Published
Extension de la déchetterie de Tavaux (39)
Notice number: 26-71912
KEY INFORMATION
- Submission deadline
- • Sep 18, 2026
- Location
- 🇫🇷 France
- Contracting authority
- SICTOM de la zone de Dole
- Accepted Languages
- French
- Tender type
- Works
- Contract Value
- Published date
- Jul 20, 2026
TENDER DESCRIPTION
This tender outlines the comprehensive extension of the Tavaux (39) waste collection centre, encompassing a broad scope of civil engineering works. The project primarily involves detailed preparatory works, significant earthworks, the establishment of stormwater and dry utility networks, application of various surface coatings, and the construction of reinforced concrete elements including a retaining wall and operational slab. Additionally, the scope extends to fencing, locksmithing, and the development of green spaces, all executed in accordance with established rules of the trade, current norms, and specific DTU and CSTB prescriptions. Bidders are required to adhere to detailed technical specifications for materials such as CPA cement and geomembranes, submit proposals electronically using qualified eIDAS compliant signatures, and provide a 5% retention guarantee, replaceable by a joint and several guarantee. The maximum execution period for the entire project is set at four months, excluding periods of inclement weather, with an anticipated start in mid-October following the issuance of a Service Order within two months of contract notification.
TENDER BRIEF
The contract timeline includes a maximum execution period of 4 months, excluding bad weather conditions, for all works and services. The start of the works is indicatively planned for mid-October. The actual period for execution will begin from the date of acknowledgment of receipt of the Service Order, which officially sets the commencement of works. This Service Order will be issued within a maximum of two months from the notification of the contract. The total duration will be further detailed by a contractual planning established between the Project Manager and the companies during the market signing meeting.
Sources
- 1TAVAUX-AE.pdf — “comprises. 2-2 VALIDITE DES PRIX: Juillet 2026 TECTA Α.Ε. 4/9 Juillet 2026 SICTOM de la zone de Dole 2-3 OPTIONS ET VARIANTES EVENTUELLES : Extension d'une déchetterie TECTA Α.Ε. $5/9$ Juillet 2026 SICTOM de la zone de D…”
- 2Règlement de consultation.pdf — “défini comme suit: 4 mois, hors intempéries telles que définies au CCAP. Le démarrage des travaux est envisagé pour mi-octobre. Il s'agit là d'une date de démarrage indicative. 2.8 Sous-traitance En cas de sous-traitance…”
- 3TAVAUX-CCAP.pdf — “et l'agrément des conditions de paiement ont été obtenus, le titulaire fait connaître au maître d'œuvre le nom de la personne physique qui le représente pour l'exécution des prestations sous-traitées. Le sous-traitant ne…”
The core scope of work for this tender involves the "Extension de la déchèterie de Tavaux" (Extension of the Tavaux waste disposal center) and is primarily divided into two lots.
Statement of Work Summary and Core Deliverables:
Lot 01 - Terrassement / VRD / Béton armé / Bloc béton (Earthworks / Roads and Utilities / Reinforced Concrete / Concrete Blocks):
- Preparatory Works: Site installation, execution studies, topographical monitoring, establishment of as-built documentation ("Dossier des ouvrages exécutés"), site inspection by a bailiff, removal of existing fences and gates, cutting and demolition of pavement (asphalt/concrete), demolition of curbs and concrete retaining walls, and general site cleaning and preparation.
- Earthworks: Stripping, storage, and re-use of topsoil; excavation and evacuation of embankments; general backfilling with GNT; potential nailing of the excavation platform; leveling, compaction; installation of Geotextile class 5; and placement of GNT for slope dressing and various foundation layers.
- Stormwater Networks: Trench excavation, installation of PVC Ø200 mm pipes, trench backfilling, installation of gully pots and inspection manholes (Ø800 mm, 1000x1000 with shut-off valve), a 5 l/s bypass hydrocarbon separator, basin waterproofing, connection to existing networks, and control of the stormwater system.
- Dry Networks: Trench excavation, installation of various TPC conduits (Ø40, Ø63, Ø75, Ø90) for purposes such as hydrocarbon separator alarms, video surveillance, and power supply for waste compactors; trench backfilling; and installation of pulling manholes.
- Surface Coatings: Application of regulating layers (GNT 0/31.5) under asphalt and concrete slabs, a wearing course (BBSG 0/10), installation of different types of concrete curbs (P3, T2, CS1), and horizontal signaling (continuous/discontinuous lines, STOP markings, directional arrows).
- Reinforced Concrete: Includes studies for reinforced concrete works, execution studies, construction of a retaining wall (height 2.00m including ramp), and a concrete operational slab (including raising for aggregate quay, under bins and waste compactors).
Lot 02 - Clôture / Serrurrerie / Espaces verts (Fencing / Locksmithing / Green Spaces):
- This lot covers works related to fences, gates, and potentially green spaces and signaling panels, though specific detailed deliverables for this lot are not extensively itemized in the provided snippets beyond the general category.
The project duration is indicated as 4 months, excluding periods of inclement weather, with an anticipated start date in mid-October.
Sources
- 1DCE-DPGF.xlsx — “séparateur hydrocarbures,ml,60,,0 ,pour la vidéosurveillance,ml,30,,0 3.1.32,"Fourreau TPC Ø63 Localisation :",,,, ,pour la vidéosurveillance,ml,30,,0 3.1.33,"Fourreau TPC Ø75 Localisation : pour alimentation des compact…”
- 2TAVAUX-CCTP.pdf — “essais. Sauf autorisation particulière du maître d'œuvre, les essais devront être réalisés par une entreprise externe y compris pour les groupes nationaux afin de satisfaire à l'assurance qualité. Nota: la profondeur du…”
- 3Règlement de consultation.pdf — “défini comme suit: 4 mois, hors intempéries telles que définies au CCAP. Le démarrage des travaux est envisagé pour mi-octobre. Il s'agit là d'une date de démarrage indicative. 2.8 Sous-traitance En cas de sous-traitance…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 9 FILES
- DCE01-SITUATION.pdf679 KBPDF
- Règlement de consultation.pdf540 KBPDF
- DCE-DPGF.xlsx78 KBXLSX
and 2 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.