TENDER DESCRIPTION
This European public procurement seeks a comprehensive Battery Energy Storage System (BESS) equipped with a local Edge Energy Management System (EMS) and SCADA couplings for grid congestion management at Waterschap Rijn en IJssel's wastewater treatment plants, encompassing full delivery, placement, commissioning, and ongoing maintenance. The Edge EMS must function locally and autonomously for peak shaving and charge/discharge control, remain fully operational without a permanent internet or cloud connection, and facilitate communication with process automation (ABB 800xA) via Profibus DP and energy meters/BESS via Modbus. Technical requirements specify compatibility with environments such as Windows Server 2025+, Linux Ubuntu 24.04 LTS, Microsoft SQL Server 2025+, and VMWare ESX 9.0+, alongside adherence to Microsoft security baselines and specific methodologies for application programming and distribution. The contractor's scope includes all BESS units, local control, safety features, and auxiliary systems, along with extensive documentation, while civil and electrical preparations and network cabling are explicitly excluded. Financially, tenderers must provide an auditor's…
TENDER BRIEF
The contract timeline is as follows:
Contract Start Date: The agreement is intended to start on February 2, 2027.
Total Duration: The initial duration of the agreement is three (3) years.
Contract End Date: The agreement will run until a date not explicitly specified, but it will be three years from the start date. The document uses "[datum]" as a placeholder for the end date.
Extensions: The client has the option to extend the agreement up to four (4) times, each for an additional period of one (1) year. The client must notify the contractor at least 3 months before the initial term expires if an extension option is exercised.
Key Milestones/Phases (Tender Process and Contract Initiation):
- November 4, 2026, 14:00 +01:00: Deadline for requests for additional information.
- November 18, 2026: Target date for the availability of the Memorandum of Information.
- December 9, 2026, 14:00: Closing date for submitting a bid/tender.
- December 9, 2026, 14:05 +01:00: Opening date of tenders.
- Week 50 to 52 (December 2026): Evaluation of bids.
- January 12, 2027: Expected date for the announcement of the award decision.
- January 12, 2027 to February 2, 2027: Period for asking questions and submitting objections after the award decision.
- February 2, 2027: Final award.
- February 2, 2027: Intended start date of the agreement.
- Up to March 9, 2027: The tender must remain valid for three months from the closing date for receipt of tenders (December 9, 2026).
Sources
- 1Aanbestedingsleidraad EA BESS met lokaal Edge EMS.pdf — “ook een uiterste termijn. Vragen mogen eerder worden ingediend en zullen waar mogelijk ook eerder worden beantwoord. 18 november 2026 | Streefdatum beschikbaarstelling Nota van Inlichtingen 9 december 2026, 14:00 | Sluit…”
- 2Bijlage 4A Concept overeenkomst.docx — “de overeenkomst zijn: Namens de opdrachtgever: [XXX] Namens de opdrachtnemer: [XXX] Looptijd en beëindiging van de overeenkomst Deze overeenkomst treedt in werking op [datum] en is aangegaan voor de duur van drie (3) jaa…”
- 3TN605547 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20261007172800.pdf — “en beroepskwalificaties van het voor de uitvoering van de opdracht ingezette personeel moeten worden vermeld: 84 Maand Deelname is niet voorbehouden. Niet vereist Aanbestedingsproject dat niet uit EU-fondsen wordt gefina…”
The core scope of work for this tender involves the delivery, placement, commissioning, and maintenance of a complete Battery Energy Storage System (BESS) equipped with an Edge Energy Management System (EMS) and SCADA couplings to address grid congestion.
Key responsibilities of the contractor include:
- Delivering a complete installation, encompassing BESS units, a Battery Management System (BMS), PCS/inverter(s), a local controller/Edge EMS, safety features, auxiliary systems, and a communication interface to process automation.
- Performing on-site delivery, placement, assembly guidance, commissioning, and adjustment of the BESS.
- Providing all necessary prerequisites for civil preparation, foundation, cable entry, maintenance space, weight, heat dissipation, and accessibility.
- Offering a comprehensive maintenance contract for the agreed system boundary, which covers preventive and corrective maintenance, periodic inspections, monitoring, fault analysis, and essential software/firmware updates. The supplier must guarantee the system's availability, safety, and proper functioning throughout the contract duration.
Elements explicitly *outside* the contractor's delivery scope are:
- The electrical connection to the existing installation, civil preparation, and electrical preparation, which will be handled by WRIJ/house installer.
- The delivery, installation, and connection of network cabling, including the network switch.
Core deliverables include, but are not limited to:
- System documentation such as system descriptions, datasheets, demarcation lists, layout drawings, and a delivery/implementation plan.
- Functional descriptions of local energy control and safe fallback mechanisms, along with a risk analysis for RWZI process operation.
- Detailed BESS datasheets, capacity calculations, and warranty conditions.
- Interface descriptions, data point lists, and protocol descriptions for integration with ABB 800xA.
- Logging matrices for events and monitoring, security/VPN architecture, and a comprehensive Cybersecurity Security Plan.
- Policies for hardening, malware, patching, updates, and vulnerability management.
- Procedures for backup/restore, incident management, and asset registration.
- A complete completion dossier containing as-built drawings, manuals, maintenance instructions, spare parts lists, warranty graphs, testing data, and certifications, including an EC declaration of conformity and a battery passport.
- Test and acceptance plans, protocols (e.g., FAT/SAT/SIT), and associated reports.
- A maintenance plan and a 10-year support proposal detailing scope, frequencies, rates, and SLA options.
- Regular maintenance reports and digital performance declarations for products as required.
The project is titled "BESS systeem met Edge EMS ten behoeve van netcongestie" (BESS system with Edge EMS for grid congestion). The delivery is expected within six calendar months of the order date.
Sources
- 1Bijlage 1 Programma van Eisen.pdf — “IJssel. Zie appendix 8 Opdrachtnemer levert uiterlijk binnen zes kalendermaanden na dagtekening van de schriftelijke nadere opdracht op de overeengekomen locatie. Bij toerekenbare overschrijding van deze fatale termijn i…”
- 2Aanbestedingsleidraad EA BESS met lokaal Edge EMS.pdf — “van netwerkbekabeling, inclusief de netwerk switch, blijven buiten de leveringsscope van de leverancier. Voor meer informatie hieromtrent verwijst de aanbestedende dienst u naar Appendix 5. Hierin is de demarcatie van de…”
- 3Bijlage 4A Concept overeenkomst.docx — “en is overgegaan tot definitieve gunning aan opdrachtnemer; In deze overeenkomst (hierna: de leveringsovereenkomst) de voorwaarden zijn vastgelegd die van toepassing zijn op de onderhavige opdracht. Verklaren het volgend…”
- 49. Documenten en verificaties.xlsx — “,,,,Projectfase,, Vernoemd in,Groepering,ID,Document (naam/omschrijving),Bij indiening,Voor levering,Na oplevering Leidraad,Inschrijving,UEA,"Ingevuld en rechtsgeldig ondertekend UEA, inclusief vereiste UEA’s van combina…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 27 FILES
- Bijlage 4A Concept overeenkomst.docx851 KBDOCX
- 11. Verzoek tot afgifte PV - termijn XX.pdf103 KBPDF
- RLTV-terreinlayout.pdf241 KBPDF
and 20 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.