribution and conversion.
- PV modules and substructures: Supply and assembly of photovoltaic modules and their supporting substructures.
- Cables and lines: Installation of all necessary cabling and wiring for the PV system.
- Potential equalization and overvoltage protection: Implementation of measures for potential equalization and protection against overvoltage.
- Fall protection and installation: Provision and installation of fall protection systems.
- Documentation and revision documents: Creation of all required documentation and revision records for the installation.
- Acceptance and commissioning: This includes expert acceptance by a sworn expert, issuance of a system certificate B (Anlagenzertifikat B according to VDE-AR-N 4110), and the overall commissioning of the PV system, along with instruction for personnel.
2. Special and Other Services:
- As-built documentation/Documentation/BNB:
- Creation of as-built documentation, including as-built plans (1:100/1:50 scale), schematic diagrams, wiring diagrams, cable lists, data point lists, system and functional descriptions, programs and software, operating instructions, maintenance instructions, equipment, material, and spare parts lists, as well as a list of manufacturers and suppliers. This documentation must be submitted in both DIN A4 folder format and digitally.
- Creation of as-built documentation on data carriers in dwg/dxf format.
- Documentation of building materials for BNB (Sustainable Building) certification. This involves providing complete documentation of all used building materials according to sustainable building criteria, including product data sheets, technical data sheets, safety data sheets, and any other relevant documents, test certificates, or proofs regarding ingredients and properties that could affect health, indoor air, or the environment.
- Coordination with the BNB coordination, including digital submission of an Excel table with data sheets for all materials 4 weeks before installation. Non-approved products must be changed until a complete approval list is available.
Sources
- 1HZB_PV-Anlage_LV PV-Anlage.pdf — “dürfen nicht verbaut oder eingebaut werden. | | | Die schriftliche Übergabe muss in einem Ordner im DIN-A4 Format sowie digital erfolgen und mit Registern und einem Inhaltsverzeichnis versehen sein. | | | 1,000 psch | |…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 26 FILES
- 124_Eigenerklärung zur Eignung.pdf128 KBPDF
- HZB_PV-Anlage_LV PV-Anlage.P83244 KBP83
- BNB_LN2020_414.pdf184 KBPDF
and 19 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.