Published
1.1 - Obres import inferior 500.000 €
Notice number: 00530849-2026
KEY INFORMATION
- Submission deadline
- • Sep 30, 2026
- Location
- 🇪🇸 Spain
- Contracting authority
- Energies Renovables Públiques de Catalunya, SAU
- Accepted Languages
- CAT
- Tender type
- Works
- Contract Value
- Published date
- Jul 31, 2026
TENDER DESCRIPTION
This tender is for the execution of works on photovoltaic self-consumption installations, with individual projects not exceeding €500,000, covering the complete lifecycle from project drafting and execution to full legalization and commissioning of operational facilities. The scope necessitates comprehensive responsibility, including managing utility connections, obtaining all required permits from official bodies, and delivering "As Built" documentation. Contractors must ensure compliance with rigorous technical specifications, including certified metrological meters (MID or equivalent), UNE and IEC standards, CE marking, secure protocols (TLS 1.2+), robust authentication, and adherence to various regulatory frameworks such as GDPR, NIS2, and the National Security Scheme. Financial eligibility requires a minimum annual turnover of €750,000 from the best of the last three available financial years, or accreditation through business classification "1-09 INSTALACIONES ELÉCTRICAS INSTALACIONES ELÉCTRICAS SIN CUALIFICACIÓN ESPECÍFICA (categoria 3 o superior)". The overarching Framework Agreement has a maximum total duration of four years, including extensions, while individual…
TENDER BRIEF
The contract timeline details are as follows:
The start date for the Framework Agreement will be the day after the publication of the formalization of the contractual documents in L'Energètica's Contractor Profile, which will occur after the signing of the last contractual document.
The initial duration of the Framework Agreement is not explicitly stated as a fixed period (e.g., 2 years) but is subject to extensions.
The Framework Agreement can be extended for a maximum of 3 years. The total duration of the Framework Agreement, including any extensions, cannot exceed four years. Once the initial term and any extensions are completed, further extensions are generally not possible, with an exception allowing for a maximum of 9 additional months as per Article 29.4, fifth paragraph of Law 9/2017.
The duration of individual contracts based on the Framework Agreement is independent of the Framework Agreement's duration and will be governed by Article 29 of the LCSP. These individual contracts can last at most until December 31st of the year in which the Framework Agreement's validity ends (including its initial period and any extensions). The specific execution terms for these individual contracts cannot be precisely determined at the time of tendering the Framework Agreement, as they will depend on the characteristics of each action and the corresponding executive project, which will define the scope, technical complexity, execution conditions, and required schedule.
Key Milestones and Phases for General Execution:
- Execution of low voltage works: Starts with a site visit, with a maximum term of 8 calendar weeks until the material completion of the works.
- Legalization of the installation: Starts upon the material completion of the works, with a maximum term of 3 calendar weeks until the presentation of all legalization documentation.
- Commissioning and service: Starts upon the acceptance or validation of the legalization documentation, with a maximum term of 3 calendar weeks until functional tests are performed and the service is put into operation.
- Drafting and delivery of the executive project: Starts upon the reception of the order and necessary documentation, with a maximum term of 6 calendar weeks until the delivery of the complete executive project.
Key Milestones and Phases for Lot 1: Self-consumption photovoltaic installations:
- Initial launch visit: Maximum 15 calendar days from the formalization of the based contract or from the availability of necessary information until the signing of the launch act.
- Presentation of detailed planning: Maximum 15 calendar days from the launch act until the delivery of detailed planning.
- Presentation of corrections or amendments: Maximum 15 calendar days from the receipt of observations from L'Energètica.
- Works site visit: Maximum 15 calendar days from the formalization of the based contract or the delivery of the executive project until the signing of the works site visit act.
- Delivery of "As Built" documentation: Maximum 15 calendar days from the legalization or commissioning of the installation until final delivery.
Maximum Response Times during work execution:
- Presentation of a resolution proposal for incidents affecting work execution: 7 calendar days.
- Communication of incidents that may affect deadlines, costs, quality: Immediate, in any case 1 calendar day from their detection.
- Action regarding incidents that pose a risk to people, facilities, or assets: Immediate.
Sources
- 1PCP ACM obres vdef-002.pdf — “quadre de característiques es fa referència, si escau, a la normativa específica aplicable i vinculada a l'objecte de l'Acord Marc. Setena. Dades econòmiques del contracte i existència de crèdit 7.1 El valor estimat del…”
- 2Contracte tipus.pdf — “documents contractuals de l'Acord Marc i, dita publicació, es produirà desprès de la signatura del darrer document contractual. 3.2 Un cop finalitzat el termini inicial de vigència del contracte, aquest podrà prorrogar-s…”
- 3PPT_AM_Obres_vdef_signed.pdf — “de cada actuació es concretaran en la corresponent contractació basada, atenent la tipologia, dimensió, complexitat tècnica i configuració de les actuacions contractades. En concret, el termini específic dels contractes…”
The core scope of work for this tender, an "Acord Marc per a la contractació d’obres i prestacions complementàries vinculades a projectes de Generació" (Framework Agreement for the contracting of works and complementary services linked to generation projects), includes:
- Execution of Works: This involves the adaptation, expansion, improvement, or reinforcement of existing facilities or the conditioning, creation, or modernization of new or existing dependencies and installations. It covers all necessary works, including utility connections (gas, water, electricity) to meet current supply requirements.
- Comprehensive Project Responsibility: From the initial concept and drafting to the complete execution, legalization, and delivery of fully operational works with all facilities functioning and the required technical documentation.
- Material Execution: This encompasses organizing technical and human resources, adhering to deadlines, ensuring safety and quality, and resolving any issues during the project.
- Project and Work Execution: The scope can involve either just the execution of works or the combined drafting of a project followed by its execution.
- Complementary Services: These include the management of the supply point, processing of all necessary permits for work execution, legalization of installations, commissioning, and any other services required to ensure the installation's functionality.
- Specialized Activities: This covers medium voltage operations, reforms of existing Hubs, and unique low voltage installations that are not classified as standard products.
- Permit Management: Specifically, for sublots 2 and 4, this involves the preparation of documentation, tracking, and obtaining resolutions for permits from official bodies (e.g., Agència Catalana de l’Aigua - ACA, Confederación Hidrogràfica del Ebro - CHE, City Councils, Coastal Authorities, Roads, Ports), as well as managing any additional requirements from these organisms. The contractor is responsible for all required authorizations, communications, and licenses.
- Division into Lots: The contract is divided into two main lots: Lot 1 for Solar Photovoltaic Self-Consumption Installations and Lot 2 for Electric Charging Infrastructure Installations.
Sources
- 1PPT_AM_Obres_vdef_signed.pdf — “base per a la direcció i realització dels treballs contractats. S’entén per obres el conjunt d'actuacions d’adequació, adaptació, d'ampliació, millora, o reforç de dependències o instal·lacions existents, incloent trebal…”
- 2MJ_AM_Obres_vdef_signed.pdf — “sublot corresponent, s'inclouen les següents actuacions: L'abast de les prestacions podrà comprendre l'execució de les obres i prestacions vinculades o bé aquestes conjuntament amb la redacció del projecte previ a les ob…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 11 FILES
- PCP ACM obres vdef-002.pdf2.3 MBPDF
- PPT_AM_Obres_vdef_signed.pdf479 KBPDF
- DEUC.xml150 KBXML
and 4 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.