    BONNIERES-SUR-SEINE - Collège Marcel Pagnol - Marché de conception - réalisation pour la rénovation et l'extension du collège

    Notice number: 00510618-2026

    🇫🇷 FranceConseil Départemental des YvelinesWorks

    KEY INFORMATION

    Submission deadline
    Sep 18, 2026
    Location
    🇫🇷 France
    Contracting authority
    Conseil Départemental des Yvelines
    Accepted Languages
    French
    Tender type
    Works
    Contract Value
    Published date
    Jul 23, 2026

    TENDER DESCRIPTION

    This Design and Build contract is for the comprehensive renovation and extension of the Marcel Pagnol College in Bonnières-sur-Seine, aiming to increase its capacity to 950 places. The scope encompasses detailed design (APD, PRO studies, administrative authorizations) and execution phases, including preliminary works, asbestos removal, and extensive rehabilitation, all while ensuring compliance with RE2020 for new structures and 2040 Décret Tertiaire objectives for the entire project. Key technical requirements include the use of BIM models and specific software (e.g., AutoCAD 2022, Microsoft Office 365), off-site construction methodologies, specific acoustic treatments for music rooms, and the maintenance of existing CVC, SSI, and electrical systems during works, with a strict prohibition on most modular buildings. The project is budgeted at €17,500,000 excluding VAT, with financial standing requirements for bidding groups including a cumulative average annual turnover of at least €20,000,000 excluding VAT over the last three financial years. The contract's provisional duration for works is a maximum of five years, commencing after a notification expected by the end of 2027,…

    TENDER BRIEF

    The contract timeline indicates that the market is expected to take effect upon its notification, with a provisional date set for the fourth quarter of 2027. The total provisional duration of the works is a maximum of 5 years. The contract will conclude after the second year of the perfect completion guarantee, or any extended period of this guarantee. The perfect completion guarantee itself lasts for two years, commencing from the reception of the final phase of works, excluding demolition and external landscaping.

    Key milestones and phases include:

    • Provisional Calendar (not contractually binding):
    • Call for applications: July 2026.
    • Submission of applications: September 18, 2026.
    • DCE offers submitted to 3 bidders: end of November 2026.
    • Receipt of initial offers: March 2027.
    • Negotiations: May 2027.
    • Final offer dossier: June 2027.
    • Submission of final offers: September 2027.
    • Notification: end of 2027.
    • Design phase: 2028.
    • Execution phase: 2029 to 2033.
    • Contractual Phases:
    • The Conception-Realization (Design-Execution) phase will extend from the market notification until the reception of the last phase of works.
    • The perfect completion guarantee phase follows the reception of works for a duration of two years.
    • Deadlines for Study Production (Design Phase):
    • Preliminary Design Document (APD): 11 weeks from the Service Order for the start of the Conception phase.
    • Administrative Authorizations: 4 weeks from the submission of the APD.
    • Project Document (PRO): 12 weeks from the validation of the APD.
    • Partial Works Execution File (DOE): 2 weeks for each partial reception.
    • Final Works Execution File (DOE): 4 weeks at the reception of all works.
    • Explicitly mentioned Milestones ("Jalons"):
    • Validation of the Preliminary Design Document (APD).

    Sources

    • 1AWS-MPI-1853187-RC-V2.pdf — “répertoriée dans les diagnostics remis au dossier de consultation. La part à prix unitaire ne comprend pas de montant minimum mais un montant maximum de 200 000.00 € HT sur la durée totale du marché. Tout dépassement de…
    • 2CCAP.pdf — “tard. Cet engagement aura fait l’objet de l’établissement d’un planning détaillé, planning dans lequel le titulaire s’engagera sur des délais d’études compatibles et qui ne pourront être supérieurs aux délais maximums pr…
    • 31.5 CCTP_20260565.pdf — “et devra être arrêté au plus tard au 3ème mois après démarrage des travaux. Le Rapport d’Avancement sera utilisé comme support du Comité de Suivi du projet. 2.3.3. Jalons Dans l’objectif de contrôler tout au long du déro…

    The core scope of work for this tender involves a "Conception-Réalisation" (Design-Build) project, likely for the Collège Marcel Pagnol, encompassing both design and execution phases.

    Statement of Work Summary and Core Deliverables:

    During the Design Phase (Conception):

    • Development of the Detailed Preliminary Design (APD), including studies for preliminary works.
    • Obtaining the building permit and all necessary administrative authorizations.
    • Conducting Project Studies (PRO).
    • Updating written and technical documents based on observations from the APD phase.
    • Ensuring the coherence of project elements and services with the overall market economy and verifying compliance with fundamental program objectives, particularly regarding performance and schedule.
    • Producing detailed architectural graphic documents, including plans, sections, elevations, 3D elements, and descriptions of materials and their implementation conditions.
    • Preparation of an environmental and performance dossier, which includes a regulatory thermal study, dynamic thermal simulation, justification of RE2020 compliance, achievement of tertiary decree objectives, and various environmental notices (energy performance, thermal comfort, biosourced materials, visual comfort).
    • Developing the preliminary works execution file, covering asbestos removal, non-structural deconstruction (including on-site and off-site reuse), and necessary evacuation for rehabilitation.
    • A detailed mock-up for the APD phase.

    During the Execution Phase (Réalisation):

    • Carrying out execution studies and synthesis.
    • Monitoring the execution of works.
    • Conducting reception operations alongside the contracting authority.
    • Monitoring the perfect completion guarantee period.
    • Updating the detailed calendar of studies and works, highlighting critical path milestones.
    • Updating the site organization notice and the site installation plan (PIC) for each phase of the project, detailing aspects like site access, waste sorting zones, and lifting equipment.
    • Implementing a quality control scheme, including proposed control milestones during works and a list of planned tests at each milestone and upon completion.
    • Presenting a list of materials, finishes, samples, and prototypes, particularly for mock-up rooms, with presentation dates to relevant stakeholders.
    • Specific requirements for moves between zones to occur only during school holidays, excluding Christmas holidays.

    Overall Objectives and Deliverables:

    • Ensuring that the project's environmental and energy objectives, including RE2020 and the tertiary decree, are precisely detailed and met throughout the project.
    • Determining the implantation and footprint of all structural elements and technical equipment, and specifying fluid supply and evacuation routes.
    • Providing the client with elements to estimate the operational costs of the structure.
    • Establishing a synthesis dossier including tracking tables for observations and a summary note of integrated project evolutions accepted by the contracting authority.
    • Maintaining a list of questions and answers (FQR) for communication with the contracting authority.

    Sources

    • 1CCAP.pdf — “au marché (dont le programme) et aux engagements pris par le titulaire dans son offre (si ces engagements s’avéraient supérieurs aux attendus du programme), sauf si celle-ci résulte d’une modification explicite expressém…
    • 21.5 CCTP_20260565.pdf — “les formes des différents éléments de la construction, la nature et les caractéristiques des matériaux et les conditions de leur mise en œuvre  Déterminer l'implantation et l'encombrement de tous les éléments de structu…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 20 FILES

    • AWS-Achat_depot-sans-signature.pdf
    • DC2.doc
    • CCAP.pdf

    and 13 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders