Published

    LOTUL 1 – Servicii dezvoltare platformă eUNBR și securitate cibernetică, inclusiv pregătire personal

    Notice number: 00605110-2026

    🇷🇴 RomaniaUniunea nationala a barourilor din romaniaServices

    KEY INFORMATION

    Submission deadline
    Sep 11, 2026
    Location
    🇷🇴 Romania
    Contracting authority
    Uniunea nationala a barourilor din romania
    Accepted Languages
    Romanian
    Tender type
    Services
    Contract Value
    Published date
    Sep 2, 2026

    TENDER DESCRIPTION

    This procurement, designated as LOT 1, seeks comprehensive services for the development, implementation, and operationalization of the eUNBR platform, alongside integrated cybersecurity solutions and personnel training. The core scope encompasses analysis, design, development, software license provision, installation, configuration, testing, data migration, and interoperability with systems like ECRIS V and ROeID, ensuring a unified IT solution for the National Union of Bar Associations in Romania. Key technical requirements include a microservices architecture, deployment exclusively in the ADR governmental cloud using open standards, data storage within Romania on EU-hosted cloud infrastructure, and adherence to performance metrics such as 99.5% uptime, RTO less than 4 hours, and RPO less than 1 hour. Additionally, the tender mandates robust cybersecurity with a SIEM solution for 24/7 monitoring, WAF, AES-256 encryption, and compliance with GDPR and OWASP Top Ten. Bidders must demonstrate a minimum average annual global turnover for Lot 1 of 15,645,764.23 Lei for the last three concluded financial years, with the entire implementation period not exceeding 21 months from…

    TENDER BRIEF

    The contract timeline is as follows:

    • Total Duration: The implementation period of the contract is a maximum of 21 months.
    • Contract Start Date: The contract enters into force on the date it is signed by both parties. The 21-month implementation period commences from the date of the contract's conclusion/signing. The exact signing date is not fixed at the time of clarification, as it depends on the tender procedure.
    • Order to Start: An Order to Start will be issued within a maximum of 5 working days after the performance guarantee is established. However, the issuance of this order does not change the commencement date of the 21-month implementation period, which remains the contract signing date.
    • Key Milestones/Phases: The contract includes six indicative stages:
    • Stage 1: approximately 2 months.
    • Stage 2: approximately 10 months.
    • Stage 3: approximately 3 months.
    • Stage 4: approximately 2 months.
    • Stage 5: approximately 3 months.
    • Stage 6: approximately 1 month.

    The stated durations for these stages are indicative, and the total duration of 21 months represents a firm maximum ceiling. Offerors are permitted to propose an alternative distribution of durations for these stages.

    Sources

    • 1Raspuns consolidat solicitari clarificari_UNBR - LOT 1.pdf — “Etapa 1, fără depăşirea duratei totale maxime de 21 de luni. De altfel, pentru componenta de securitate cibernetică, Caietul de sarcini precizează | ferm, a cărui depășire atrage penalități și reziliere, sau durată orien…
    • 203.1.1. Sectiunea-III-Model-Contract de servicii_UNBR - LOT 1.pdf — “Legea nr. 98/2016 şi de Hotărârea Guvernului nr. 395/2016. Art. III Durata Contractului III.1. Prezentul Contract intră în vigoare la data semnării de către ambele Părți și are durata prevăzută la art. III.2. Încetarea d…

    The core scope of work and statement of work summary for this tender involves the comprehensive development, implementation, and operationalization of the eUNBR platform and its associated integrated cybersecurity solution.

    Key activities include:

    • Developing, implementing, integrating, configuring, testing, and operationalizing software components and the cybersecurity solution.
    • Delivering, installing, configuring, and commissioning hardware equipment.
    • Managing the logistics of hardware equipment, including packaging, labeling, handling, transport, delivery, and insurance.
    • Providing technical support, maintenance, warranty, and remediation for incidents, vulnerabilities, and defects during the warranty and support period.
    • Conducting analysis, design, integration, and operationalization of the eUNBR platform and its cybersecurity components.
    • Ensuring interoperability with external IT systems, data migration, and synchronization.
    • Configuring and commissioning developed software components, monitoring and analyzing security events, identifying vulnerabilities, and setting up detection and alerting mechanisms.
    • Providing training and instruction for designated personnel.
    • Ensuring the system functions securely, with interoperability, scalability, availability, and performance suitable for national use, continuous security monitoring, and compliance with legal requirements for information security, data protection, and cybersecurity.
    • Defining the operational, functional, and technical framework for the contractor's activities through a logical structure of activities and results to ensure a phased, coherent, and controllable implementation process.
    • The contract's object and expected results are cumulatively defined by the Statement of Work and its annexes, covering detailed non-functional requirements, functional modules, infrastructure, implementation activities and deliverables, technical requirements for the SIEM solution, security event collection, correlation and analysis, vulnerability scanning, integration, training, support, maintenance, and service levels for the "PLATFORMA e-UNBR" project (Lot 1).

    Core deliverables explicitly stated include:

    • Project Management Plan (L-01): Defining project organization, management structure, coordination, activity planning, monitoring, and control procedures.
    • Requirements Analysis Document (L-02): Describing functional and non-functional requirements, operational flows, and identified needs.
    • Architecture and Design Document (L-03): Outlining the functional and technical architecture, solution components, integration mechanisms, and overall system structure.
    • Implementation and Testing Plan (L-04): Detailing the implementation strategy, testing scenarios, validation mechanisms, and testing phase planning.
    • Testing and Validation Report (L-05): Presenting results from functional, technical, and operational tests.
    • Technical and Operational Documentation (L-06).
    • User and Administration Manuals (L-07).
    • Consolidated mandatory deliverables also include the solution, configurations, executables, documentation, reports and testing, governance, and training and acceptance.

    Sources

    • 1Instructiuni_ofertanti_FisaDate_DF1277169.pdf — “în contextul cerințelor incluse în caietul de sarcini, prin prezentarea activităților şi a modalităţii efective de realizare a acestora pentru a demonstra atingerea obiectivelor asociate contractului; dezvoltarea, implem…
    • 202.1. Sectiunea-II-CS_UNBR - LOT 1 - Servicii dezvoltare platforma eUNBR si securitate cibernetica, inclusiv pregatire personal.pdf — “urmărite, activitățile ce urmează a fi realizate, rezultatele aşteptate, precum şi atribuţiile și responsabilitățile părților implicate în implementarea Contractului. Serviciile care fac obiectul prezentului capitol vize…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 20 FILES

    • DUAE_CERERE_380287.xml
    • DUAE_CERERE_380303.xml
    • 03.2.2. Sectiunea-III-Model-Conditii generale_UNBR - LOT 2.pdf

    and 13 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders