    TENDER DESCRIPTION

    This tender seeks comprehensive planning, coordination, and documentation services for specialist trades in engineering structures and transport facilities, with a strong emphasis on Building Information Modeling (BIM). The scope of work includes overall project coordination, BIM-based planning and model integration, foundational analysis, regulatory compliance, risk management in accordance with the CSM-Regulation, and developing project documentation specifications. Bidders must demonstrate the use of state-of-the-art BIM and CAD software, hardware, and provide a minimum of two BIM-specific workstations. Financially, applicants are required to have a minimum annual total turnover of €3 million, including at least €3 million per year for comparable services. The contract is set to commence on January 25, 2027, and conclude by December 31, 2028, with key milestones including the submission of the preliminary planning booklet by March 30, 2028, and multiple quality gates throughout the approximate 1 year and 11 months duration.

    TENDER BRIEF

    The contract timeline is as follows:

    The contract start date is January 25, 2027.

    The contract end date is December 31, 2028.

    The total duration of the contract is approximately 1 year and 11 months.

    Key milestones and phases include:

    • Completion and submission of the preliminary planning booklet by March 30, 2028.
    • Quality Gate (QG) 1 takes place at the actual start of services.
    • Quality Gate (QG) 2 occurs during service delivery, with a recommendation for it to be at approximately half of the contract duration. For contracts lasting longer than one year, multiple QG 2s are to be scheduled.
    • For optional services, the corresponding dates and deadlines will be agreed upon when these services are transferred.

    Sources

    • 10.1_Angebotserklärung_Planung_Krefelder Brücken.pdf — “unverzüglich nach Auftragserteilung bzw. am: 25.01.2027 Ende der Leistungen am: 31.12.2028 Zwischentermine: Abschluss und Vorlage des Vorplanungsheftes 30.03.2028 Zur Übertragung vorgesehene Leistungen (optionale Leistun…
    • 213.0_Quality Gates.pdf — “QG-Sitzung auf Basis eines vorgegebenen, von vornherein bekannten Fragenkataloges (Checkliste). Die Durchführung einer Quality Gate Sitzung setzt ein übereinstimmendes Verständnis der beteiligten Partner für das gemeinsa…

    The core scope of work for this tender involves comprehensive planning, coordination, and documentation services, heavily leveraging Building Information Modeling (BIM). Key activities include:

    • Overall Coordination: Ensuring overarching technical and organizational coordination of all project participants, trades, and required expert opinions. This encompasses coordinating specialist planners, integrating and tracking expert assessments, organizing and conducting coordination meetings, consolidating and validating specialist plans, identifying and resolving interfaces and conflicts, ensuring adherence to schedules, and documenting essential agreements and decisions. The contractor will act as a central coordination point between the client, specialist planners, experts, and other involved parties.
    • BIM-based Planning and Documentation: Summarizing, explaining, and documenting all work results within a coordinated BIM model to enable clear assessment of project aspects and boundary conditions, and completing the BIM model as necessary. This also involves integrating existing BIM models, data, and client specifications into the new BIM model. The planning concept will be developed in the BIM model, and designs will be elaborated based on pre-planning, providing work results for other involved parties and integrating specialist plans. The fundamentals are to be presented and defended to the client in regular model-based BIM project meetings.
    • Foundational Analysis and Planning: Verifying available initial data through on-site inspection, acquiring and evaluating official maps and data for digital integration into the BIM model, and conducting qualitative and quantitative analysis of planning fundamentals. The contractor is responsible for developing planning concepts, including rough designs of systems, investigating alternative solutions with model-based representations, and conducting preliminary economic assessments. This also includes recording existing building fabric and assessing its suitability.
    • Regulatory Compliance: Preparing and compiling all necessary documents for public-law and approval procedures, including applications for exceptions and exemptions, and creating a building directory using contributions from other planning specialists.
    • Risk Management: Implementing risk management procedures in accordance with the CSM-Regulation, which includes creating a preliminary system definition, participating in safety and significance testing, and assisting in executing the safety method as per Ril 125.0100.
    • Project Documentation: Creating specifications for the project documentation to be provided by the construction contractor.

    Sources

    • 11.2_BIM_Objektplanung_Ing.Bauwerke_Los 1.pdf — “zwischen den Beteiligten sowie die terminliche und inhaltliche Koordination der jeweiligen Leistungen. Vergabenummer: 26FEI86827 Fachautoren: FE.EI 5 I Roswitha Ott-Urban I [email protected] Ergänzungen…
    • 21.3_BIM_Objektplanung_Verkehrsanlagen_Los 1.pdf — “hat der AN durch Inaugenscheinnahme auch zu prüfen, ob die verfügbaren Ausgangsdaten (Bestandsunterlagen etc.) mit der Örtlichkeit übereinstimmen und vollständig sind. Bei Abweichungen bzw. Unvollständigkeit ist der AG z…
    • 31.5_BIM_FP_Technische_Streckenausrüstung_WHZ_Los 3.pdf — “zu Kontierung und Finanzierung werden am BIM-Modell durchgeführt. 2.19 Risikomanagementverfahren nach CSM-Verordnung x - ☑ Erstellen der vorläufigen Systemdefinition - ☑ Mitwirken bei der Sicherheits-/Signifikanzprüfung…
    • 41.4_BIM_FP_Technische_Streckenausrüstung_OLA_LST_Los 2.pdf — “und Dokumentieren aller Zwischen- und Arbeitsergebnisse koordiniert in einem BIM-Modell und erforderlichenfalls ergänzend in einem Bericht, so dass eine zweifelsfreie Beurteilung aller wesentlichen Gesichtspunkte und Ran…
    • 51.6_BIM_Technische_Ausrüstung_50 Hz_Los 3.pdf — “gewünschte Funktionalität und die Rahmenbedingungen der Leistungserbringung zu beschreiben. Verweise bzw. Bezüge auf anzuwendende Richtlinien und zu erbringende (Qualitäts-) Standards sind entsprechend technischem Raumbu…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 47 FILES

    • 18.3_Auftraggeberinformationsanforderung (AIA)_Los 3.pdf
    • 13.0_Quality Gates.pdf
    • Unterlagen\Weitere Dokumente\00.4_26FEI86827_Los 1_Zuschlagskriterien.pdf

    and 40 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders