Published

    Fachbauüberwachung Stahlbau

    Notice number: ocds-mnwr74-df9f2bb0-e53c-4973-a060-3407eb45747d

    🇩🇪 GermanyLandesbetrieb Straßenbau NRW - Regionalniederlassung MünsterlandServices

    KEY INFORMATION

    Submission deadline
    Sep 8, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Landesbetrieb Straßenbau NRW - Regionalniederlassung Münsterland
    Accepted Languages
    DEU
    Tender type
    Services
    Contract Value
    Published date
    Aug 5, 2026

    TENDER DESCRIPTION

    This tender seeks specialized construction supervision for the steel construction and coating of two replacement Lippe bridges. The scope of work encompasses comprehensive manufacturing supervision of steel structures and rigorous supervision of corrosion protection across multiple planning phases, including basic evaluation, preliminary planning, draft planning, approval planning, assistance with contract awarding, and construction supervision (Leistungsphase 1, 2, 3, 4, 7, and 8). Key technical requirements mandate expertise such as a Welding Engineer (Schweißfachingenieur gemäß DVS-IIW/EWF 1170) and adherence to specific German engineering standards for steel construction and corrosion protection (e.g., ZTV-ING, Teil 4, Abschnitt 3, Anhang E). Financial prerequisites include professional liability insurance with coverage of €3,000,000 for personal injury and €5,000,000 for property and financial damages. The contract is projected to commence no later than 12 working days post-award and conclude by April 30, 2029, with steel construction pre-assembly anticipated for the third quarter of 2027.

    TENDER BRIEF

    The contract timeline is as follows:

    • Contract start date: Latest 12 working days after the contract award.
    • Contract end date: Latest 30.04.2029.

    Key milestones or phases mentioned, though without specific dates for this contract, include:

    • Pre-assembly of the steel construction is planned for the 3rd quarter of 2027. Final scheduling will occur after the construction schedule is completed and coordinated, likely in October 2026.
    • General service phases for engineering structures are also mentioned, such as "Leistungsphase 1: Grundlagenermittlung" (Basic evaluation), "Leistungsphase 2: Vorplanung" (Preliminary planning), "Leistungsphase 3: Entwurfsplanung" (Draft planning), "Leistungsphase 4: Genehmigungsplanung" (Approval planning), "Leistungsphase 5: Ausführungsplanung" (Execution planning), "Leistungsphase 6: Vorbereitung der Vergabe" (Preparation for awarding), "Leistungsphase 7: Mitwirkung bei der Vergabe" (Assistance in awarding), "Leistungsphase 8: Bauoberleitung" (Construction supervision), and "Leistungsphase 9: Objektbetreuung" (Property management).

    Sources

    • 103-25-5039_Vertragsbedingungen.pdf — “10403-HVA F - Vertragsbedingungen inkl AVB F-StB - Vers. (04/26) Bezeichnung der Leistung: Projekt: | 06-1202 L 667 ENB Lippe / Seitengraben / Mühlengraben Leistung | 03-25-5039 Fachbauüberwachung Stahlbau und Beschichtu…
    • 203-25-5039_Leistungsbeschreibung.pdf — “3. Quartal 2027 vorgesehen. Die endgültige Terminierung erfolgt nach Fertigstellung und Abstimmung des Bauzeitenplans, voraussichtlich im Oktober 2026. Die konkreten Ausführungsfristen können anschließend verbindlich fes…
    • 303-25-5039_Sonstiges.pdf — “Ansonsten wird Ihnen empfohlen, dass Sie elektronische Angebote / Teilnahmeanträge rechtzeitig absenden (z. B. 1 Tag vor Ende der Angebotsfrist / Teilnahmefrist). 30003-LS NRW - Zeitnachweis - Vers. (02/21) Projekt: | 06…

    The core scope of work for this tender, identified as "03-25-5039 Fachbauüberwachung Stahlbau und Beschichtung" (Specialized Construction Supervision for Steel Construction and Coating), primarily involves the manufacturing supervision of steel structures and the supervision of corrosion protection.

    A high-level summary of the Statement of Work and core deliverables includes:

    • Fertigungsüberwachung der Stahlkonstruktion (Manufacturing supervision of the steel construction).
    • Überwachung des Korrosionsschutzes (Supervision of corrosion protection).
    • Specific items under manufacturing supervision of steel construction include Stahlbau 4313 531, Beschichtung 4313 531, Stahlbau 4313 532, Beschichtung 4313 532, Nebenkosten (incidental costs), and Besprechungstermin (meeting appointment).

    Additionally, the tender specifies services across several planning and execution phases:

    • Leistungsphase 1: Grundlagenermittlung (Basic evaluation) - Deliverable: A summary of the results of the basic evaluation with sources.
    • Leistungsphase 2: Vorplanung (Preliminary planning) - Deliverables: Presentation of public-law conditions, variant investigations (technical, environmental, economic, design), a planning concept for each variant (description and construction sketch), cost estimation based on experience, and documentation to determine the preferred variant.
    • Leistungsphase 3: Entwurfsplanung (Draft planning) - Deliverables: Creation of the construction draft according to guidelines, cost calculation, a construction schedule in the form of a bar chart, a financial plan, and all draft documents for assessing technical feasibility, legal execution, and financing approval.
    • Leistungsphase 4: Genehmigungsplanung (Approval planning) - Deliverable: Planning approval documents to obtain construction rights.
    • Leistungsphase 7: Mitwirkung bei der Vergabe (Assistance with awarding contracts).
    • Leistungsphase 8: Bauoberleitung (Construction supervision) according to specific regulations.

    Sources

    • 103-25-5039_Leistungsbeschreibung.pdf — “10541 - LS NRW - Titelblatt Leistungsbeschreibung/Leistungsverzeichnis - Vers. (06/21) Seite 1 von 1 Bezeichnung der Leistung: Projekt: 06-1202 L 667 ENB Lippe / Seitengraben / Mühlengraben Leistung 03-25-5039 Fachbauübe…
    • 203-25-5039_Angebot.pdf — “auf die Wertung und die Vergabeentscheidung. Eine Einwilligung kann jederzeit mit Wirkung für die Zukunft widerrufen werden. (Hinweis: Die vorstehende Erklärung ist nur von Büros auszufüllen, bei denen es sich nicht um j…
    • 303-25-5039_Sonstiges.pdf — “- Bedingungen zu den Leistungen Leistungsphase 1: Grundlagenermittlung Dem Auftraggeber ist eine Zusammenfassung / Zusammenstellung der Ergebnisse der Leistungsphase 1 Grundlagenermittlung" unter Angabe der Quellen in üb…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 7 FILES

    • WB02.D83
    • 03-25-5039_Vertragsbedingungen.pdf
    • Hinweis auf Bekanntmachungsorte.pdf

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders