BIM Planungsleistungen Biberach (Süd) Neubau PÜ + Aufzüge
Notice number: 00574219-2026
KEY INFORMATION
- Submission deadline
- • Sep 18, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- DB InfraGO AG – Geschäftsbereich Personenbahnhöfe (Bukr 11)
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 19, 2026
TENDER DESCRIPTION
This tender seeks comprehensive BIM planning services for the new construction of a pedestrian overpass and associated lift installations at the Biberach Süd transport station, ensuring barrier-free access. The scope of work encompasses building object planning, engineering structures, and technical equipment, including meticulous project documentation, BIM model development and management, planning concept alternatives, foundational analyses, and full approval planning. Key technical requirements mandate the use of BIM methodology, the iTWO project management system for cost and service catalog assignments, and a Project Communication Platform, alongside strict adherence to IT security protocols including WPA2 encryption, regular security updates, and secure device handling. The contract is projected to run from January 4, 2027, to November 9, 2029, with critical milestones such as preliminary and draft booklet completions, and requires a declaration of no pending insolvency or liquidation proceedings.
TENDER BRIEF
The contract timeline is as follows:
- Contract Start Date: 04.01.2027
- Contract End Date: 09.11.2029
- Total Duration: 2 years, 10 months, and 5 days.
- Key Milestones/Phases:
- Completion of preliminary planning booklet (Fertigstellung Vorplanungsheft): 24.06.2027
- Completion of draft booklet (Fertigstellung Entwurfsheft): 03.02.2028
- Completion EP/GP (Abschluss EP/GP): 09.11.2029
- Quality Gate 1 (QG 1): Occurs at the start of services, involving order acceptance and verification of basic requirements.
- Quality Gate 2 (QG 2): Takes place during service delivery to synchronize progress and control performance. It is recommended at the halfway point of the contract duration, with multiple QG 2s possible for contracts exceeding one year.
- Quality Gate 3 (QG 3): Occurs at the completion of services, verifying that contractually owed services are fulfilled, after overall service acceptance and before the final invoice.
Sources
- 10.1_Angebotserklärung.pdf — “sie ihm vom AG spätestens innerhalb von 12 Wochen nach Abnahme der jeweils zuvor beauftragten Leistungsstufe übertragen werden. Einen Anspruch auf Übertragung dieser Leistung hat er nicht, und zwar auch dann nicht, wenn…”
- 2Nachrichten\0.1_Angebotserklärung_V1.pdf — “wenn sie ihm vom AG spätestens innerhalb von 12 Wochen nach Abnahme der jeweils zuvor beauftragten Leistungsstufe übertragen werden. Einen Anspruch auf Übertragung dieser Leistung hat er nicht, und zwar auch dann nicht,…”
- 313.0_Quality Gates.pdf — “Feststellungen aller Teilnehmer einer QG-Sitzung auf Basis eines vorgegebenen, von vornherein bekannten Fragenkataloges (Checkliste). Die Durchführung einer Quality Gate Sitzung setzt ein übereinstimmendes Verständnis de…”
The core scope of work for this tender primarily involves BIM (Building Information Modeling) services for building object planning, engineering structures (including elevators), and technical equipment (including grounding and lightning protection).
The Statement of Work summary and core deliverables include:
- Project Documentation: Creating specifications for project documentation, ensuring completeness and updates based on legal and technical standards, and coordinating these with the client's project management.
- BIM Model Development and Management: This involves summarizing, explaining, and documenting all project results within a coordinated BIM model to enable clear evaluation. The contractor is responsible for completing the BIM model, assigning and coordinating cost and financing structures within it, and conducting model-based cost and life cycle cost (LCC) estimations. Model-based construction schedule planning is also a key deliverable.
- Planning Concept and Alternatives: Developing a planning concept that includes alternative solutions (specifically three variants) using BIM models and evaluating these options, integrating contributions from other specialized planners. This also involves working through the planning concept within the BIM model to achieve a complete design.
- Foundational and Preliminary Work: Tasks include analyzing project fundamentals, coordinating services with all planning stakeholders, and recording and evaluating existing building structures for integration into the BIM model. Simplified inventory recording and digital transfer of updated documents are also part of this phase. The contractor is expected to advise on the overall project requirements, define the scope, and establish planning and process organization.
- Approval Planning: Preparing and compiling all necessary documents and evidence for public-law approval and permitting procedures, including applications for exceptions and exemptions. This involves deriving and preparing these documents from the BIM model in accordance with relevant regulations, such as §18 AEG or regional building codes, and participating in negotiations with authorities.
- Coordination: Coordinating the assignments and contributions of various specialist planners involved in the project.
Sources
- 11.5_Leistungsbild_BIM_Objektplanung_Gebäude.pdf — “X Erstellung der Vorgabe, der für das Projekt vom AN Bau vorzulegende Projektdokumentation 6.9 | X | | Der AN erstellt auf Grundlage der jeweils aktuellen Ablagestruktur Personenbahnhöfe die Vorgabe der für das Projekt v…”
- 21.1_Leistungsbild_BIM_Objektplanung_Ingenieurbauwerke_Aufzüge.pdf — “Verknüpfung mit den Kosten aus der Kostenschätzung auf Objektebene. | | | | Vergabenummer: 26FEI87515 Fachautoren: FE.EI 5 I Roswitha Ott-Urban I [email protected] Ergänzungen BIM: I.IIG 12 1 Anne Schac…”
- 31.7_Leistungsbild_BIM_Technische_Ausrüstung_inkl._Erdung_und_Blitzschutz.pdf — “wesentlichen Vorgängen des Bauablaufs 2.13 | X | | Erstellen einer modellbasierten Bauablaufplanung gemäß Terminplan unter Berücksichtigung der verbindlichen (Muster-) | | | Vergabenummer: 26FEI87515 Fachautoren: FE.EI 5…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 47 FILES
- 7.0_Merkblatt Bauleistungs-_Haftpflichtversicherung.pdf200 KBPDF
- 0.0_Vertragstext.pdf87 KBPDF
- Unterlagen\Weitere Dokumente\26FEI87515_Anschreiben Arch.-Ing.pdf86 KBPDF
and 40 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.