    TENDER DESCRIPTION

    This tender seeks a contractor for the comprehensive modernization of 14 roads within the localities of Tunari, totaling 7578.00 m, encompassing all works specified in the Technical Project (PT), material procurement, site preparation, acquisition of necessary permits, and ongoing maintenance until final acceptance. The scope requires adherence to current legislation and technical norms, a detailed work execution methodology, a specific quality plan, thorough quality control and testing procedures, and the submission of a Gantt chart outlining all project phases and milestones. The maximum execution period is 36 months, commencing upon receipt of the work commencement order and site handover, followed by a minimum 36-month warranty period from works acceptance. Prospective tenderers must demonstrate a minimum annual turnover of 51,000,000.00 RON for 2023, 2024, and 2025, and maintain a current liquidity ratio greater than 1 for the 2025 financial year.

    TENDER BRIEF

    The contract timeline is defined by several estimated durations and event-based start conditions.

    The estimated duration for the execution of the contract is a maximum of 36 months, as per the Technical Project. The overall duration of the contract is stated as "luni" (months) in the model contract, with the exact number left to be filled in.

    The execution of the contract is set to commence after the performance guarantee is established, the building permit is obtained by the purchaser, and the site is handed over to the contractor free of encumbrances. It will also begin following the issuance of the work commencement order by the contracting authority.

    Key steps leading to the start of works include:

    • The estimated period for the contracting authority to obtain the Building Permit and make it available to the contractor is a maximum of 60 days from the date both parties sign the contract.
    • The contracting authority is obliged to hand over the site within a maximum of 5 working days from the date the Building Permit is obtained or the performance guarantee is established, whichever occurs later.
    • The estimated deadline for issuing the Work Commencement Order is a maximum of 65 days from the date both parties sign the contract (which includes the 60 days for the Building Permit and an additional 5 days for the order issuance).
    • The contractor must begin the works within a maximum of 5 working days from receiving the Work Commencement Order, but not before the Site Handover-Acceptance Protocol is signed.

    The period for executing the works is a maximum of 36 months, starting from the receipt of the work commencement order and the handover of the site.

    There is also a warranty period for the executed works, which must be a minimum of 36 calendar months from the acceptance of the works.

    While specific named milestones or phases are not explicitly provided in the documents, the contractor is required to present a work execution schedule that illustrates the order and timing of activities, highlighting "key points (milestones)" and "essential stages" in the contract's execution.

    Sources

    • 12. Caietul de sarcini general al achizitieis.pdf — “consemnate şi predarea documentelor necesare completării Cărții Tehnice a Construcției în vederea Recepției Finale. 4 Durata contractului Durata estimata pentru realizarea contractului este de maxim 36 luni, conform PT.…
    • 25. Model-contract-lucrari - revizuit cf. ANAP.pdf — “executate, plătibil executantului de către achizitor conform graficului de plăți, este de lei, din care T.V.A. lei. 5. Durata contractului 5.1 Durata prezentului contract este de luni, adică de la..... până la 6. Documen…
    • 3Raspuns_consolidat_Clarificari_Tunari_COMPLETAT BUN.pdf — “și bunei organizări a executării contractului, vă rugăm să clarificați care este termenul asumat de Autoritatea Contractantă pentru obținerea şi punerea la dispoziție a Autorizației de Construire. Vă rugăm să clarificați…
    • 4Sectiunea-I-Instructiuni-catre-ofertanti_v3.pdf — “mentionarea fiecarei activitati si subactivitati, Planificare preliminara si planificare detaliata cu alocare de resurse materiale, echipamente/utilaje si resurse umane pe categorii de lucrari, în corelare cu legislatia…

    The core scope of work for this tender involves the execution of all works identified in the Technical Project (PT), prepared by the Designer and approved according to law, including all related annexes.

    Key deliverables and activities explicitly stated include:

    • Acquisition of all necessary materials, products, machinery, means, and equipment for the execution of works.
    • Provisional activities or works required for site preparation.
    • Obtaining all necessary authorizations, permits, and access from competent authorities for work execution.
    • Transport of materials, machinery, components, and equipment to the site.
    • Execution of all required tests and relevant testing as per construction quality assurance legislation and regulations.
    • Provision of consumables necessary for work execution and testing.
    • Normal and extraordinary maintenance of the works until their acceptance.
    • Detailed description of the works to be executed, the technology to be employed, and the resources to be utilized.
    • Presentation of a Gantt chart detailing the physical planning of activities, including all phases, stages, categories of works, their logical sequence, durations, control points/milestones, and human resource allocation, to ensure adherence to the public procurement contract duration.
    • Development and presentation of a methodology for executing the works, which includes a quality plan adapted to the specific work, a general description of works, the quality system with associated procedures, and a quality control plan for verification and testing during critical execution phases.
    • Detailed technical execution procedures covering all necessary operations for contract execution, specifically adapted to the requirements of the PTE (Technical Execution Project).
    • Activities related to the reception at the completion of works and the final reception upon the expiry of the good execution guarantee period.
    • Management of quantitative or qualitative changes during the execution of works.
    • Identification and presentation of material sources to be used as specified in the Technical Project (PT).
    • Submission of a "Program of Execution of Works" that demonstrates compliance with technical specifications, including a valoric execution schedule as part of the financial offer.

    Sources

    • 12. Caietul de sarcini general al achizitieis.pdf — “a guvernului nr. 98/2017 Legislaţia română în vigoare se aplică pentru toate situațiile care nu se regăsesc în mod expres în Documentația de atribuire. A A Orice alte acte normative in vigoare care reglementeaza achiziti…
    • 2Sectiunea-I-Instructiuni-catre-ofertanti_v3.pdf — “nationale in vigoare prin prezentarea unui Memoriu general care contine toate cerintele si specificatiile tehnice cuprinse în caietul de sarcini si in PT. Memoriul trebuie sa demonstreze corespondenta propunerii tehnice…
    • 3Instructiuni_ofertanti_FisaDate_DF1276674.pdf — “materialele puse in opera, prevazute de legislatia in vigoare, se vor face pe cheltuiala proprie. Ofertantul are obligatia de a face dovada conformitatii propunerii tehnice cu cerintele prevazute in cu cerintele din caie…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 18 FILES

    • 01.Piese scrise drumuri.pdf.p7s
    • pluvial PT.zip.p7s
    • 01.Gura de Varsare _-GV.(1).pdf

    and 11 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders