    Erweiterung und Sanierung der Grund- und Mittelschule in Riedenburg - Tragwerk

    Notice number: 00569436-2026

    🇩🇪 GermanyStadt RiedenburgServices

    KEY INFORMATION

    Submission deadline
    Sep 21, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Stadt Riedenburg
    Accepted Languages
    German
    Tender type
    Services
    Contract Value
    Published date
    Aug 18, 2026

    TENDER DESCRIPTION

    This tender seeks professional planning services for structural engineering (Tragwerksplanung) for the comprehensive extension and renovation of the Elementary and Middle School in Riedenburg, encompassing phases 1 through 6 of the HOAI (German Fee Schedule for Architects and Engineers), with further stages up to object supervision. The scope involves basic evaluation, preliminary planning, and design planning to develop an approval-ready, constructively and economically sound structural solution, integrating with specialist planning for a multi-phase project. A critical timeline constraint requires the completion and usability of rooms for all-day care facilities by the start of the 2029/2030 school year to meet legal entitlements, while overall construction, completion, and usage dates will be specified by the client. Bidders must demonstrate financial stability through professional liability insurance with a minimum coverage of €2.0 million for personal injuries and €1.0 million for other damages, and an average annual net turnover of at least €250,000 for comparable services over the last three years.

    TENDER BRIEF

    The contract timeline explicitly mentions several key phases, referred to as "Leistungsphasen" (Service Phases), and specific deadlines that are to be provided by the client. However, no concrete contract start date, end date, or total duration is stated within the documents.

    The explicitly mentioned phases and deadlines are:

    • Baubeginn (Start of construction): To be specified by the client ("Vorgabe AG").
    • Fertigstellungstermin (Completion date): To be specified by the client ("Vorgabe AG").
    • Nutzungsbeginn (Start of use): To be specified by the client ("Vorgabe AG").

    Immediately after the contract is concluded, the client or a commissioned third party will develop a time and schedule plan for planning, awarding, and execution. This plan will be reviewed and updated regularly in coordination with the contractor.

    The contract outlines the following service phases:

    • Zielfindungsphase (Goal setting phase)
    • Leistungsphase 1 (Grundlagenermittlung - Basic evaluation)
    • Leistungsphase 2 (Vorplanung - Preliminary planning)
    • Leistungsphase 3 (Entwurfsplanung - Design planning)
    • Leistungsphase 4 (Genehmigungsplanung - Approval planning), which includes the creation of evidence for constructive fire protection.
    • Leistungsphase 5 (Ausführungsplanung - Implementation planning)
    • Leistungsphase 6 (Vorbereitung der Vergabe - Preparation for awarding)
    • Leistungsphase 7 (Mitwirkung bei der Vergabe - Assistance in awarding), which includes assisting in the examination and evaluation of offers (both with performance descriptions and programs, and alternative offers).
    • Leistungsphase 8 (Ingenieurtechnische Kontrolle nach § 7 der ZVB-Trag Fassung 2019 / Ingenieurtechnische Kontrolle nach Nr. 7 der ZVB-Trag (Fassung 2024) - Engineering technical control).

    Some phases are also referred to as "Stufen" (stages) for further services:

    • Stufe 2: Entwurfsplanung und Genehmigungsplanung.
    • Stufe 3: Ausführungsplanung, Vorbereitung der Vergabe und Mitwirkung bei der Vergabe.
    • Stufe 4: Objektüberwachung.

    Sources

    • 13943803.pdf — “des Personals durch geeignete Fachleute verlangen, wenn die eingesetzten Mitarbeiter nicht in ausreichendem Maße eine rechtzeitige Planung oder einen störungsfreien Bauablauf gewährleisten. §5 Termine und Fristen Der Auf…

    The core scope of work for this tender involves "Planungsleistungen nach § 49 ff HOAI in Verbindung mit Anlage 14 HOAI, Tragwerksplanung, LPH 1-6", which translates to planning services for structural engineering, encompassing phases 1 to 6 of the HOAI (German Fee Schedule for Architects and Engineers).

    Specifically, the initial phases of the Statement of Work include:

    1. Grundlagenermittlung (Basic evaluation): This phase involves clarifying the task based on the client's specifications, compiling planning intentions that influence the project, advising the client on necessary special services (e.g., substance investigations for renovations), and finally summarizing, explaining, and documenting the results in a clear, written form to provide a comprehensive overview of the project's foundations.

    2. Vorplanung (Preliminary planning / Project and planning preparation): This phase focuses on assisting in the development of a planning concept in its essential parts and participating in the approximate determination of total costs. Key activities include analyzing the foundations identified in phase 1 and those provided by the client, coordinating services with other planning specialists, providing static-constructive advice to the object planner and client (considering structural integrity, usability, and economic efficiency), and summarizing, explaining, and documenting the results of the preliminary planning in a structured written report.

    3. Entwurfsplanung (Design planning / System and integration planning): This involves developing an approval-ready, constructively and economically appropriate structural solution. Tasks include working out the structural solution while considering integrated specialist planning, performing approximate static calculations and dimensioning, defining fundamental constructive details and main dimensions of the structure (e.g., grid dimensions, column/wall/slab dimensions, joint details), estimating quantities (e.g., rebar, steel, timber), and contributing to the object description concerning the structure.

    The overall project for these services is the "Erweiterung und Sanierung der Grund- und Mittelschule in Riedenburg" (Expansion and renovation of the primary and secondary school in Riedenburg). The work also entails agreeing on planning and supervision goals related to quantities, qualities, design, functional, technical, and economic aspects, with a binding cost ceiling for the overall construction measure. The implementation is intended to be carried out in one go.

    Sources

    • 1Beiblatt B.xlsx — “Verbindung mit Anlage 14 HOAI, Tragwerksplanung, LPH 1-6",,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, Auswertungsergebnis Teilnahmewettbewerb,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,Hinweise,Bsp.,1…
    • 23943803.pdf — “Arbeiten gegeben hat. Die Billigung von Planungsergebnissen stellt keine Teilabnahme dar. Der Auftragnehmer schuldet Folgendes: 1. Grundlagenermittlung 1.1 Verantwortliches Klären der Aufgabenstellung aufgrund der Vorgab…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 28 FILES

    • 24065-105-Bestand Ansichten.pdf
    • Beiblatt B.xlsx
    • Beiblatt D.docx

    and 21 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders