    TENDER DESCRIPTION

    This tender seeks a contractor for the thermal rehabilitation of residential blocks A1 and G2, aimed at significantly increasing their energy efficiency through extensive insulation of building envelope elements, replacement of joinery, and modernization of technical systems including new common area electrical installations with LED lighting, 3 kWp on-grid photovoltaic panel systems, and electric radiators. Technical requirements include adherence to ISO 9001, IPX4 protection for smart radiators, compliance with European Directives 2014/30 and 2007/47, and documentation in Romanian, with specific details for radiator and potential stair climbing device technologies. The project has an execution period of a maximum of 12 months from the Works Start Order, followed by a minimum 36-month warranty period, and requires tenderers to demonstrate an average annual turnover of at least 6,500,000 LEI for the last three financial years and access to 825,000 LEI in financial resources.

    TENDER BRIEF

    The contract timeline is as follows:

    • Contract Start Date: The agreement becomes effective upon the date of its signing by the last party.
    • Total Duration:
    • The execution period for the contract is a maximum of 12 months. This duration is calculated from the date specified in the Works Start Order.
    • Following the completion of works, there is a warranty period of at least 36 months (3 years) from the date of the Final Acceptance Report.
    • Key Milestones and Phases:
    • Handover of Site and Works Start Order Issuance: The contracting authority will hand over the site, free of any encumbrances, and issue the Administrative Works Start Order to the Contractor within 5 days of the establishment of the Performance Guarantee.
    • Execution of Works: This phase has a maximum duration of 12 months, starting from the date indicated in the Works Start Order. This period also includes any potential work suspension during cold weather.
    • Warranty Period: A minimum of 36 months from the date of the final acceptance of the works.
    • Intermediate and Final Milestones: These are critical for monitoring progress within the 12-month execution period. Failure to meet an intermediate milestone could result in remediation notices or deductions from the performance guarantee. The contract schedule must detail all activities and sub-activities, their estimated durations, logical sequences, interdependencies, and identify the critical path. It should also include periods for testing, quality assurance, and quality control.

    Sources

    • 1acord contractual _semnat.pdf — “se aplică înlocuirea personalului cheie al Antreprenorului fără respectarea prevederilor subclauzelor $14.3~si/sau$ 14.4: 10.000 lei pe eveniment nerespectarea prevederilor subclauzei 27.2: 5.000 lei pe zi | nerespectare…
    • 2Caiet Sarcini lucrari BL A1 SI G2 19 08 2026 _semnat.pdf — “se regăsește fiecare diagramă/componentă a graficului solicitată. Graficul va fi realizat utilizând software compatibil cu cerințele Autorității Contractante (dacă sunt specificate). 10.5. Grafic estimativ cu termene cri…

    The core scope of work for this tender is the thermal rehabilitation of residential blocks A1 and G2 to increase their energy efficiency.

    The Statement of Work (SOW) summary includes the following main activities and deliverables:

    • Site Handover and Commencement Order: The contractor will receive the site free of encumbrances, and an order to begin the execution of the contract will be issued.
    • Execution of Works: This involves implementing the technical documentation. Specific categories of work mentioned across the documents include:
    • Construction - Architecture and Insulation: This encompasses partition walls, procurement and installation of PVC windows and doors (with thermal and sound insulation, insect screens, and protective film), exterior and interior PVC sills, and complete thermal insulation systems for facades and plinths using mineral wool.
    • Interior Electrical Installations: Includes activities like dismounting and mounting various types of protective tubes and conduits, and installing lightning rods.
    • Equipment Installation: This includes mounting single-phase 3 kW photovoltaic installation kits, lightning rods, and electric radiators (0.5 kW and 0.7 kW).
    • Deviations/Protection of Natural Gas Networks: Involves tasks such as dismounting steel pipes and priming/painting old pipes.
    • Site Organization: Includes works related to the establishment of the construction site, such as providing temporary changing rooms for workers.
    • Landscaping for Environmental Protection and Site Restoration: This covers manual soil mobilization for vegetation, leveling and finishing surfaces, grass seeding, and watering.
    • Relocation/Protection of Utilities: Specifically mentioned for natural gas networks.
    • Technological Probes and Tests.
    • Monitoring Long-Term Performance: This includes surveillance during the warranty period for defect notification.

    Site manager assistance during the execution of works is explicitly stated as *not* being the subject of this particular contract, though obligations and responsibilities for project implementation stages are noted.

    Sources

    • 1Caiet Sarcini lucrari BL A1 SI G2 19 08 2026 _semnat.pdf — “rezultă din această procedură: Tabel nr. 1 Nr. | Activitate | Detaliere activități crt. | | 1. | Predare amplasament liber de orice sarcini şi emitere Ordin de începere a executării contractului | Predare amplasament lib…
    • 28. F1-F6 fara valori G2 si grafic_semnat.pdf — “| | transport: | | | procent material manopera | | utilaj | transport | total Pag 2 Cheltuieli directe: STADIUL FIZIC: INSTALATII ELECTRICE INTERIOARE 0 Recapitulatia: Alte cheltuieli directe: Contributie asiguratorie pe…
    • 38. F1-F6 fara valori bloc A1 si grafic_semnat.pdf — “nu necesita montaj si echipamente de transport 8 4.4 | | 4.5 Dotari 9 | | Active necorporale 4.6 10 | | III CAPITOL TOTAL | | CAPITOL IV | | IV. Probe | | Probe tehnologice si teste 6.2 11 | | TOTAL CAPITOL IV | | TOTAL…
    • 43. PT Instalatii Electrice G2_semnat.pdf — “| EG01F1 | buc Montare paratrăsnet PDA complet echipat | 1 PROIECTANT: OFERTANT: ing, SocOS Bogdan J20/1709/2017 NO FIRE INSTAL PROIECT Deva, Judy Hungar 30635732 NO FIRE INSTAL PROIECT SRL Strada M. Viteazu, Bl.42/10 De…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 20 FILES

    • 3. PT Instalatii Electrice G2_semnat.pdf
    • 5. Proiect Gaz G2_semnat.pdf
    • 4. parte desenata electrice A1_semnat.pdf

    and 13 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders