Erweiterung GS Stickgras - PV-Anlage
Notice number: 00589327-2026
KEY INFORMATION
- Submission deadline
- • Oct 1, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Stadt Delmenhorst
- Accepted Languages
- German
- Tender type
- Works
- Contract Value
- Published date
- Aug 26, 2026
TENDER DESCRIPTION
This tender seeks bids for the comprehensive execution and installation of a photovoltaic (PV) system, including a battery storage system, for the extension building of the Stickgras Primary School, encompassing all associated documentation, planning, testing, and expert acceptance tests in accordance with DIN 18382. The project requires strict adherence to valid DIN-VDE-Normen, technical specifications for connection points, overvoltage protection (SPD Type 1-3), and fire protection regulations, mandating non-combustible materials and tested penetrations. Key technical requirements specify a TNS network (400/230 V, 50 Hz, 40 kA short-circuit current), a high-voltage inverter-compatible Battery Management System, and an SMA - Energiemanager for integrated power measurement, forecast-based consumption control, and monitoring via an ISO/IEC 27001 certified portal located in Germany, adhering to stringent measurement accuracy standards and maximum immission noise levels. All digital documents must be exchanged via a client-designated platform in specified formats, with Montage- und Werkplanung according to VDI 6026. Contractors must provide proof of financial standing, including…
TENDER BRIEF
The contract timeline is as follows:
- Contract Start Date (Execution of Services): February 19, 2027
- Contract End Date (Completion of Services): September 19, 2027
- Maintenance Contract Duration: 4 years, starting the day after the acceptance of the construction work.
- Key Milestones/Phases: The maintenance contract includes four annual maintenance services.
Sources
- 1214 Besondere Vertragsbestimmungen FB 6_199-2026.pdf — “214 (Besondere Vertragsbedingungen) Delme Delmenhorst verbindet Vergabenummer 199-2026 Baumaßnahme Erweiterung Grundschule Stickgras Leistung PV-Anlage BESONDERE VERTRAGSBEDINGUNGEN 1 Ausführungsfristen (§ 5 VOB/B) 1.1 1…”
- 201_Wartungsvertrag_PV-Anlage.pdf — “und Leistungsänderungen 8.1 8.2 Die Laufzeit des Vertrages beginnt 19 ☐ ☑ am an dem der Abnahme der Bauleistung folgenden Tag und beträgt 4 Jahre. ☐ Eine Verlängerung der Laufzeit des Vertrages jeweils um ein weiteres Ja…”
- 3FB 223_ GS Stickgras-PV Anlage.pdf — “| St | | | | 2.0030. | Sachverständigenabnah men | 1,000 | St | | | | 3.0010. | Wartungskosten für die 1 Wartung PV- Anlage.. | 1,000 | St | | | | 3.0020. | Wartungskosten für die 2 Wartung PV- Anlage... | 1,000 | St | |…”
- 4260817_ GS Stickgras _PV Anlage nach DIN 18382-Langtexte ohne Preis.pdf — “- Module & Strings dokumentiert: Typ, Seriennummer, Ausrichtung, Neigungswinkel, String - Zuordnung 19. Wechselrichter & DC/AC - Verbindungen dokumentiert: Anschlussbelegung, Leitungskennzeichnung, Betriebsgrenzen 20. Be…”
- Adherence to technical requirements for connection points, including voltage, current, short-circuit resistance, and protection classes.
- Compliance with valid DIN-VDE-Normen.
- Foundational use of execution and circuit diagrams.
- Adherence to all connection values (voltage, current, protection class, fusing) of PV components.
- Submission of manufacturer documentation.
- Provision of interfaces for communication and monitoring.
- Compliance with protection levels for overvoltage protection measures according to DIN VDE 0100-443/-534.
- Use of SPD Type 1-3 for overvoltage protection.
- Specification of cable and line types, including cross-sections, installation methods, mounting systems, and minimum distances.
- Adherence to fire protection regulations and project-specific fire protection concepts, including the mandatory use of non-combustible materials and tested penetrations, and the avoidance of spark-over.
- Network form TNS with 400/230 V and 50 Hz.
- Short-circuit current of 40 kA.
- Use of suitable damping for vibration-prone devices (inverters, fans, storage units).
- Adaptation of load-bearing capacity, fastening types, and drilling procedures to the mounting surface.
- A Battery Management System (BMS) compatible with high-voltage inverters.
- SMA - Energiemanager with integrated power measurement (1-3 phase, bidirectional) for indoor installation.
- Automatic forecast-based consumer control for self-consumption optimization via SMA - Energiemanager.
- Forecast-based individual action recommendations from SMA - Energiemanager.
- Connection to the local network via Ethernet interface for the monitoring portal (SMA - Energiemanager).
- Monitoring Portal certified according to ISO/IEC 27001, with server location in Germany (for SMA - Energiemanager).
- Measurement accuracy for SMA Energiemanager: IEC 61557-12 for integrated measurement device.
- Voltage measurement accuracy for SMA Energiemanager: ±0.5%.
- Current measurement accuracy for SMA Energiemanager: ±0.5%.
- Active power measurement accuracy: ±1.0%.
- Reactive power measurement accuracy: ±1.0%.
- Power factor measurement accuracy: ±1.0%.
- Maximum immission noise levels: 60dB (day, 7 am to 8 pm) / 45dB (night, 8 pm to 7 am), measured 50 cm in front of the open window of adjacent buildings.
- Use of a client-designated platform for digital data exchange.
- Plans to be delivered in PDF and DWG/DXF formats.
- Documents to be delivered in PDF/A format.
- Tables to be delivered in Excel or CSV format.
- Montage- und Werkplanung (assembly and workshop planning) to be carried out according to VDI 6026.
- Performance of tests that go beyond or deviate from DIN, VDE, or IEC norms.
- Measurements (e.g., DC voltage, power, energy flow) to be carried out in accordance with norms, using calibrated measuring devices.
Sources
- 1260817_ GS Stickgras _PV Anlage nach DIN 18382-Langtexte ohne Preis.pdf — “EUR | 2.0.2.7 Anschlussstellen und Anschlussbedingungender Netze und | | anlagen: Die Anschlussstellen legen fest, wo elektrotechnische Anlagen an das bestehende Versorgungsnetz oder andere Systeme angeschlossen werden d…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 24 FILES
- 214 Besondere Vertragsbestimmungen FB 6_199-2026.pdf115 KBPDF
- 211_EU_199-2026.pdf26 KBPDF
- Information e-Rechnung_199-2026.pdf9 KBPDF
and 17 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.