    TENDER DESCRIPTION

    This tender seeks comprehensive external construction supervision and management services for the replacement new construction of the Ruhrbrücke bridge, encompassing civil engineering, foundation, substructure, earthworks, drainage, and demolition works, including the management of logistics and detailed technical documentation. The project is estimated to span approximately 5.5 years, with the contractor's deployment starting in November 2026 and services concluding with final invoice approval by late 2031, requiring a detailed construction schedule within four weeks of award and bi-weekly progress reporting. Key technical requirements mandate strict adherence to German engineering standards (DIN-Normen, AKVS, HVA B-StB), extensive use of BIM methodology, and specific data management via Thinkproject CDE INFRASTRUCTURE (EPLASS) for plan management and approval workflows, supporting various data formats and requiring automated collision checking and non-destructive testing. Bidders must demonstrate professional liability insurance with coverage of 3.00 million Euros for personal injury and 5.00 million Euros for other damages.

    TENDER BRIEF

    The contract timeline is as follows:

    The execution of work is to begin immediately after contract award, no later than 10 calendar days after contract signing, or latest 6 working days after contract award. The overall deployment period for the external construction supervision is expected to commence in November 2026. The total duration of the project is approximately 5.5 years. The contract is scheduled to conclude with the planned completion of the contractual measure in the 3rd quarter of 2031, with the latest completion date for execution being December 31, 2031. The contractor's services officially end with the successful review and approval of the final invoice for the measure, which is expected to occur in the calendar year 2031.

    Key milestones and phases include:

    • Start of Services: The contractor's service period begins with the official construction start meeting.
    • Detailed Construction Plan: The contractor must submit a detailed construction schedule to the client within 4 calendar weeks after contract award.
    • Construction Phases: The construction is divided into sections, with the western partial structure (Cologne direction) to be renewed first, followed by the eastern partial structure (Arnhem direction), with an intermediate gap between these phases.
    • Annual Milestones:
    • 2026: Meetings.
    • 2027: Transport of concrete cubes to the testing institute. Meetings.
    • 2028: Meetings.
    • 2029: Meetings. Tendering of the noise barrier measure in the 3rd quarter.
    • 2030: Meetings. Manufacturing of the noise barrier.
    • 2031: Planned completion of the noise barrier on the Ruhr Bridge structure. Meetings. Review and processing of the final invoice for the construction contract 02-25-0067.
    • Reporting: A digital target-actual comparison of the construction schedule and a Milestone-Trend-Analysis (MTA) are to be submitted every two weeks.

    Sources

    • 102-26-5041_LB Externe BÜ_ENB BW Ruhrbrücke.pdf — “erfolgt unverzüglich nach Auftragserteilung, spätestens jedoch 10 Kalendertage nach Vertragsschluss. Der reguläre Gesamteinsatzzeitraum der ÖBÜ beginnt voraussichtlich im November 2026 und endet mit dem planmäßigen Absch…
    • 2HVA_F_StB_Vertragsbedingungen.pdf — “HVA F-StB Vertragsbedingungen Bezeichnung der Leistung: A-07731-40 A3, Ersatzneubau Bauwerk Ruhrbrücke 02-26-5041 Externe BÜ ENB BW Ruhrbrücke Vertragsbedingungen 1. Besondere Vertragsbedingungen 1.1 Termine und Fristen…
    • 302-26-5041_LPV_Externe BÜ.pdf — “Abfahrten zum Baubüro des Auftragnehmers (AN) und des Auftraggebers (AG) und zur Baustelle. Zwischensumme 00.12. Schlussrechnungen Hinweis zur OZ 00.13.0001. Prüfung und Bearbeitung der Schlussrechnung zum Bauvertrag 02-…
    • 42.01_BB_ENB BW Ruhrbrücke_Bauvertrag 02-25-0067.pdf — “sind Verkehrsführungs- und Sperrphasen sowie Pufferzeiten anzugeben. Während der Bauausführung ist durch den Auftragnehmer ein Vergleich zwischen Soll- und Ist- Terminen vorzunehmen und der Bauablaufplan fortzuschreiben.…

    The core scope of work for this tender, relating to the "Ersatzneubau Bauwerk Ruhrbrücke" (Replacement New Construction of the Ruhr Bridge), encompasses a wide range of civil engineering and technical tasks. Key deliverables and work areas include:

    • Technological Demolition Concept: Development, monthly updates, and submission of a demolition concept for approval.
    • Logistics and Storage: Establishing and operating temporary storage areas for various materials (soil, dredged material, waste), including cadastral records, covering, and necessary protective and operational facilities.
    • Technical Processing/Engineering: Preparing technical documentation and managing plan runs and approval processes via the Eplass platform for specific shafts (TG-1A, TG-2, TG-3) and inlet structures (lowland and upland areas).
    • Foundation and Substructure Works: Manufacturing and installing cast-in-place bored piles of varying lengths and diameters, installing reinforcing steel for large bored piles, preparing pile caps, and conducting integrity testing of bored piles.
    • Excavation Pit Shoring and Securing: Constructing soldier pile walls, installing bracing/stiffeners and injection anchors, building steel sheet pile walls (including shortening), performing soil solidification via jet grouting, and producing underwater concrete and drainage concrete leveling layers.
    • Formwork and Concreting: Creating concrete blinding layers for pile cap slabs and executing formwork construction and removal.
    • Dismantling and Installation: Removing existing pipelines/cables, ensuring collection, loading, and disposal of non-hazardous waste. This also includes delivering and connecting meter panels, and installing halogen-free electrical lines.
    • Cable Infrastructure and Penetrations: Delivering and installing plastic cable protection pipes, performing core drilling through reinforced concrete for specific structural axes (10/70), and providing ring space seals.
    • Earthworks and Landscaping: Supplying and applying topsoil, establishing grass seeding, installing drainage layers, and delivering and compacting backfill material for abutments and wing walls.
    • Drainage Systems: Implementing drainage for substructures and superstructures (TBW West and TBW Ost), which includes constructing maintenance gangway drainage, installing cast iron bridge drains with connecting pipes, and glass fiber reinforced plastic pipelines for bridge drainage, as well as installing cleaning connection pipes.
    • Documentation Review and Archiving: Reviewing, structuring, and technically examining existing documentation (drawings, overview plans, data) for engineering structures, checking for plausibility and completeness, and archiving and handing over documents in both physical and digital formats. This is specifically required for inlet structures and shafts (TG-1 to TG-3).

    Sources

    • 12.02_LV_ENB BW Ruhrbrücke_Bauvertrag 02-25-0067.pdf — “mit zeichnerischen Darstellungen zur Prüfung übersenden. Technologisches Abbruchkonzept nach Unterlagen des und nach Abstimmung mit dem AG monatlich weiterschreiben. Konzept zur Abstimmung mit AG vorlegen, AG im PDF-Form…
    • 22.01_BB_ENB BW Ruhrbrücke_Bauvertrag 02-25-0067.pdf — “Unterlagen des AG herstellen. ca. 3.140 m | Ortbetonbohrpfahl (Ø 1,2 m, Pfahllänge über 35,00 bis 40,00 m, Neigung vertikal) nach Unterlagen des AG herstellen. ca. 1.305 to | Betonstahl B500B für Großbohrpfähle (Ø 1,2 m)…
    • 302-26-5041_LPV_Externe BÜ.pdf — “2030. 1,00 Psch XXXXXX,XX | | Sichtung&Prüfung Bestandsunterlagen Sichtung, strukturierte Erfassung und fachtechnische Prüfung der vorhandenen Bestandsunterlagen (Bestandszeichnungen, Bestandsübersichtspläne und Bestands…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 113 FILES

    • HVA_F_StB_OV_Verpflichtungserklaerung_Eignungsleihe.pdf
    • 2.02_LV_ENB BW Ruhrbrücke_Bauvertrag 02-25-0067.pdf
    • 4.04_Bohrprofile und Rammdiagramme_Anlage 2.1 zum Gutachten.pdf

    and 106 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders