Published

    Erweiterung und Sanierung der Grund- und Mittelschule in Riedenburg - Architekt

    Notice number: ocds-mnwr74-9b613480-3edc-45b6-b39e-31e353fde36b

    🇩🇪 GermanyStadt RiedenburgServices

    KEY INFORMATION

    Submission deadline
    Sep 21, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Stadt Riedenburg
    Accepted Languages
    DEU
    Tender type
    Services
    Contract Value
    Published date
    Aug 18, 2026

    TENDER DESCRIPTION

    This tender seeks architectural services for the comprehensive extension and refurbishment of the primary and middle school in Riedenburg, encompassing planning services according to HOAI § 33, Annex 10, covering service phases 1-9. The scope includes basic evaluation, preliminary design, approval-ready design planning, cost management, coordination with other technical parties, tender preparation, award, and documentation, with a critical first construction phase for full-day care facilities mandated for completion by the start of the 2029/2030 school year. Key technical requirements include compliance with building regulations and accepted rules of technology, Legionella prevention, and the integration of specific sanitary fittings such as single-lever mixer taps with longer levers, touchless faucets, and temperature limiters, alongside methodologies like participative consulting and pedagogical architecture. Bidders must demonstrate financial standing through professional liability insurance with minimum coverage of €3.0 million for personal damages and €1.5 million for other damages, with the coverage sum available twice per year. A detailed time and workflow schedule for…

    TENDER BRIEF

    The contract timeline includes several key milestones and phases. Immediately after the contract is concluded, either the client or the contractor, in coordination with their contract partner, will prepare a time and workflow schedule for planning, awarding, and execution.

    The contractor's services must ensure that the following client-specified dates can be met: "Baubeginn" (start of construction), "Fertigstellungstermin" (completion date), and "Nutzungsbeginn" (start of use). However, no specific dates are provided for these items in the document.

    The project involves planning services according to HOAI § 33 in conjunction with Annex 10, covering "Leistungsphasen" (service phases) 1-9. Specifically, the contract outlines services to be transferred in stages:

    • Stufe 1: "Grundlagenermittlung und Vorplanung" (basic evaluation and preliminary planning).
    • Stufe 2: "Entwurfsplanung und Genehmigungsplanung" (design planning and approval planning).

    "Leistungsphase 9" includes the "Überwachung der Mängelbeseitigung innerhalb der Gewährleistungsfrist" (monitoring of defect rectification within the warranty period).

    The document does not explicitly state a contract start date, end date, or total duration with specific dates.

    Sources

    • 13943776.pdf — “§ 5.1 erarbeitet ☐ ☑ der Auftraggeber oder der von ihm beauftragte Dritte der Auftragnehmer in Abstimmung mit seinem Vertragspartner unverzüglich nach Vertragsschluss einen Zeit- und Ablaufplan betreffend Planung, Vergab…
    • 23943774.pdf — “pauschal Mitwirken bei der Beschaffung und Abrechnung von Fördermitteln in € (netto) pauschal bei der Erstellung des Verwendungsnachweises in € (netto) pauschal Überwachung der Mängelbeseitigung innerhalb der Gewährleist…

    The core scope of work for this tender involves several planning and coordination phases. These include:

    • Grundlagenermittlung (Basic Evaluation): This phase focuses on clarifying all planning and organizational framework conditions for a proper solution to the overall task. Key activities include clarifying the task definition, conducting on-site inspections, advising on performance and investigation requirements, formulating decision aids for selecting other planning participants, and summarizing, explaining, and documenting the results.
    • Vorplanung (Pre-planning/Preliminary Design): This involves developing the preliminary design and roughly estimating the total costs. Activities include analyzing and coordinating the foundations, aligning objectives and identifying conflicts, developing preliminary designs, investigating, presenting, and evaluating alternatives, clarifying and explaining essential contexts and conditions (urban planning, design, functional, technical, economic, ecological, social, public law aspects), providing work results, and coordinating and integrating services from others. This phase also includes creating a cost estimate based on DIN 276:2018-12 and comparing it with financial frameworks, as well as preparing a timeline for planning and construction.
    • Entwurfsplanung (Design Planning): This phase aims to develop an approval-ready, technically and economically appropriate design and calculate the total costs. Tasks include preparing the design planning, providing work results, coordinating and integrating services from others, creating an object description, conducting negotiations regarding approval feasibility, and preparing a cost calculation.
    • Cost Management and Control: Throughout the process, there's an emphasis on cost estimation, calculation, and control. This includes determining overall costs based on priced service specifications, cost control through comparison of priced service specifications with cost calculations, and explaining changes and proposing control measures. Further cost control is performed after the first significant tendering round, comparing actual costs with the budget and explaining deviations.
    • Coordination and Integration: A significant part of the work involves coordinating interfaces with other technically involved parties in the planning to avoid contradictions, overlaps, and incompleteness. This also includes providing work results as a basis for other planning participants and integrating their contributions.
    • Tender Preparation and Award: This includes compiling tender documents for all service areas, conducting discussions with bidders to clarify bid content, creating award proposals and award notices, and compiling contract documents.
    • Documentation: Summarizing, explaining, and documenting results are recurring deliverables at the end of each planning phase.

    Sources

    • 13943776.pdf — “Aufforderung durch den Auftraggeber bedarf. Er hat sich auch vor Augen zu halten, en, dass aus dem Umgang mit öffentlichen Haushaltsmitteln eine besondere Pflicht zum sparsamen und wirtschaftlichen Handeln folgt. Dieser…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 28 FILES

    • 1508-26-08-05 MS Riedenburg.pdf
    • 24065-201-Untergeschoss.pdf
    • 24065-205-3. Obergeschoss.pdf

    and 21 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders