Published

    Étude de faisabilite, dimensionnement par simulation thermique dynamique et assistance a maitrise d'ouvrage - realisation d'installations de production de froid haute efficacite energetique sur les trois sites du chu de guyane

    Notice number: 00536883-2026

    🇫🇷 FranceCentre Hospitalier de Cayenne "Andrée ROSEMON"Services

    KEY INFORMATION

    Submission deadline
    Sep 15, 2026
    Location
    🇫🇷 France
    Contracting authority
    Centre Hospitalier de Cayenne "Andrée ROSEMON"
    Accepted Languages
    French
    Tender type
    Services
    Contract Value
    Published date
    Aug 3, 2026

    TENDER DESCRIPTION

    This tender seeks comprehensive services for the feasibility study, dynamic thermal simulation, and project management assistance for the implementation of high energy efficiency cold production installations across three sites of the Guyana University Hospital Center. The 42-month project encompasses seven phases, starting with an instrumented audit of existing air conditioning, followed by a global building assessment, dynamic thermal simulation for needs modeling, optimization and renewal project design, economic analysis, and culminates in project management assistance for works consultation and execution, and a 24-month post-commissioning monitoring phase. Key technical requirements include dynamic calculation methodology at an hourly step of 8760h, the use of refrigerant fluids with a Global Warming Potential (GWP) less than 750, and certified Eurovent performance with SEER ≥ 5 for chilled water and SEER ≥ 7 for direct expansion, with deliverables in specified open and PDF formats. Contractors must demonstrate financial standing through global and contract-specific turnover declarations, professional risk insurance, and decennial liability coverage, with services paid on a…

    TENDER BRIEF

    The contract has a total duration of 42 months. The execution of services commences on the date specified by a service order.

    The timeline is divided into several key phases:

    • Phases 1 to 5 (Study Phases): These phases are estimated to last 18 months.
    • Phase 1: Instrumented audit of the existing air conditioning installation across three sites, involving a measurement campaign lasting 2 to 3 months per site.
    • Phase 2: Global inventory of the building and the share of air conditioning in the energy balance.
    • Phase 3: Modeling using dynamic thermal simulation on an hourly basis and construction of the power monotone, per site.
    • Phase 4: Optimization and renewal project, including machine selection, sizing, and optimization of distribution, condensation, emission, and regulation components.
    • Phase 5: Comparative economic analysis and compilation of the financing file.
    • Phase 6 (Assistance to Project Management for Works): This phase is correlated with the works schedule and involves assistance during the consultation and realization of works, including drafting the DCE works, analyzing offers, monitoring execution, tests, and reception.
    • Phase 7 (Post-Commissioning Follow-up): This phase will last a minimum of 24 months and includes consolidated energy balance over the first twelve consecutive months.

    Key milestones include:

    • A launch meeting to be held within fifteen days following the notification of the market.
    • The contractor must submit a detailed provisional calendar, integrating validation milestones by the contracting authority and meetings with funders, within fifteen days following the notification of the market.
    • Steering committees will take place at the end of each of phases 1 to 5, and during the main milestones of phase 6 (DCE, attribution, commissioning, reception).

    Sources

    • 1CCAP.pdf — “physiques à l'égard du traitement des données à caractère personnel (RGPD). Pour l'application de ces dispositions, il est rappelé que, dans le cadre de leurs relations contractuelles, le pouvoir adjudicateur a la qualit…
    • 2CCTP_CHU_Guyane.pdf — “de la climatisation dans le bilan énergétique ; — Phase 3 — Modélisation par simulation thermique dynamique au pas horaire et construction de la monotone de puissance, par site ; CHU DE GUYANE CCTP — Production de froid…
    • 3AE.doc — “. . . en qualité de : | | membre d'un groupement d'entreprise | | | | sous-traitant | | A . . . . . . . . . . . . . . . . . . . . . . Le . . . . . . . . . . . . . . . . . . . . . . Signature 1 ANNEXE N° 1 : RÉPARTITIONS…

    The core scope of work for this tender encompasses a comprehensive, multi-phase project focused on the optimization and renewal of air conditioning installations, likely within a hospital setting. The project duration is estimated at 42 months.

    The Statement of Work (SOW) includes the following key phases and deliverables:

    • Phase 1: Instrumented Audit of Existing Air Conditioning Installation - This involves a detailed inventory, instrumented measurement campaigns over 2-3 months, performance characterization against manufacturer specifications, and the delivery of an instrumented audit report per site.
    • Phase 2: Global Building Assessment and Air Conditioning Share - This phase includes characterizing the building's thermal properties, analyzing three years of electricity bills, developing a strategic note for energy savings and compliance (e.g., Décret Tertiaire / OPERAT, Décret BACS), and formulating a global action plan for building envelope and systems.
    • Phase 3: Dynamic Thermal Simulation for Needs Modeling - Focused on constructing and calibrating a model for energy requirements.
    • Phase 4: Optimization and Renewal Project - This involves a parametric analysis of existing components, selection of new equipment and operating regimes, dimensioning of new refrigeration production, optimization of distribution, emission, condensation, and regulation components, calculation of anticipated energy gains (EER), and studies on photovoltaic coupling and high-efficiency air circulators.
    • Phase 5: Economic Analysis and Financing File Preparation - This includes a comparative economic analysis of the cost of cold, development of an open calculation file, application of economic indicators, evaluation of operating costs and payback periods, and the constitution of a complete investment aid application file, including preliminary framing meetings with financing bodies.
    • Phase 6: Project Management Assistance for Works Consultation and Execution - Key tasks involve drafting technical documents for the works tender (CCTP, plans, DQE/DPGF), supporting the analysis and award of offers, monitoring works execution, and overseeing tests, commissioning, reception, and training.
    • Phase 7: Instrumentation, Monitoring, and Post-Commissioning Assessment - This final phase includes developing a metering plan, implementing and accepting instrumentation upon commissioning, providing detailed monthly and global energy reports for 24 months, delivering a consolidated energy report with the annual SEER, and a 24-month mission to monitor objectives and results.

    The services are compensated via a global lump-sum price.

    Sources

    • 1CCAP.pdf — “physiques à l'égard du traitement des données à caractère personnel (RGPD). Pour l'application de ces dispositions, il est rappelé que, dans le cadre de leurs relations contractuelles, le pouvoir adjudicateur a la qualit…
    • 2DPGF_production_froid_CHU_Guyane_VF1.xlsx — “équipes de la DTIP : mise à disposition des méthodes et fichiers source, session de restitution finale aux agents techniques du CHU.",forfait,1,,0 SOUS-TOTAL A — HT,,,,,0 B — PHASE 1 — AUDIT INSTRUMENTÉ DE L’INSTALLATION…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 18 FILES

    • Thumbs.db
    • Annexe 4 au RC_Adresse électronique.docx
    • MPI1857805_AAPC.pdf

    and 11 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders