Published
BLB NRW BB / G-CAP / Rahmenvertrag Projektmangement u. Objektüberwachung
Notice number: 00577262-2026
KEY INFORMATION
- Submission deadline
- • Sep 18, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Bau- und Liegenschaftbetrieb NRW Bundesbau
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 20, 2026
TENDER DESCRIPTION
This framework contract, BLB NRW BB / G-CAP, seeks comprehensive project management and site supervision services for the German Armed Forces Infrastructure Programme in NRW. The core scope of work involves delivering essential interim infrastructure, including water supply, wastewater disposal, off-grid power, and heat supply, alongside site preparation and the construction of detailed outdoor facilities. Contractors must adhere to stringent technical specifications, utilizing BIM-Methode, SAP Project and Resource Management (SPRM), Cloud for Project Bundeswehr (C4P Bw), and various data formats and platforms while complying with specific Bundeswehr directives. Financial requirements include professional/business liability insurance with minimum coverage of €3 million for personal injury and €5 million for other damages per claim, with the maximum annual compensation at least double the sum insured. The framework agreement implies a four-year duration, necessitating the capacity to initiate new call-offs every 30 calendar days, with defined phase durations of 30-60 calendar days for planning and 210 calendar days for execution, ensuring continuous supply for interim solutions…
TENDER BRIEF
The contract timeline consists of distinct phases and durations for individual call-offs, with an overarching annual load planning.
Key Milestones/Phases and Durations for individual call-offs:
- Phase 1 (Genehmigungsplanung/Entwurfs- und Genehmigungsplanung):
- For the first call-off: 60 calendar days (KT) for basis planning (alternatively broken down as 30 KT + 15 KT + 30 KT for general planning).
- For subsequent call-offs: 30 KT for planning.
- Fiktives Kenntnisgabeverfahren (Fictional Notification Procedure): 30 KT or 4 weeks.
- Phase 2 (APL, Bau, IBN / Ausführungsplanung und Bauleistung): 210 KT, which is equivalent to 30 weeks or 7 months.
- Call-off rhythm: The contractor must be able to initiate a new call-off every 30 calendar days until the annual load is met.
Total Duration/Annual Load:
- The annual load for specific lots (e.g., Los 3, 5, 7) is calculated based on 4 years, implying a framework agreement period of 4 years. For example, for ALHO, this means 13 buildings per year over 4 years. For PORR Rheinmetall, the annual load is approximately 23 buildings based on the first three lots.
Contract Start Date and End Date:
- Explicit contract start and end dates are not stated.
- A binding period (Bindefrist) for the offer is mentioned as 31.07.2026, which is not the contract start date.
Sources
- 120260522 G-CAP Konzept Termine ALHO.pdf — “Phase1 (60, $30+15$ danach 30 Kalendertage) + Phase2 (210 Kalendertage) Bindefrist: $31.07.2026\div30$ Tage bis 1. Abruf Angeboten werden: Los 3, 5, 6, 7. Phase1, Gen.-Plan(30 KT) Fikt. Kenntisgabeverfv.(30 KT) Phase2, A…”
- 220260526 G-CAP Konzept Termine PORR.pdf — “100-25-00102 Vergabeverfahren G-CAP Inland Konzeptvorlage Unterkriterium 1 „Terminplanung inkl. qualifiziertem Bauzeitenplan" Qualifizierter Bauzeitenplan Planung: Abruf Basisplanung 60KT, Folgeabrufe 30 KT Fiktives Kenn…”
- 320260522 G-CAP Anlage zum Konzept Termine ALHO.pdf — “| Zusätzliche Planungszeit (30 Kalendertage) Genehmigungs planung (10 KT) | Bauzeit (210 verfahren 4 Wochen | Kalendertage) = 30 Wochen Verbindliche/ schriftliche Auftragserteilung | | | | Phase 1 (Erstabruf) Entwurfs- u…”
- 420260526 G-CAP Anlage zum Konzept Termine PORR.pdf — “Ausbau 1 GWZ Projektstart Baustart 1. Abruf TYP1 2626 Sametter pde integrale Planung Cost & Engineering Banorbereitung Getakteter Meilenstein- & Phasenplan - GCAP Erstellt am 08.05.2020 in Deutichland Projektstart ZAY Va…”
The core scope of work and statement of work summary for this tender involve several key modules (Bausteine):
- Interim Water Supply and Wastewater Disposal: The contractor is responsible for providing a temporary water supply and wastewater disposal system for the accommodation and functional building. This includes planning, obtaining permits, delivery, setup, connection, functional testing, and full-service operation (including potable water supply, wastewater disposal, tank truck services, maintenance, hygiene monitoring, 24/7 readiness with a maximum 6-hour reaction time, and documentation). The interim solution must ensure continuous supply for up to two years with an option for extension and is to be dismantled upon connection to a permanent network.
- Interim Power Supply: This involves establishing and operating a temporary, off-grid power supply for general electricity requirements (such as lighting, IT/network, socket loads, and basic building services, excluding heat generation and large kitchens). The contractor's responsibilities include planning, delivery, erection of N+1 redundant mobile grid replacement systems, securing permits, preparing setup areas, installing feeder/distribution cabinets, cables/bridges, implementing protection/selectivity concepts, automatic start/ATS, exhaust systems, double-walled tanks with monitoring, sound insulation, commissioning (including functional and load tests), documentation, and full-service 24/7 operation/monitoring, fuel logistics, routine/interval maintenance, emergency service (reaction time <= 6h), operating materials/spare parts, safety and recurring inspections, emission and sound compliance, logbook/documentation, load management and peak load monitoring, and periodic load tests. Complete dismantling is required after the permanent grid connection is established.
- Interim Heat Supply: The contractor is to provide a temporary heat supply for the accommodation and functional building, including domestic hot water. This entails planning, permits, delivery, setup, connection, functional testing, full-service 24/7 operation/monitoring, and ultimately the dismantling of all systems and lines, disposal of residual materials, and restoration of surfaces.
- Site Preparation (Baufeldherrichtung): This component includes technical processing, encompassing planning, documentation, assessment of site-specific conditions, creation of layout and elevation plans, development of soil and drainage concepts, and preparation of all necessary technical documents to create a ready-to-build site. The physical construction involves soil investigations and the clearing of the site, including the removal of vegetation, shrubs, trees (with rootstocks > 50mm), and other obstacles.
- Construction of Outdoor Facilities (Herstellung "Außenanlagen"): This includes detailed technical planning for area division, terrain modeling, path construction, drainage, vegetation areas, lighting, and other functional and technical aspects. Documentation of planning, technical proofs, survey data, material/plant lists, drainage/topsoil proofs, and any required permits is also a deliverable. Specific elements to be constructed are rainwater infiltration basins and trenches, car/truck parking spaces, functional lighting for various areas, a flagpole, lawn areas, shrubs, an outbuilding for bicycle storage, an outbuilding for waste container roofing, and a fire water tank. It also includes the installation of connection lines for drinking water, heating, electricity, and IT/data if their length exceeds 50 meters.
The operation and dismantling of the general outdoor facilities are explicitly stated as not being part of this tender.
Sources
- 120260519 G-CAP Funktionale Leistungsbeschreibung TU Rahmenvertrag.pdf — “Einfassung der Pflanzfläche). Menge 100 Stück 3.2.19. Nebengebäude 1 - Fahrradunterstand Herstellung im Vorbereich des Gebäudes als freistehendes Nebengebäude; dauerhaft befestigt, robust, witterungsbeständig und barrier…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 80 FILES
- Hinweis auf Bekanntmachungsorte.pdf38 KBPDF
- 080-26-00600 G-CAP Anlage 3b zum Vertrag Leistungsbeschreibung Projektleitung.pdf211 KBPDF
- BLB NRW Hinweise zu Interessenkonflikten.pdf78 KBPDF
and 73 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.