    BLB NRW BB / G-CAP / Rahmenvertrag Projektmangement u. Objektüberwachung

    Notice number: ocds-mnwr74-16a9baaa-75e8-47db-9a04-b9aa60fdcf3f

    🇩🇪 GermanyBau- und Liegenschaftbetrieb NRW BundesbauServices

    KEY INFORMATION

    Submission deadline
    Sep 18, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Bau- und Liegenschaftbetrieb NRW Bundesbau
    Accepted Languages
    DEU
    Tender type
    Services
    Contract Value
    Published date
    Aug 20, 2026

    TENDER DESCRIPTION

    This framework contract seeks up to two contractors to provide comprehensive project management and site supervision services for the Bundeswehr Infrastructure Programme G-CAP in NRW, focusing on interim infrastructure solutions and site preparation for accommodation and functional buildings (UKuFG units). The scope includes technical planning, ground investigations, establishment and 24/7 operation of temporary water, wastewater, power, and heat supply systems, installation of all necessary connection lines, and construction of outdoor facilities such as parking, lighting, and rainwater management. Technical requirements mandate the use of CAD, BIM methodology with specific platforms like SAP Project and Resource Management (SPRM) and Cloud for Project Bundeswehr (C4P Bw) for common data environments, and adherence to various Bundeswehr regulations and DIN standards for IT, security, and lighting. Individual call-offs involve planning phases of 30-60 calendar days, a 30-day notification procedure for the first call-off, and 210 calendar days for execution and commissioning, with new call-offs required every 30 calendar days within an implied 4-year framework. Bidders must hold…

    TENDER BRIEF

    The contract timeline includes the following phases and durations for individual call-offs:

    • Bidding period (Bindefrist): Up to 30 days after July 31, 2026, until the first call-off.
    • First Call-off (Erstabruf):
    • Phase 1 (Entwurfs- und Genehmigungsplanung): 60 calendar days (KT) for basis planning.
    • Fictional Notification Procedure (Kenntnisgabeverfahren): 30 calendar days or 4 weeks.
    • Phase 2 (Ausführungsplanung und Bauleistung, IBN): 210 calendar days for execution, construction, and commissioning.
    • Subsequent Call-offs (Folgeabrufe):
    • Phase 1 (Entwurfs- und Genehmigungsplanung): 30 calendar days for planning.
    • Phase 2 (Ausführungsplanung und Bauleistung, IBN): 210 calendar days for execution, construction, and commissioning.
    • Call-off frequency: The contractor must be able to start a new call-off every 30 calendar days until the annual load is reached.

    The documents refer to a 4-year period for calculating the annual load for some lots, implying a framework duration, but a specific overall contract start date, end date, or total duration for the entire contract is not explicitly stated.

    Sources

    • 120260522 G-CAP Konzept Termine ALHO.pdf — “Phase1 (60, $30+15$ danach 30 Kalendertage) + Phase2 (210 Kalendertage) Bindefrist: $31.07.2026+30$ Tage bis 1. Abruf Angeboten werden: Los 3, 5, 6, 7. Phase1, Gen.-Plan(30 KT) Fikt. Kenntisgabeverfv.(30 KT) Phase2, APL,…
    • 220260526 G-CAP Konzept Termine PORR.pdf — “100-25-00102 Vergabeverfahren G-CAP Inland Konzeptvorlage Unterkriterium 1 „Terminplanung inkl. qualifiziertem Bauzeitenplan" Qualifizierter Bauzeitenplan Planung: Abruf Basisplanung 60KT, Folgeabrufe 30 KT Fiktives Kenn…
    • 320260526 G-CAP Anlage zum Konzept Termine PORR.pdf — “Ausbau 1 GWZ Projektstart Baustart 1. Abruf TYP1 2626 Sametter pde integrale Planung Cost & Engineering Banorbereitung Getakteter Meilenstein- & Phasenplan - GCAP Erstellt am 08.05.2020 in Deutichland Projektstart ZAY Va…
    • 420260522 G-CAP Anlage zum Konzept Termine ALHO.pdf — “| Zusätzliche Planungszeit (30 Kalendertage) Genehmigungs planung (10 KT) | Kenntnisgabe verfahren 4 Wochen | | Bauzeit (210 Kalendertage) = 30 Wochen | | Verbindliche/ schriftliche Auftragserteilung | | | | | | Phase 1…

    The core scope of work for this tender involves providing comprehensive interim infrastructure solutions and site preparation for accommodation and functional buildings (UKuFG units).

    The Statement of Work summary and core deliverables include:

    • Site Preparation: Technical planning and documentation, ground investigations, clearing of vegetation and obstacles, and preparing a buildable site.
    • Interim Water Supply and Wastewater Disposal: Establishment, full-service 24/7 operation (including maintenance, hygiene monitoring, tank filling/emptying, and 6-hour reaction time for emergencies), and dismantling of temporary, independent water supply and wastewater disposal systems for UKuFG units.
    • Interim Power Supply: Provision, full-service 24/7 operation (including monitoring, fuel logistics, maintenance, emergency service with ≤ 6-hour reaction time, load management, and periodic load tests), and dismantling of temporary, grid-independent power supply for general electricity needs (lighting, IT/network, sockets, basic building services).
    • Interim Heat Supply: Establishment, full-service 24/7 operation (including monitoring), and dismantling of temporary heat supply systems, including domestic hot water, for UKuFG buildings.
    • Connection Lines: Installation of connection lines for water, wastewater, heat, electricity, and IT/data, including earthworks, protective pipes, shafts, house entries, testing, and documentation.
    • Outdoor Facilities: Construction of rainwater management systems (swales, rigoles), PKW/LKW parking spaces, lighting, flagpoles, lawns, shrubs, bicycle shelters, waste container coverings, and a fire water tank of 192 m³.
    • Project Management Services: Project management and construction supervision services, covering analysis, evaluation, preparation, recommendation, updating, participation, checking, steering, and reviewing project processes.

    Sources

    • 120260519 G-CAP Funktionale Leistungsbeschreibung TU Rahmenvertrag.pdf — “und Abwasserentsorgungsnetz der Liegenschaft her. Der AN führt alle hierfür erforderlichen Umschlussarbeiten, Anpassungen und Nebenleistungen aus. 4.1.1.,,Interim Wasserver- und Abwasserentsorgung UKuFG 240 (+60)" Betrie…
    • 2080-26-00600 G-CAP Anlage 3a zum Vertrag Leistungsbeschreibung Projektsteuerung.pdf — “Projektbezeichnung: G-CAP Inland Stufe 1 Vergabenummer: 080-26-00600 Anlage 3: Leistungsbeschreibung für Leistungen des Projektmanagements & der Objektüberwachung, Teil a: Leistungen der Projektsteuerung BLB NRW-Bundesba…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 80 FILES

    • 14 Anh - EEB Beispiel.pdf
    • 03 Anh - Raumtypenprogramm hervorgehobene Änderungen in rot blau grün dunkelrot.xls
    • 080-26-00600 G-CAP Anlage 3b zum Vertrag Leistungsbeschreibung Projektleitung.pdf

    and 73 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders