Published
Contrato mixto de servicios y obras para la implantación y mantenimiento de un sistema integral de videovigilancia inteligente y análisis urbano de seguridad.
Notice number: 00535263-2026
KEY INFORMATION
- Submission deadline
- • Sep 10, 2026
- Location
- 🇪🇸 Spain
- Contracting authority
- Ajuntament de Badalona
- Accepted Languages
- CAT, Spanish, English, OCI
- Tender type
- Services
- Contract Value
- Published date
- Aug 3, 2026
TENDER DESCRIPTION
This mixed contract encompasses the implementation and ongoing maintenance of an integrated intelligent video surveillance and urban security analysis system for the city of Badalona. The scope involves the installation, configuration, and commissioning of a Cloud-based Video Management System (VMS) platform, including CCTV management, streaming, recording, and storage, alongside the deployment of Automatic License Plate Recognition (LPR) and advanced video analytics solutions, a comprehensive security platform, and the necessary connectivity infrastructure with associated civil works. Proposers must demonstrate a minimum annual turnover of €7,295,063.76 in their best financial year of the last three available and possess professional liability insurance of at least €5,000,000.00 per claim and per year. The system requires a Cloud multi-role architecture, a police-exclusive mobile application, robust security features like MFA and data encryption, edge computing capabilities with an on-the-edge AI engine, and compliance with standards such as ONVIF profiles S, G, T, M, ENS MITJA, and ISO/IEC 27001. The contract has a fixed duration of 5 years and 6 months, structured across four…
TENDER BRIEF
The contract has a total duration of 5 years and 6 months, counted from the day after its formalization. No extension is foreseen. The finalization date will be adjusted based on the effective start date.
The contract is divided into the following key phases:
- Phase I: Project Drafting (Redacció del projecte) will last 3 months. This phase encompasses all necessary actions for the definition and approval of the works project, including drafting the executive project (1.5 months), supervision, initial approval, public exhibition (30 days), resolution of allegations, and definitive approval. This phase is intended to be carried out entirely within the 2026 annuity, specifically between October 1, 2026, and December 31, 2026.
- Phase II: Execution of Works (Execució de les obres) will last 9 months. This phase begins once the project is definitively approved, starting the day after the signing of the verification act of the project layout.
- Phase III: Implementation and Commissioning (Implantació i posada en marxa) will last 9 months. This phase is scheduled to start 3 months after the beginning of Phase II. The start of the implementation service will be marked by the signing of an initiation act by both parties, and this phase may occur simultaneously with Phase II. The duration of the main service provision for the mixed contract (Phase III and Phase IV) will commence upon the completion of the works, or when the works are sufficiently advanced to allow for the parallel initiation of Phase III.
- Phase IV: Operation and Maintenance (Operació i manteniment) will last 4 years and 3 months. This phase includes the provision of operation and maintenance services for the integrated video surveillance system. The maximum 5-year period for successive service contracts, as per Article 29.4 of the LCSP, will begin with the execution of Phase III.
Sources
- 1PCAP-Plec_Clausules_Administratives_generic (4).pdf — “total del contracte mixt serà de 5 anys i 6 mesos, comptats des de l'endemà de la formalització, comprensiva de les diferents fases successives que integren l'objecte contractual: redacció del projecte executiu, execució…”
- 2Memoria_Justificativa (2).pdf — “per motius de caràcter tècnic, de dimensió excepcional o atesa la metodologia de treball i per tal de garantir l'eficiència es justifiqui a la memòria, de forma motivada, que la contractació conjunta és necessària per a…”
The core scope of work and statement of work summary for this tender includes several key deliverables and phases:
Core Deliverables and Services:
- Installation, configuration, parameterization, and commissioning of a Cloud-based Video Management System (VMS) platform, encompassing CCTV management, streaming, recording, and storage functionalities.
- Installation and configuration of the native server associated with the Cloud VMS solution.
- Implementation, configuration, and parameterization of an Automatic License Plate Recognition (LPR) analytics solution.
- Implementation, configuration, and parameterization of an advanced video analytics solution.
- Implementation, configuration, and parameterization of a comprehensive security platform and the operation of the control center.
- Functional and technical integration across various technological platforms, capture devices, communication infrastructure, and control center operating environments.
- Execution of functional, integration, and performance tests, along with validation of the system's commissioning.
- Delivery of essential documentation, including technical documentation, user and operation manuals, configurations, and a system inventory.
- Provision of training and knowledge transfer activities necessary for system usage, administration, and operation.
- Development of connectivity infrastructure, which involves civil works for fiber optics (micro-trenches, conduits, manholes), cable laying, and the installation, configuration, and integration of access equipment (CPE, 5G routers) into the central communications node, ensuring specified service levels.
- Management of the overall project through a Project Management Office (PMO), which provides transversal governance, coordination, and monitoring services, including planning, risk management, progress tracking, and support for validation of actions.
Project Phases:
- Phase I: Project Drafting: This initial phase involves the technical definition and administrative validation of the solution, including the drafting of the works project, supervision, public exhibition, and final approval processes.
- Phase II: Execution of Works: This phase focuses on the provision of necessary equipment and materials, along with their installation, deployment, and integration into the overall system infrastructure.
- Phase III: Implementation and Commissioning: During this phase, all implementation actions are executed, which may partially overlap with Phase II.
- Phase IV: Operation and Maintenance: This ongoing phase commences once all infrastructures and technological solutions are fully deployed and operational.
Sources
- 1Memoria_Justificativa (2).pdf — “previstos, d'acord amb el calendari de desplegament i posada en servei del sistema. Instal·lació, configuració, parametrització i posada en funcionament de la plataforma VMS en entorn Cloud, incloent les funcionalitats d…”
- 2Plec_de_prescripcions_tecniques (1).pdf — “la fibra òptica (micro-rases, canalitzacions, arquetes), l'estesa del cablejat, la instal·lació, configuració i integració dels equips d'accés (CPE, routers 5G) i la seva integració al node central de comunicacions. Aque…”
- 3PCAP-Plec_Clausules_Administratives_generic (4).pdf — “€ | 484.406,19 € | 586.131,49 € Programari | Implantació, configuració i parametrització de la solució d'analítica de lectura - automàtica de matrícules (LPR) Implantació, configuració i parametrització de la solució d'a…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 4 FILES
- Certificat_d_acord.pdf60 KBPDF
- Plec_de_prescripcions_tecniques (1).pdf405 KBPDF
- PCAP-Plec_Clausules_Administratives_generic (4).pdf1008 KBPDF
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.