Published
Concours restreint de Maîtrise d’œuvre sur « esquisse + » pour la reconstruction du collège Paul Langevin et la déconstruction de l’ancien collège à Sainte Savine
Notice number: 00511024-2026
KEY INFORMATION
- Submission deadline
- • Sep 15, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Département de l'Aube
- Accepted Languages
- French
- Tender type
- Services
- Contract Value
- Published date
- Jul 23, 2026
TENDER DESCRIPTION
This restricted design competition seeks a comprehensive design for the reconstruction of Paul Langevin middle school and the demolition of the existing facility in Sainte Savine. The scope includes a base mission encompassing Esquisse +, preliminary and detailed preliminary design, project studies (including building permit submission by end of 2027), assistance for works contract awarding, compliance review, execution and synthesis studies, overall lot synthesis, direction of works, and assistance through the perfect completion guarantee period. Complementary missions cover Fire Safety System Coordination, creation of communication materials, and definition of furniture and equipment with ergonomic studies. Technical requirements mandate challenging environmental targets, such as Bbio max, Cep max, and Cepnr max all at -10%, respect of the Ic construction 2025 threshold, minimal energy autoproduction of 15 kWhef/m², and the ability to operate within an occupied environment while maintaining full college service (except staff housing) throughout the 61-month construction period. The project timeline involves candidate selection by October 2026, laureate choice by March 2027,…
TENDER BRIEF
The contract timeline is as follows:
Competition Phases:
- Phase 1: Selection of Candidates
- Launch of call for applications: July 2026
- Receipt of applications: September 2026
- Designation of admitted candidates: October 2026
- Phase 2: Selection of the Laureate
- Receipt of projects from admitted candidates: January 2027
- Choice of the laureate: March 2027
Operation Provisional Calendar:
- Award of the prime contract (maîtrise d'œuvre): Spring 2027
- Provisional duration of the prime contract mission in study phase (excluding construction period): Approximately 12 months from notification in 2027 to mid-2028.
- Works: Starting from 2028.
- Provisional duration of works: 61 months.
Key Milestones:
- Deposit of the building permit: Before December 31, 2027.
- Provisional works (VRD, modular, playgrounds, etc.): Before the start of the school year in September 2028.
Sources
- 11_2026_02_069_Reglement concours 1ere phase.pdf — “règlement. 4.2. Calendrier prévisionnel du concours Le calendrier prévisionnel du concours est le suivant, sous réserve de modification: 1ère phase > : Juillet 2026 | Septembre 2026 | Octobre 2026 Lancement de l'appel à…”
The core scope of work for this tender involves a restricted design competition for the reconstruction of Paul Langevin college and the demolition of the old college in Sainte Savine.
The statement of work summary includes a base mission (mission de base) and complementary missions (missions complémentaires).
The base mission entails:
- ESQ (Esquisse +), which is the Sketch + phase.
- APS (Avant-Projet Sommaire) for preliminary design.
- APD (Avant-Projet Définitif) for detailed preliminary design.
- PRO (Etudes de Projet y compris PC) for project studies, including the building permit.
- ACT (Assistance pour la passation des Contrats de Travaux) for assistance in awarding works contracts.
- VISA (Examen de conformité - visa), a compliance review, partial for non-technical lots.
- EXE (Etudes d'exécution et de synthèse) for execution and synthesis studies, partial for technical lots.
- SYN (Synthèse pour l'ensemble des lots) for overall lot synthesis.
- DET (Direction de l'Exécution des Travaux) for directing the execution of works.
- AOR (Assistance aux Opérations de Réception et pendant la Période de Garantie de Parfait Achèvement) for assistance during acceptance operations and the perfect completion guarantee period.
The complementary missions include:
- SSI (Coordination Système de Sécurité Incendie) for Fire Safety System Coordination.
- COM (Réalisation des supports de communication spécifiques) for creating specific communication materials such as slideshows and brochures.
- EQUIP (Définition des équipements mobiliers et appareillages) for defining furniture and equipment, including ergonomic studies for space layouts.
The works are expected to be completed before the start of the school year in September 2028. The exact content of these missions will be finalized during the negotiation phase of the framework agreement.
Sources
- 12_2026-02-069_Fiche Candidat à compléter OBLIGATOIREMENT.xlsx — “,,,,,,,,,,, "Procédure n° 2026-02-069 CONCOURS RESTREINT de Maîtrise d'œuvre sur Esquisse + pour la reconstruction du collège Paul Langevin et la déconstruction de l'ancien collège à Sainte Savine",,,,,,,,,,, ,,,,,,,,,,,…”
- 21_2026_02_069_Reglement concours 1ere phase.pdf — “préaux, ...) devront être envisagés avant la rentrée scolaire de septembre 2028. Les travaux feront l'objet d'une dévolution en marchés séparés. 4.4. Contenu de la mission de maîtrise d'œuvre La mission confiée à l'attri…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 12 FILES
- 4_2026-02-069_Trame DC1.docx69 KBDOCX
- 3_2026-02-069_Document AFFICHES à compléter OBLIGATOIREMENT.pptx120 KBPPTX
- 9_2026-02-069_Déclaration sur l'honneur.pdf136 KBPDF
and 5 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.