Published

    Energetické úspory metodou EPC ve vybraných objektech Statutárního města Opava

    Notice number: 00546565-2026

    🇨🇿 CzechiaStatutární město OpavaServices

    KEY INFORMATION

    Submission deadline
    Sep 7, 2026
    Location
    🇨🇿 Czechia
    Contracting authority
    Statutární město Opava
    Accepted Languages
    Czech
    Tender type
    Services
    Contract Value
    Published date
    Aug 6, 2026

    TENDER DESCRIPTION

    This tender seeks a contractor for the provision of energy services with a guaranteed outcome using the Energy Performance Contracting (EPC) method, focusing on the reconstruction of the central heating/cooling (UT/CHL) source at the "BK Hala Opava" facility. The scope encompasses detailed works including the reconstruction of the UT/CHL engine room, drilling shafts, and the installation of advanced technologies such as high-temperature, air/water, and earth/water heat pumps (e.g., 64 kW, 73 kW, 78 kW), alongside comprehensive electrical, measurement, and control system modifications, ensuring adherence to specified cable types and safety standards like ČSN 13 0072 for pipe labeling, with all operating device labels required in Czech. The contract is structured into three phases: an initial 90-day phase, a subsequent 730-day implementation phase, and a 10-year guarantee provision phase, culminating in an overall contract fulfillment period expected to conclude within 10 years from the start of the guarantee period, with an anticipated contract signing in April 2027. Financially, bidders must provide a bid security of 500,000.00 Kč and demonstrate a sound financial standing, free…

    TENDER BRIEF

    The contract timeline is divided into three phases with an anticipated contract signing date in April 2027.

    Phases:

    • Phase I: Starts immediately upon the contract's effectiveness and is expected to be completed within 90 days thereafter.
    • Phase II: Begins after the completion of Phase I. It is to be completed within 730 days from the date the building permit becomes legally effective (if applicable) or from the start of Phase II.
    • Phase III (Guarantee Provision): Commences after the completion of Phase II and involves a guarantee period of 10 years from the end of Phase II.

    Total Duration: The entire fulfillment of the contract is expected to conclude within 10 years from the start of the guarantee period (Phase III).

    The commencement date for the contract's fulfillment is contingent on the conclusion of the tender procedure, and the estimated dates are subject to adjustment. A detailed schedule will be part of the preliminary offer and the final contract.

    Sources

    • 100 Zadavaci dokumentace.pdf — “předpokládané hodnoty vyhrazeného dodatečného plnění dle § 100 a 66 ZZVZ (15%) po dobu trvání předmětu plnění, zadavatel se rozhodl její výši nezveřejnit. 6 DOBA A MÍSTO PLNĚNÍ, PROHLÍDKA MÍSTA PLNĚNÍ VEŘEJNÉ ZAKÁZKY 6.1…

    The core scope of work for this tender involves the "reconstruction of the UT/CHL source" for the "BK Hala Opava" facility. This project is broken down into several key areas.

    The Statement of Work (SOW) summary includes the following core deliverables and activities:

    • Reconstruction of the UT/CHL source at BK Hala Opava.
    • PS 01 - Drill Shafts (Šachty vrtů) which covers the work related to drilling shafts.
    • D.1.2.4a UT/CHL Engine Room (TPS UT - Strojovna UT/CHL), focusing on the engine room.
    • PS 02.02 - Technology - UT/CH Engine Room equipment (Technologie - zařízení strojovny UT/CH), encompassing the technological equipment for the engine room.
    • PS 02.03 - Electrical and MaR - UT/CH Engine Room equipment (Elektro a MaR - zařízení strojovny UT/CH), covering electrical and measurement and control equipment for the engine room.

    Specific tasks detailed in the list of works include:

    • Thermal insulation.
    • Works related to central heating, including engine rooms, distribution piping, and fittings.
    • Locksmith constructions.
    • Finishing works, specifically painting.
    • Sanitary technology, including internal sewerage, internal water supply, and mechanical equipment.
    • Works related to central heating boiler rooms.
    • Hourly accounting rates.
    • Ancillary budget costs (VRN) which cover:
    • Exploratory, geodetic, and design works (VRN1).
    • Site equipment (VRN3).
    • Engineering activities (VRN4).
    • Other personnel costs (VRN8).
    • Other costs (VRN9).

    Sources

    • 1OP-PS-03 - BK Hala Opava - rekonstrukce zdroje UT-CHL - D.1.2 [zadání].xlsx — “- nátěry,,,,,,0,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,HZS - Hodinové zúčtovací sazby,,,,,,0,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,VRN - Vedlejší rozpočtové náklady,,,,,,0,,,,,,,,,,…
    • 2OP-PS-01 - BK Hala Opava - rekonstrukce zdroje UT-CHL - rozpočet [zadání].xlsx — “podpis:,,Razítko,Datum a podpis:,,,Razítko,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 209 FILES

    • MMO - Krnovská 71A.pdf
    • Byty.pdf
    • D.2.3.03 - Dispozice - nový stav.pdf

    and 202 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders