Published
Étude de faisabilite, dimensionnement par simulation thermique dynamique et assistance a maitrise d'ouvrage - realisation d'installations de production de froid haute efficacite energetique sur les trois sites du chu de guyane
Notice number: 26-76902
KEY INFORMATION
- Submission deadline
- • Sep 15, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Centre Hospitalier de Cayenne "Andrée ROSEMON"
- Accepted Languages
- FRA
- Tender type
- Services
- Contract Value
- Published date
- Aug 2, 2026
TENDER DESCRIPTION
This tender seeks comprehensive services for the feasibility study, dynamic thermal simulation-based sizing, and project management assistance for implementing high energy efficiency refrigeration production installations across three sites of the Guyana University Hospital Centre. The scope encompasses a seven-phase project including instrumented audits, global building inventory, dynamic thermal modeling with climate change sensitivity, optimization and renewal project development, economic analysis, funding application support, client assistance for works consultation and execution, and a 24-month post-commissioning monitoring phase with detailed energy assessments. Key technical requirements mandate dynamic hourly calculations, exclusion of simplified sizing methods, a hierarchical approach prioritizing demand management and optimization, use of low GWP refrigerants, Eurovent certified SEER targets (≥5 for chilled water, ≥7 for direct expansion), and the integration of absorption/adsorption machines or potential photovoltaic coupling. The contract has a total duration of 42 months, with the study phases (1-5) spanning 18 months, followed by works assistance and a minimum…
TENDER BRIEF
The contract has a total duration of 42 months. The execution of services begins from the date set by a service order.
The contract is divided into 7 phases:
- Phases 1 to 5 (Studies): These phases have a combined duration of 18 months.
- Phase 1 (Instrumented Audit of existing air conditioning installation): This involves a measurement campaign of 2 to 3 months per site.
- Phase 2 (Overall assessment of the building and analysis of air conditioning's share in the energy balance)
- Phase 3 (Dynamic thermal simulation modeling and power monotone construction)
- Phase 4 (Optimization and renewal project)
- Phase 5 (Comparative economic analysis and financing file)
- Phase 6 (Assistance to contracting authority for consultation and execution of works): The duration of this phase is correlated with the construction schedule. This includes drafting the DCE (Dossier de Consultation des Entreprises) works, analyzing offers, monitoring execution, testing, and reception.
- Phase 7 (Post-commissioning monitoring): This phase has a minimum duration of 24 months and includes a consolidated energy balance over the first twelve consecutive months.
A detailed provisional calendar, including validation milestones by the contracting authority and meetings with funders and relevant authorities, is to be submitted by the contractor within fifteen days following the notification of the contract. Committees are held at the end of each of phases 1 to 5, and at key milestones of phase 6.
Sources
- 1CCAP.pdf — “sécurité conformément à l'article 5.3 du CCAG- PI. Le titulaire doit informer ses sous-traitants des obligations de confidentialité et/ou des mesures de sécurité. Consultation n°: CHU/2026_PI 056 Page 8 sur 21 5-PROTECTI…”
- 2AE.doc — “. . . en qualité de : | | membre d'un groupement d'entreprise | | | | sous-traitant | | A . . . . . . . . . . . . . . . . . . . . . . Le . . . . . . . . . . . . . . . . . . . . . . Signature 1 ANNEXE N° 1 : RÉPARTITIONS…”
- 3CCTP_CHU_Guyane.pdf — “mois minimum, par site); Phase 2 État des lieux global du bâti et analyse de la part de la climatisation dans le bilan énergétique; Phase 3 Modélisation par simulation thermique dynamique au pas horaire et construction d…”
The core scope of work and statement of work for this tender involve a comprehensive project structured into seven distinct phases, focusing on the audit, optimization, and renewal of air conditioning installations, along with subsequent monitoring and financial assistance.
The project begins with Phase 1: Instrumented Audit of Existing Air Conditioning Installation, which includes describing and inventorying current systems, deploying measurement devices, conducting a 2-3 month instrumented measurement campaign, and delivering an audit report detailing real performance against manufacturer specifications.
Phase 2: Global Inventory of Building and Air Conditioning Share focuses on characterizing the building envelope, analyzing three years of electricity bills to identify consumption patterns, and determining the air conditioning's contribution to overall energy use, culminating in a strategic note for energy efficiency and a global action plan.
Phase 3: Modeling of Needs by Dynamic Thermal Simulation (STD) involves constructing and calibrating a dynamic thermal model to establish annual, monthly, and peak hourly energy requirements, along with a sensitivity analysis to climate change.
Following this, Phase 4: Optimization and Renewal Project aims to analyze and optimize all components of the existing installation—production, distribution, condensation, and emission—to correctly redimension needs and improve overall system management, excluding simple machine replacement without broader optimization.
Phase 5: Economic Analysis and Funding Application entails a comparative economic analysis of the cold production cost, evaluation of annual operating expenses and payback periods, and the compilation of a complete application file for investment aid, including administrative, technical, and financial proposals.
Phase 6: Client Assistance for Consultation and Works Execution provides support in drafting technical documents for the works contract (DCE), assisting in the analysis and award of offers, and overseeing the execution of works, including planning, coordination, testing, commissioning, reception, and training.
Finally, Phase 7: Instrumentation, Monitoring and Post-Commissioning Assessment involves elaborating and implementing a metering plan, conducting detailed monthly and consolidated energy assessments over 24 months, and a 24-month mission to monitor objectives and results, including providing the real annual SEER of each installation.
Sources
- 1DPGF_production_froid_CHU_Guyane_VF1.xlsx — “équipes de la DTIP : mise à disposition des méthodes et fichiers source, session de restitution finale aux agents techniques du CHU.",forfait,1,,0 SOUS-TOTAL A — HT,,,,,0 B — PHASE 1 — AUDIT INSTRUMENTÉ DE L’INSTALLATION…”
- 2CCTP_CHU_Guyane.pdf — “livrable non produit ou jugé incomplet par le pouvoir adjudicateur fait l'objet d'une demande de reprise. Phase 1- Audit instrumenté de l'existant Rapport d'audit instrumenté par site (synoptique, calendrier et protocole…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 18 FILES
- RC.pdf218 KBPDF
- Formulaire DC1.doc88 KBDOC
- Annexe 1 au RC _attestation candidat - dites le nous en une fois.docx39 KBDOCX
and 11 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.