Published
Доставка, внедряване, интеграция и поддръжка на система за електронно подписване/ Delivery, implementation, integration and support of an electronic signature system
Notice number: 00678388-2026
KEY INFORMATION
- Submission deadline
- • Nov 3, 2026
- Location
- 🇧🇬 Bulgaria
- Contracting authority
- Електроразпределение Юг ЕАД
- Accepted Languages
- Bulgarian
- Tender type
- Goods
- Contract Value
- Published date
- Oct 2, 2026
TENDER DESCRIPTION
This tender seeks a contractor for the delivery, implementation, integration, and support of a cloud-based electronic document management and signing system, acquired as Software as a Service (SaaS). The core scope involves the configuration and commissioning of the system, including providing a detailed software solution description, comprehensive documentation (User Guide and Administrator’s Guide) in English, and online training for administrators and key users. Additionally, the contractor must establish a mirror test system for software changes and ensure full system acceptance following testing. Technically, the solution must support OAuth2/OpenID Connect, REST API, Webhooks, provide a responsive UI across major browsers and mobile platforms, offer scalable cloud architecture, and integrate extensively with Microsoft ecosystem components like Outlook, Teams, Entra ID/Intune, and SharePoint, with optional SAP S/4HANA connectivity. Performance requirements include a ≥99.9% uptime SLA, support for ≥50 concurrent users, and document load times of ≤3 seconds, all while complying with eIDAS and GDPR. The contract timeline stipulates that full system implementation, training, and…
TENDER BRIEF
The contract timeline indicates that the actual work on the implementation and configuration of the archiving system will commence either after the CONTRACTOR receives a request for performance at an initially agreed price and a postponement period of the contract, which extends until 12 (twelve) calendar months from the contract signing date, or after the CONTRACTOR provides written confirmation of accepting the request if the 12 (twelve) month period has already lapsed. The initiation of performance is contingent upon the Contracting Authority sending a request to the Contractor, explicitly stating the desired start date for services. Such requests for services can be made by the Contracting Authority for up to 12 (twelve) calendar months from the date of contract signing.
Key milestones include:
- Preparation and submission of a system implementation plan, encompassing analysis, configuration, integrations, tests, key user training, and commissioning. This plan must be agreed upon with the Contracting Authority once the contract becomes effective.
- The full implementation of a functional system, training for administrators and key users, and the provision of user, administration, and integration documentation, must be completed within 4 (four) months from the contract's effective date or the date of the last signature.
- Warranty maintenance terms specify a response deadline of up to 1 hour from notification for system problems. For Priority 1 incidents leading to a complete refusal to use the system or limitation of basic functionalities, the response period is 1 (one) hour from the moment the Contracting Authority sends a notification.
The contract's end date is not explicitly stated. The total duration is not explicitly stated as a single overall contract duration, but there are specific durations for implementation and the period for making service requests.
Sources
- 1Contract draft_as.docx — “period and 1.2.2. The CONTRACTOR has not exercised its right to terminate this contract, and 1.2.3. The CONTRACTOR confirms in writing the execution of the request at: (i) the price originally agreed or (ii) at a price u…”
- 2Contract draft_st.docx — “of the last signature. (2) The CONTRACTOR shall be obliged to prepare and provide a plan for the implementation of the system, including analysis, configuration, integrations, tests, training of key users and commissioni…”
The core scope of work for this tender involves the configuration and commissioning of an electronic document management and signing system. The contractor is responsible for providing a detailed description of the selected software solution, including its architecture and block diagram. All user and other functionalities, as well as necessary processes, must be configured according to the Contracting Authority's requirements. Core deliverables include full documentation of the configuration in English, user guides in English (at least a User Guide and an Administrator’s Guide), and online training for administrators and key users based on an agreed schedule and plan. Additionally, the contractor must set up a mirror test system with minimal resources for applying software changes before they are introduced into the production environment. The system will be accepted by the Contracting Authority following testing and the signing of a bilateral protocol.
Sources
- 1Technical requirments_st.docx — “Contracting Authority: Configuration and commissioning of the electronic document management and signing system. The system shall be accepted by the Contracting Authority following testing and the signing of a bilateral…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 34 FILES
- Методика за комплексна оценка.docx72 KBDOCX
- График.pdf38 KBPDF
- Проект на договор.docx109 KBDOCX
and 27 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.