Published
Ctr-cc passerelles fixes
Notice number: 00528211-2026
KEY INFORMATION
- Submission deadline
- • Sep 9, 2026
- Location
- 🇫🇷 France
- Contracting authority
- SNCF Voyageurs
- Accepted Languages
- French
- Tender type
- Goods
- Contract Value
- Published date
- Jul 30, 2026
TENDER DESCRIPTION
This tender outlines a framework agreement for the comprehensive supply, delivery, installation, and commissioning of fixed roof access walkways (PASSERELLES FIXES) for technical centers, encompassing all necessary studies, material provision, machine operating software development, and site safety management. The scope further requires adherence to specific technical standards and technologies including Andon systems, PANORAMA supervision, OPC UA/TCP IP protocols, and RJ 45 connectivity, along with compliance with NF EN 547 and NF X 60-301 for maintenance operations. The contract is established for a firm duration of five years, with the possibility of three one-year renewals, not exceeding a total of eight years, and includes defined milestones for factory reception, site delivery, and provisional and definitive equipment receptions. Financially, bidders must demonstrate a minimum annual turnover of 2,400,000€ over the last three years and provide comprehensive financial documentation.
TENDER BRIEF
The contract has a firm duration of five (5) years, with the possibility of three (3) one-year renewals. The total duration cannot exceed 8 years.
Key milestones mentioned include:
- Reception of the equipment at the factory (verification of supplies) and triggering of delivery authorization at T0 + a certain number of weeks.
- Delivery of the equipment to the site at T0 + a certain number of weeks.
- Provisional reception of the equipment (following connection, installation, tests, and commissioning) at T0 + a certain number of weeks.
- Definitive reception will occur within 2 months after the validation of the provisional reception.
All stated deadlines are counted in calendar days unless explicitly specified otherwise.
Sources
- 11_REC Reglement de Consultation - CC passerelles.docx — “http://ted.europa.eu – sous la référence : Avis n° 528211-2026 du 30.07.2026 Forme du contrat Le Contrat attribué au terme de la présente consultation prendra la forme juridique d’un accord-cadre multi-attributaires. Cet…”
- 24- 2026DOS0676026 -Projet CPS -CC PASSERELLES.docx — “aucun cas être supérieure à 8ans. L'absence de prorogation ne donne lieu à aucun versement d'indemnité de la part de la Société. Articles du Contrat continuant à lier les parties Les stipulations du Contrat relatives à l…”
The core scope of work for this tender involves the provision, installation, and commissioning of "PASSERELLES FIXES" (Fixed Gangways). The Statement of Work summary and core deliverables include:
- Supply and Installation: Delivery of equipment, site safety management, coordination, and site supervision. This encompasses studies, plans, construction of the installation, supply of materials, and the development of machine operating software.
- Planning and Execution: Detailed methodologies for delivery, handling, installation, and necessary storage/assembly areas. This also includes a general planning outlining tasks, durations, human resources, and required on-site equipment and energy.
- Quality and Compliance: Implementation of a quality control plan and recommended tests, dimensional validation of civil engineering, factory acceptance (if possible), equipment packaging, transport, unloading, and handling on site.
- Commissioning and Receptions: Provisional and definitive receptions, including verification by an approved body and a commissioning report.
- Documentation: Provision of various documents at different stages: with the tender offer, upon delivery (per § 5.4.1), at provisional reception (including CE conformity certificates and verification reports), and at definitive reception (definitive contractual documents and software per §5.7). All nomenclatures with commercial references must be supplied. Specific connectivity documentation such as a multifilar diagram, equipment list with technical sheets, data points, and technical synoptic of the installation, and validation of SNCF cybersecurity documents are also required.
- Post-Installation Support: Supplier assistance until definitive reception and a warranty period.
- Training: Training sessions for both operating and maintenance personnel, delivered in French.
- Studies and Analysis: Provision of a Failure Mode, Effects, and Criticality Analysis (AMDEC) and a risk analysis.
- On-site Presence: A French-speaking contact person from the supplier is required on site during assembly and reception phases. The tenderer is expected to prioritize in-person actions for deployment and communicate regularly with the SNCF Project Manager on deployment progress.
- Connectivity: The connectivity system must be configured and operational at provisional reception.
- Optional Services (PSE):
- PSE1: Predictive maintenance.
- PSE2: 2nd mobile end-guardrail.
- PSE3: Adaptability of the gangway for work on trains rather than engine casing.
- PSE4: 5T / 6.3m double-girder overhead crane (alternative to PSE7).
- PSE5: Complete opening of end guardrails for load passage.
- PSE6: SNCF SI Connectivity.
- PSE7: KBK + 130 kg hoist (alternative to PSE4).
- Other Services: Transport, unloading, installation, commissioning, on-site control body examination, and a 3D model option.
- Exclusions: Energy connections and civil engineering works are the responsibility of SNCF.
Sources
- 13-2026DOS0676026-CC PASSERELLES FIXES - Clause à Clause .xlsx — “à fournir,F0,,,,,,,,,,,,,,,,,, ,, 28.5 ,Toutes les nomenclatures sont à fournir avec la référence du commerce.,F0,,,,,,,,,,,,,,,,,, ,remise de l’offre, 28.6 ,Voir § 3,F0,,,,,,,,,,,,,,,,,, 29,Travaux sur site, 29.1. ,Voir…”
- 22-2026DOS0676026 - CdC_CTR_Passerelle_Fixe_Accès_toiture_V0_08072026.docx.pdf — “délais ne mettant pas en cause le délai final. 8.2 Objectifs Le fournisseur devra fournir une machine capable d’obtenir des résultats précis et chiffrés (chiffres fournis dans la réponse à l’appel d’offres) : • Performan…”
- 36-2026DOS0676026 - CC Passerelles - BPU.xlsx — “/ explications" Transport ,,,,,qté camion pour 1 passerelle à préciser Déchargement & Amenée sur zone,,,,, "Montage Installation, Mise en service ",,,,, Examen par organisme de contrôle sur site ,,,,, Formation Utilisate…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 7 FILES
- 7-2026DOS0676026 CC Passerelles fixes-Questions Réponses.xlsx34 KBXLSX
- 1_REC Reglement de Consultation - CC passerelles.docx125 KBDOCX
- 4- 2026DOS0676026 -Projet CPS -CC PASSERELLES.docx180 KBDOCX
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.