Ejecución de obras de instalaciones solares fotovoltaicas de autoconsumo de importe inferior a 500.000 euros.
Notice number: ERPC-2026-64
KEY INFORMATION
- Submission deadline
- • Sep 30, 2026
- Location
- 🇪🇸 Spain
- Contracting authority
- Energies Renovables Públiques de Catalunya, SAU
- Accepted Languages
- Spanish
- Tender type
- Contract Value
- Published date
- Jul 31, 2026
TENDER DESCRIPTION
This tender seeks a contractor for the integrated execution of self-consumption photovoltaic solar installations, encompassing project conception, drafting, execution, legalization, and delivery of fully operational systems, including complementary services like administrative processing and grid connection. The scope specifically includes detailed planning and execution of photovoltaic installations, covering phases such as site adaptation, equipment supply and assembly, cabling, inverters, monitoring systems, testing, and "As Built" documentation delivery, for various low and medium voltage PV installations and pergolas. Adherence to comprehensive technical regulations is mandatory, including REBT, CTE, industrial safety, environmental, and cybersecurity standards (e.g., ENS, RGPD, NIS2, Cyber Resilience Act). The framework agreement has a maximum duration of four years, including extensions, with specific project milestones for Lot 1 requiring tasks like initial launch visits and detailed planning within 15 natural days, and work execution and legalization within 8 and 3 natural weeks respectively from site visit/completion. Financial solvency requires a minimum annual…
TENDER BRIEF
The contract timeline is defined as follows:
- Contract Start Date: The Framework Agreement's term will commence the day after the publication of its formalization on L'Energètica's contractor profile, which occurs subsequent to the signing of the last contractual document.
- Contract End Date: Not explicitly stated as a fixed date.
- Total Duration: The duration of the Framework Agreement is specified in section G.1 of the characteristics table. The contract may be extended for a maximum of 3 years beyond its initial validity period. The overall duration, including any extensions, cannot exceed four years, in accordance with Article 219.2 of the LCSP. In exceptional circumstances, if a new Framework Agreement has not been formalized due to unforeseen events and there are public interest reasons to avoid service interruption, the original agreement can be extended for a maximum of nine months, provided the new tender was announced sufficiently in advance.
- Key Milestones and Phases:
- General Execution Milestones for Works Sub-lots:
- Execution of low-voltage work: Begins with a site visit and has a maximum duration of 8 natural weeks from the date of the site visit, concluding with the material completion of the works.
- Legalization of the installation: Starts upon the material completion of the works, with a maximum duration of 3 natural weeks from this point, ending with the submission of all required legalization documentation.
- Commissioning and service launch: Initiates upon the acceptance or validation of legalization documentation (or the availability of all contractor-attributable authorizations), with a maximum duration of 3 natural weeks from validation, ending with functional tests and commissioning.
- Drafting and delivery of the executive project: Commences upon receiving the order and necessary documentation, with a maximum duration of 6 natural weeks from reception, culminating in the delivery of the complete executive project to the contracting body.
- General Execution Milestones for Lot 1: Photovoltaic self-consumption installations:
- Initial launch visit: Maximum 15 natural days from the formalization of the based contract or the availability of necessary information, ending with the signing of the launch act.
- Presentation of detailed planning: Maximum 15 natural days from the launch act, concluding with the delivery of detailed planning.
- Presentation of corrections or amendments required by L'Energètica: Maximum 15 natural days from the receipt of observations, ending with the delivery of the executive project.
- Site visit for works: Maximum 15 natural days from the formalization of the based contract or the delivery of the executive project, ending with the signing of the site visit act.
- Delivery of "As Built" documentation: Maximum 15 natural days from the legalization or commissioning of the installation, concluding with the final delivery.
- Specific Contract Terms: The precise terms for project drafting, work execution, legalization, and commissioning for each specific action will be determined in the corresponding based contract, taking into account the typology, dimension, technical complexity, and configuration of the contracted actions. The specific duration of based contracts cannot be definitively set at the time of tendering the framework agreement.
- Response Times during Execution:
- Proposal for resolving incidents affecting work execution: 7 natural days.
- Communication of incidents affecting deadlines, costs, or quality: Immediate, and in any case, within 1 natural day of detection.
- Action for incidents posing risk to people, installations, or assets: Immediate.
Sources
- 1PCP ACM obres vdef-002.pdf — “Marc El termini de durada de l'Acord Marc és el que s'estableix en l'apartat G.1 del quadre de característiques. Aquest termini començarà a comptar a partir de l'endemà de la data de la publicació en el Perfil del contra…”
- 2Contracte tipus.pdf — “documents contractuals de l'Acord Marc i, dita publicació, es produirà desprès de la signatura del darrer document contractual. 3.2 Un cop finalitzat el termini inicial de vigència del contracte, aquest podrà prorrogar-s…”
- 3PPT_AM_Obres_vdef_signed.pdf — “el sublot d'obra s'afegirà la fita de redacció i lliurament del projecte executiu La reducció de termini oferta pels licitadors com a criteri d'adjudicació s'aplicarà sobre el termini màxim d'execució establert per a cad…”
The core scope of work for this tender involves a set of actions for the adequacy, adaptation, expansion, improvement, or reinforcement of existing dependencies or installations. This includes conditioning works for potential new dependencies/installations or modernization of existing ones, as well as actions related to utility connections (gas, water, electricity) to meet current supply requirements. The contract modality entails integrated responsibility for the project, from conception and drafting to execution, legalization, and delivery of fully operational works with all installations functioning and corresponding technical documentation. The execution of work includes organizing resources, meeting deadlines, ensuring safety and quality, and resolving incidents.
The Statement of Work (SOW) is summarized by its division into two main lots, along with associated complementary services:
- Lot 1: Self-consumption photovoltaic solar installations. This includes detailed planning of the execution of works for photovoltaic installations, covering phases such as previous actions, staking out, supply of equipment and materials, site adaptation, assembly of support structures, installation of modules, cabling, inverters, electrical panels, protections, monitoring systems, connection to existing installations, testing, legalization, commissioning, and final delivery. Specific products under this lot include various low and medium voltage photovoltaic installations and pergolas.
- Lot 2: Electric recharging infrastructure installations. This encompasses the definition and execution of tasks for low voltage (BT) and medium voltage (MT) generic charging infrastructure hubs, as well as reforms or adaptations of existing charging hubs. It also includes network extension works from the connection point to the supply point, project drafting, and processing with affected official organisms.
Complementary services for both lots include managing the supply/connection point, administrative processing of permits from competent organisms, legalization of installations, grid connection, commissioning, and other services necessary to ensure the installation's operation.
Sources
- 1PPT_AM_Obres_vdef_signed.pdf — “a la direcció i realització dels treballs contractats. S'entén per obres el conjunt d'actuacions d'adequació, adaptació, d'ampliació, millora, o reforç de dependències o instal·lacions existents, incloent treballs de con…”
- 2MJ_AM_Obres_vdef_signed.pdf — “següents actuacions: L'abast de les prestacions podrà comprendre l'execució de les obres i prestacions vinculades o bé aquestes conjuntament amb la redacció del projecte previ a les obres. Així mateix, també s'inclouen d…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 11 FILES
- Annex 8A - Sublots 1.1 i 1.3.docx76 KBDOCX
- MJ_AM_Obres_vdef_signed.pdf680 KBPDF
- PCP ACM obres vdef-002.pdf2.3 MBPDF
and 4 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.