    Déploiement d'un système permanent de vidéodétection et de localisation par intelligence artificielle des feux de forêts et incendie

    Notice number: 00578510-2026

    🇫🇷 FranceConseil Départemental de Côte d'Or (21)Goods

    KEY INFORMATION

    Submission deadline
    Sep 24, 2026
    Location
    🇫🇷 France
    Contracting authority
    Conseil Départemental de Côte d'Or (21)
    Accepted Languages
    French
    Tender type
    Goods
    Contract Value
    Published date
    Aug 21, 2026

    TENDER DESCRIPTION

    This tender seeks the deployment of a permanent video-surveillance and artificial-intelligence-based system for the early detection and location of wildfires in natural areas, ensuring 24/7 monitoring and delivering contextualized alerts to the CTA-CODIS. The comprehensive scope of work includes initial studies, site securing, equipment supply, installation, software and AI integration, extensive testing, training, ongoing maintenance, and reversibility provisions for AI models. Technically, the solution must feature an on-premise centralized architecture, leveraging the Department's existing Micro Data Center, GPU capacities, and 2 petabytes of storage, with all external hardware engineered to endure extreme environmental conditions from -20°C to +45°C and winds exceeding 120 km/h. Proposers are required to declare their global annual turnover for the last three financial years, with the contract spanning four years from notification and a critical milestone requiring the entire network to be operational by June 15, 2027.

    TENDER BRIEF

    The contract has a total duration of four years, commencing from the date of its notification.

    A key milestone is that the entire ordered network must be operational by June 15, 2027, at the latest. This includes the high points ordered, transmissions, the platform, the integration of Mont Afrique, CTA-CODIS functions, and the necessary training for operation.

    The project is structured into eight distinct phases:

    1. Lancement (Launch): Involves organization, data collection, planning, governance, and interfaces.

    2. Étude territoriale (Territorial Study): Includes coverage calculations, identification of high points, scenario development, and restitution.

    3. Sécurisation (Securing): Consists of in-depth studies, contacts, site visits, cost analysis, conventions, and substitutions.

    4. Commandes de sites (Site Orders): Pertains to arbitration and the issuance of purchase orders by the Department.

    5. Conception détaillée (Detailed Design): Covers architecture, site plans, security measures, and acceptance procedures.

    6. Déploiement (Deployment): Encompasses works, installations, integration, tests, and partial admissions.

    7. Mise en service globale (Global Commissioning): Includes training, operational handover, validation of aptitude (VA), and the start of the Service Verification and Reliability (VSR) period.

    8. VSR et admission (VSR and Admission): Involves real-condition measurements, corrections, and definitive admission.

    The specific contract start and end dates are not explicitly stated, but the duration is four years from the notification of the framework agreement.

    Sources

    • 102 CCAP projet.pdf — “ferme et une partie à bons de commande. La partie forfaitaire couvre au minimum l'étude territoriale initiale, l'intégration du Mont Afrique, l'installation initiale de la plateforme et les formations initiales telles qu…
    • 203 CCTP projet modif26.08.2026.pdf — “points hauts. La totalité du réseau commandé dans un délai de 60 jours après la notification du marché doit être installée, intégrée, testée et opérationnelle au plus tard le 15 juin 2027. Cette échéance comprend les poi…

    The core scope of work for this tender is the deployment of a permanent video detection and localization system, utilizing artificial intelligence, for the purpose of identifying fires in natural spaces.

    The Statement of Work (SOW) summary and core deliverables encompass a comprehensive range of activities and outputs, including:

    Key Services and Activities:

    • Initial Studies and Planning: Complete territorial studies, coverage calculations, progressive scenarios, identification and securing of high-point sites, and technical negotiations with site owners/managers for occupation agreements. This also includes site, structure, and integration studies, along with project planning, governance, risk management, and quality assurance.
    • Equipment and Installation: Supply, installation, and commissioning of all necessary hardware, including cameras, optics, supports, enclosures, protections, and transmission equipment, along with standard energy and telecommunications connections.
    • Software and AI Integration: Integration of existing equipment (e.g., Mont Afrique), software integration, and AI configuration for high points, including mapping, localization, notifications, alert workflows, and functions for CTA-CODIS (fire and rescue operational center). This also involves providing operating licenses based on the number of cameras.
    • Testing, Acceptance, and Training: Conducting tests, acceptances, partial admissions, and regular service verification (VSR). Furthermore, the scope includes training, skills transfer, and comprehensive documentation.
    • Ongoing Support and Maintenance: Providing warranty, preventive and corrective maintenance, and planned updates. Occasional services for system reinforcement, parameterization, or assistance are also included.
    • Reversibility and Continuity: Ensuring reversibility at the end of the contract, including the provision of a license for the continuation of AI models.

    Core Deliverables (Minimum Requirements):

    • Reports and Studies: Methodological report, territorial study report, and a table detailing costs, risks, deadlines, and dependencies.
    • Geographic Information System (GIS) Data: Authorized source databases, vector and raster coverage layers, layers for high points and mask zones, simple and double coverage maps, and a contractual SIG repository with vector layers, data dictionary, and methodological note.
    • Site-Specific Documentation: Preliminary site sheets and detailed site sheets for each proposed high point, including identification, location, ownership, technical specifications, access, power, telecommunications, existing installations, constraints, foreseeable works, estimated rent, feasibility, risks, delays, and substitute solutions.
    • Project Documentation: Project plan, governance plan, planning documents (including a consolidated planning with critical path, studies, securing, authorizations, orders, connections, installations, integrations, training, and acceptances), risk register, and quality plan.
    • Design and Engineering Documents: Architecture file, site files, flow diagrams, security plans, and test plans.
    • Installation and Post-Installation Records: Plans, calculation notes, security protocols, authorizations, DOE (Dossier des Ouvrages Exécutés), photos, wiring diagrams, equipment inventory, configurations, certificates, and PVs.
    • Platform and Software Documentation: Installation, exploitation, backup, supervision, security, and update files for the platform, along with user and administrator manuals, rights matrix, API documentation, workflows, and formats for the software.
    • Testing and Acceptance Documentation: Test book, test results, anomaly lists, site PVs, VA (Verification of Aptitude), VSR (Verification of Regular Service), and admission reports.
    • Maintenance Documentation: Maintenance plan, procedures, emergency stock list, maintenance reports, and version register.
    • End of Contract/Reversibility Data: Exports, dictionaries, accounts, certificates, keys, configurations, deletion attestation, AI model weights, inference scripts and binaries, and AI documentation.
    • Presentations: Restitution presentations to the Department and SDIS 21.

    Sources

    • 102 CCAP projet.pdf — “Projet de Cahier des clauses administratives particulières ACCORD-CADRE PUBLIC DE TECHNIQUES DE L'INFORMATION ET DE LA COMMUNICATION Objet de l'accord-cadre Déploiement d'un système permanent de vidéodétection et de loca…
    • 203 CCTP projet modif26.08.2026.pdf — “la levée de doute, la gestion des alertes, la journalisation et l'export des données sans dépendre d'un service cloud externe non autorisé. 2. Périmètre des prestations 2.1. Prestations comprises dans le périmètre standa…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 12 FILES

    • 05 DC4 2023.rtf
    • OCSGE_2023.gpkg
    • 04 DC1 2019.doc

    and 5 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders