Published
Construction et réhabilitation du pôle hôtellerie - restauration - alimentation du lycée Gustave Eiffel de Reims (51) - Phases 1 et 2 - (Mapa petits lots)
Notice number: 26-72056
KEY INFORMATION
- Submission deadline
- • Sep 21, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Région Grand Est
- Accepted Languages
- French
- Tender type
- Works
- Contract Value
- Published date
- Jul 20, 2026
TENDER DESCRIPTION
This tender seeks a contractor for the multi-phase construction and rehabilitation of the hotel, restaurant, and food services center at the Gustave Eiffel High School in Reims (51), spanning an overall provisional execution period of nineteen (19) months, divided into a three-month Phase 1 for preparatory works and a sixteen-month Phase 2 for the extension building. The comprehensive scope of work includes general and preparatory works, asbestos removal, demolition, structural work, electrical installations (strong and weak currents), photovoltaic systems, and false ceilings. Key technical requirements include adherence to French standards (DTU, Eurocodes), ERP safety regulations, new accessibility standards, an E3C1 energy performance objective for new construction, specific air permeability targets, and technical control by DEKRA INDUSTRIAL with specified missions, alongside the supply of various specialized kitchen equipment. Bidders must demonstrate relevant global turnover for the last three financial years and provide proof of professional risk insurance.
TENDER BRIEF
The contract has an overall provisional execution period of nineteen (19) months. This duration is divided into two phases: Phase 1 is three (3) months, and Phase 2 is sixteen (16) months. The execution deadlines begin from the contractor's first intervention on the construction site and conclude with their final intervention. Specific calendar start and end dates are not explicitly stated.
Sources
- 12026M0404_TRAVAUX_CCAP.pdf — “du chantier dans les conditions prévues à l'article 28.2.3 (travaux allotis) du CCAG-Travaux et précisé à l'article 4.1.3 du CCAP. PAR PHASES Le délai global prévisionnel d'exécution de l'ensemble des travaux est fixé à…”
The core scope of work for this tender involves a multi-phase construction and renovation project, encompassing various specialized lots.
High-level Summary of Statement of Work and Core Deliverables:
The project includes:
- General and Preparatory Works: Installation of site facilities (e.g., base camp, chantier), provision of lifting equipment, site power supply, engineering services, execution plans, pro-rata account management, and geotechnical studies and monitoring. This also covers temporary site fencing, gates, signage, and waste bins.
- Demolition and Structural Work (Lot 02): This involves bringing, setting up, maintaining, and removing site installations, protecting existing structures, performing earthworks and backfilling for buried structures, and potentially including shoring, dewatering, and underpinning. Key tasks include general on-site implantation, staking, providing scaffolding and access platforms, and waterproofing of walls and buried structures. Specific demolitions include openings for doors and a niche, as well as partial demolition and reconstruction of a facade element.
- Asbestos Removal and Demolition (Lot 01): This lot covers all asbestos removal and demolition works, along with necessary auxiliary and accessory tasks to achieve a complete and perfect finish in accordance with regulations and contractual documents.
- Electrical Works (Lot 14 - Strong and Weak Currents): The scope includes detailed studies, on-site surveys, and verifications before planning and manufacturing. Deliverables comprise workshop and site plans, dimensioning calculations, supply and installation of materials and equipment, supervision of works until reception, and as-built plans for temporary installations. Specific tasks involve neutralizing and removing existing electrical installations (including a sub-station), modifying the existing TGBT GH and networks to maintain building H's operation, and removing the existing transformer at project completion.
- Photovoltaic Installations (Lot 24): This lot entails general works, strong and weak current electrical installations, and various supporting services such as handling, hygiene and safety provisions, creation of reservation plans, execution plans, end-of-project services, calculation notes, material specification, samples, coordination with ENEDIS and CONSUEL, air tightness services, and cleaning. Crucially, it involves the establishment of the earth network and the installation of the photovoltaic system itself.
- False Ceilings (Lot 10): This includes the execution studies for the installation of insulation and false ceilings in the designated work areas.
- Phasing: The project is structured in phases. Phase 1 focuses on preparatory works such as temporary installations, maintaining gate functionality, modifying emergency exits, and rerouting networks. Phase 2 concerns the realization of the extension building (G'), including earthworks, insulation, and false ceilings.
The deliverables also include producing various plans such as reservation plans, execution plans, and as-built plans. Testing, controls, and final receptions of the works are also specified.
Sources
- 1240531 DPGF DCE fevrier 2026-1.xlsx — “Installation base vie ,,E,,,0,E,,,0,E,0,,0 ,,- Installation chantier,,E,,,0,E,,,0,E,0,,0 ,,- Moyens de levage,,E,,,0,E,,,0,E,0,,0 ,,- Alimentation du chantier,,E,,,0,E,,,0,E,0,,0 ,,- Prestations ingénierie et matériels,,…”
- 2Lycée Gustave Eiffel - DCE ind B - Lot 02 Démolition - Gros-oeuvre-1.pdf — “de travail ne devra être visible. POSTE 14. ETENDUS DES TRAVAUX Les prestations à la charge de l'entreprise comprennent notamment sans que cette liste soit limitative: - L'amenée, la mise en place, la maintenance et le r…”
- 3Lycée Gustave Eiffel - DCE ind B- Lot 01 Désamiantage-1.pdf — “à la réalisation de l'ensemble des travaux et l'entrepreneur se reportera à ces autres pièces écrites afin de connaître les limites de ses propres prestations. Les prestations à charge du présent lot comprennent tous les…”
- 42026 02 - LGE - DCE - CCTP - LOT 14 ELEC - IND B.pdf — “Maîtrise d'Œuvre | 5 1.5 Liste des plans. | 6 1.6 Classement de l'établissement | 6 1.7 Qualification de l'entreprise... | .6 1.8 Réglementation applicable. | 7 1.9 Abréviations utilisées | 8 2. PHASAGE DES TRAVAUX | 9 2…”
- 52026 02 - LGE - DCE - CCTP - LOT 24 PHOTOVOLTAIQUE - IND B.pdf — “| 4 1.5 Classement de l'établissement | 5 1.1 Qualification de l'entreprise... | 5 1.2 Règlementations applicables. | 5 2. DESCRIPTION SOMMAIRE DES TRAVAUX PROJETES | 7 2.1 Pour les travaux d'ordre général... | 7 2.2 Pou…”
- 6DCE CCTP IND B - LOT 10 FAUX PLAFONDS.pdf — “l'isolation et des faux plafonds sur les zones de travaux conformément à la réglementation et les demandes du bureau de contrôle et du maître d'œuvre suivant plans, coupes et élévations. Phase 2: Bâtiment extension G': P…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 674 FILES
- isolant-1.pat54 BPAT
- DC1-2019.doc128 KBDOC
- E21.5467-DCE-Z-CHA-TT-002-B-1.pdf658 KBPDF
and 667 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.