TENDER DESCRIPTION
This tender seeks architectural planning services (buildings and interiors) for the renovation of the Martinusquelle facility, encompassing HOAI Service Phases 4-8 for the main entrance and Service Phase 8 for other conversion areas. The project involves both EFRE-funded energy refurbishment and additional conversion measures, requiring strict separation for measurement and billing, with costs reported according to DIN 276 Level 3. Key technical requirements include a strong focus on sustainability, future-proof construction aligning with DGNB/BNB criteria, utilization of renewable energies, recycled materials, and digital communication tools. Bidders must demonstrate an average annual turnover of at least 400,000 EUR (net) from comparable services. A detailed planning schedule is to be submitted within 28 days of contract signing, continuously updated, and aligned with client dates, with Service Phase 8 completion as a critical milestone.
TENDER BRIEF
The contract timeline is not explicitly stated with fixed start and end dates or a total duration. However, the contractor is required to prepare a detailed planning schedule within 28 days of contract signing, which will then be attached as an annex (Anlage 4) to the contract and must be continuously updated and adapted to the actual performance progress. This schedule must align with the dates provided by the client. The completion of Leistungsphase 8 (LPH 8) is identified as a key milestone for which a date needs to be specified.
Sources
- 1Teil C_Architektenvertrag_Fachplanung Architektur_2026-08-13.pdf — “Unterlagen, Vorgaben oder Entscheidungen hat der AN dem AG unverzüglich schriftlich mitzuteilen. 7.3 Der AG wird ggfs. weitere erforderliche Leistungen an Fachingenieure oder Sonderfachleute beauftragen. § 8 Termine und…”
- 2Vordrucke_Anlagen_A.1_bis_A.12_Architektur_Mitglied Bietergemeinschaft_2026-08-13.docx — “Bieter ergänzen] Ende: [durch Bieter ergänzen] Abschluss der LPH 8: [durch Bieter ergänzen] Hinweis: Die Leistungsphase 8 muss in den letzten 5 Jahre (Stichtag: Tag der Absendung der EU-Bekanntmachung) abgeschlossen word…”
The core scope of work for this tender involves architectural planning services (Fachplanung Architektur) for the "Sanierung der Einrichtung Martinusquelle" (renovation of the Martinusquelle facility), covering both buildings and interiors. The services are to be rendered according to the basic services of HOAI (Honorarordnung für Architekten und Ingenieure - Fee Schedule for Architects and Engineers), specifically Leistungsphasen (Service Phases) 4-8, as per §33 ff. HOAI in conjunction with Anlage 10.
The specific service phases required are:
- Conversion/New Construction of the Main Entrance: Service phases 4 to 8.
- Other Conversion Areas: Service phase 8.
The contract's subject is the provision of planning services for architectural planning. The content and scope of these services are further detailed in the Leistungsbeschreibung (Service Description, Annex 1).
The renovation project includes both EFRE-funded (European Regional Development Fund) energy renovation measures and additional, non-funded conversion and renovation measures. It is crucial to strictly separate these funded and non-funded measures, especially during measurement and billing. Costs must be reported according to DIN 276 at the third level.
Key deliverables and responsibilities within the service phases include:
- Service Phase 4 (Approval Planning - Genehmigungsplanung): Developing and compiling the necessary documents and proofs for public-law approvals or consents, submitting these documents, and making required additions and adaptations in accordance with Annex 10.1 HOAI.
- Project Management Concepts: Submission of a concept for communication with the client, a concept for quality assurance, and a concept for cost budget control and cost control.
The planned construction execution work packages (EFRE Scope) for which architectural coordination and planning will be required include:
1. Site setup (Baustelleneinrichtung).
2. Earthworks and scaffolding (Erdarbeiten und Gerüstbau).
3. Demolition of old roofs, installation of insulation and sealing, renewal of water drains, and foundations for ventilation systems (Rückbau alte Dächer sowie Einbringen von Dämmung und Abdichtung, Erneuerung Wasserabläufe, Fundamente Lüftungsanlagen).
4. Window and exterior door replacement (Fenstertausch und Außentüren).
5. Cleaning of the old facade, application of insulation, reinforcement, and plaster (Reinigen der alten Fassade, Aufbringen der Dämmung, Armierung und Putze).
6. Basement ceiling insulation (Kellerdeckendämmung).
7. Installation of ventilation ducts and HVAC systems on the roof (Lüftungskanäle und RLT-Anlagen aufs Dach).
8. Pipe installation for the heating system and execution work for the installation of the brine-water heat pump and district heating connection (Rohrinstallation Heizungssystem und Ausführungsarbeiten zur Installation der Sole-Wärmepumpe, Fernwärmeanschluss).
The detailed execution planning will be coordinated by the appointed architect with the executing specialist companies at the start of HOAI Service Phase 3.
Sources
- 1Teil C_Architektenvertrag_Fachplanung Architektur_2026-08-13.pdf — “in dem Bereich Fachplanung Architektur (Gebäude und Innenräume, Grundleistungen der HOAI, Leistungsphasen 4-8, §33 ff. HOAI i.V.m. Anlage 10) erbringen. Teile der Maßnahmen befinden sich bereits in unterschiedlichen Plan…”
- 2Vordrucke_Anlagen_A.1_bis_A.12_Architektur_Einzelbieter_2026-08-13.docx — “sein. ☒ Eigenerklärung (Vordruck Anlage A.4 zu Teil A) zum Nichtvorliegen von Ausschlussgründen nach §§ 123, 124 GWB, § 22 Abs. 1 LkSG und/oder Darlegung von Selbstreinigungsmaßnahmen im Sinne des § 125 GWB ☒ Eigenerklär…”
- 3Vordrucke_Anlagen_A.1_bis_A.12_Architektur_Mitglied Bietergemeinschaft_2026-08-13.docx — “GWB, § 22 Abs. 1 LkSG und/oder Darlegung von Selbstreinigungsmaßnahmen im Sinne des § 125 GWB ☒ Eigenerklärung (gemäß Vordruck Anlage A.5 zu Teil A) über den Gesamtumsatz des Unternehmens ☒ Eigenerklärung (gemäß Vordruck…”
- 4B3_Anlage_3.1_Vorhabensbeschreibung_13.09.2024 nur Scope.pdf — “Sie die geplanten Tätigkeiten und stellen Sie die einzelnen Arbeitspakete in einem Arbeits- und Zeitplan detailliert dar; Umfang max. 2 Seiten) Projektplan siehe Anlage 24.07.23 MZG KMQ Rahmenterminplan.pdf Zu Nr. 47 Bau…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 29 FILES
- B10_KMQ Lageplan.pdf1.3 MBPDF
- B26_240-23 - Bad Lippspringe - KMQ - Sanierung - Nordwestansicht.pdf429 KBPDF
- B29_240-23 - Bad Lippspringe - KMQ - Sanierung - Schnitt A-A.pdf247 KBPDF
and 22 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.