Published

    BIM-Planung Ern. EÜ Hanekenfähr; KIB, TWP, VA+KTB; in Lingen (NDS)

    Notice number: ocds-mnwr74-d6f671e5-6a67-464f-a5b6-8195a522b540

    🇩🇪 GermanyDB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)Services

    KEY INFORMATION

    Submission deadline
    Sep 10, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)
    Accepted Languages
    DEU
    Tender type
    Services
    Contract Value
    Published date
    Aug 9, 2026

    TENDER DESCRIPTION

    This tender seeks comprehensive BIM object planning services for the renewal of the Hanekenfähr Overpass in Lingen (Lower Saxony), encompassing engineering structures and traffic facilities, including cable trenching, primarily for Deutsche Bahn. The core scope includes Basic Data Collection, Preliminary Planning, Design Planning, Execution Planning, Preparation for Award, and Assistance in Awarding Contracts, all requiring a model-based approach with mandatory BIM model coordination and documentation in German. Key technical requirements include electronic submission, invoicing, and payments, adherence to railway operational safety regulations (Ril 132.0118, Ril 132.0123), and design drawing standards (Ril 804), along with the use of planning software for 3D renderings and an iTWO project management system for cost calculations. The main services are scheduled from January 4, 2027, to December 31, 2027, with optional services extending through 2030, and financial requirements include declarations of solvency, fulfillment of legal obligations, compliance with sanction lists, and for contracts exceeding €100,000, a valid sustainability assessment.

    TENDER BRIEF

    The contract timeline includes a start date of January 4, 2027, and an end date of December 31, 2027. This results in a total duration of approximately 12 months for the main services.

    Key milestones and phases explicitly mentioned are:

    • Intermediate Milestones:
    • Submission of the final list of still required planning documents: February 5, 2027.
    • Submission of the variant review including BIM delivery: September 15, 2027.
    • Completion of the variant decision including BIM delivery: October 15, 2027.
    • Submission of the review copy of the preliminary planning booklet including BIM delivery: November 30, 2027.
    • Submission of the final preliminary planning booklet including BIM delivery: December 31, 2027.
    • Optional Services (Expected Performance Periods):
    • Leistungsphase 3 (Lph 3): up to October 31, 2028.
    • Leistungsphase 4 (Lph 4): up to June 1, 2029.
    • Leistungsphase 5+6/7 (Lph 5+6/7): starting early 2030.
    • Quality Gate (QG) Milestones:
    • QG 1 occurs at the actual start of performance.
    • QG 2 takes place during the performance, recommended at approximately half of the contract duration. For contracts exceeding one year, multiple QG 2s are to be scheduled, with the possibility of up to two additional QG 2s per year depending on the contract duration.
    • QG 3 is set for the completion of performance, following the contractually agreed acceptance of the overall service and before the final invoice is submitted.
    • All QG AN dates must be recorded as milestones within 30 calendar days after the contract award.
    • Capacity Management Phases:
    • Strategic Capacity Management: earliest 101 (n-9) to 53 (n-5) months before the timetable change, with an annual registration deadline of July 22.
    • Medium-term Capacity Management: 46 (n-4) or 34 (n-3) months before the timetable change, with an annual registration deadline of February 17.
    • Capacity Management Driving and Building (n-2): 26.5 months before the timetable change, with an annual registration deadline of September 30.
    • Capacity Management Driving and Building (n-1): 19.5 months before the timetable change, with an annual registration deadline of June 13.
    • Capacity Conflict Management (KKM): 31 weeks before construction start, with an individual registration deadline based on the construction start date.

    Sources

    • 126FEI87953_0.1_Angebotserklärung.pdf — “zu Vertrag § 3 Haftpflichtversicherung: zu Ziffer 3.2 DVA-Haftpflichtversicherung - DVA-Haftpflichtversicherung gem. Vertrag Ziffer 3.2, hier - Umsatzvertrag Nr.: 3000 2.3 Ergänzungen zu § 4Termine und Ausführungsfristen…
    • 226FEI87953_13.0_Quality Gates.pdf — “vorgegebenen, von vornherein bekannten Fragenkataloges (Checkliste). Die Durchführung einer Quality Gate Sitzung setzt ein übereinstimmendes Verständnis der beteiligten Partner für das gemeinsame Ziel voraus. Die Messmet…
    • 326FEI87953_25_BAst_1.0_EÜ_Hanekenfähr.pdf — “(n-1) 3. KP KKM 4. KP Kapazitätsmanagement 3. KoirinitationupNam Kapazitätskonflikt management 4. Konsultationsphase Betriebs und Havanweisung me d-42 vor Baubegim Strategisches Kapazitätsmanag m9 his n 5 Baubetriebliche…

    The core scope of work for this tender revolves around comprehensive BIM object planning for engineering structures and traffic facilities, including cable trenching, primarily for Deutsche Bahn. Key phases and deliverables explicitly stated include:

    • BIM Model Coordination and Documentation: All work results must be summarized, explained, and documented within a BIM model to allow for clear assessment of all essential aspects and conditions. The BIM model is to be completed as necessary.
    • Basic Data Collection (Grundlagenermittlung): This involves recording existing building substance, evaluating its suitability for the intended construction task, and integrating this data into the BIM model. It also includes procuring and evaluating official maps and data, digitally transferring them, and integrating them accurately into the BIM model.
    • Preliminary Planning (Vorplanung): The scope includes developing a planning concept with alternative solutions presented as BIM models/building data models, assessing these options, and incorporating input from other technical planning participants. This phase also entails performing rough specialist calculations, considering design aspects, and conducting preliminary quantity and cost estimations based on experience. A cost estimate is to be prepared and compared with the financial framework.
    • Design Planning (Entwurfsplanung): This phase focuses on confirming the economic viability of the project and securing financial approval for construction. It requires preparing a detailed explanatory report and conducting discipline-specific calculations, such as hydraulic calculations for channels and pipelines, and stability proofs for earthworks. Furthermore, cost calculations, including associated quantity determinations, are to be prepared using the iTWO project management system, comparing them with initial cost estimates and adhering to DB AG guidelines.
    • Execution Planning (Ausführungsplanung): This involves the ongoing, model-based determination of construction costs and Life Cycle Costs (LCC).
    • Preparation for Award (Vorbereiten der Vergabe): Quantities for the planned construction services must be determined, assigned to specific facilities/service areas, and broken down into individual items to form the basis for the bill of quantities.
    • Assistance in Awarding Contracts (Mitwirken bei der Vergabe): This phase includes preparing tender documents, which comprise the BIM model, specifications with bills of quantities, and special contract conditions, all in accordance with DB AG guidelines. It also covers compiling services from various participating parties, conducting bidder discussions, formulating award proposals, documenting the award procedure, assembling contract documents, comparing tender results with the planner-priced bills of quantities and cost calculations, and assisting in the final contract award process.

    Sources

    • 126FEI87953_01.1_BIM_Objektplanung_Ingenieurbauwerke_(in_Verbindung_mit_TWP).pdf — “identifizierten Planungsdaten, Randbedingungen, verifizierte Ziele und Festlegungen sind festzuhalten. Zusammenfassen Erläutern und Dokumentieren aller Arbeitsergebnisse koordiniert in einem BIM-Modell, so dass eine zwei…
    • 226FEI87953_01.3_BIM_Objektplanung_Verkehrsanlagen_inkl._Kabeltiefbau.pdf — “X | | | Im Falle eines Raumordnungsverfahrens sind die erforderlichen Antragsunterlagen mit der zuständigen Landesplanungsbehörde und dem EBA weitestgehend modellbasiert abzustimmen und in der in § 14 Nr. 3 des Vertrags…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 65 FILES

    • 26FEI87953_01.3_BIM_Objektplanung_Verkehrsanlagen_inkl._Kabeltiefbau.pdf
    • 26FEI87953_06.1_Begründung_Honoraranpassung.pdf
    • 1337031639-V02.pdf

    and 58 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders