Published

    Fraunhofer-Gesellschaft 80-00031-2800-A Objektplanung Gebäude - Rahmenvereinbarung Region 18

    Notice number: 00527493-2026

    🇩🇪 GermanyFraunhofer-Gesellschaft e.V. - Vergabestelle BauServices

    KEY INFORMATION

    Submission deadline
    Sep 8, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Fraunhofer-Gesellschaft e.V. - Vergabestelle Bau
    Accepted Languages
    German
    Tender type
    Services
    Contract Value
    Published date
    Jul 30, 2026

    TENDER DESCRIPTION

    This tender invites proposals for a framework agreement for Building Object Planning, encompassing comprehensive services for buildings and interiors, including new constructions, extensions, conversions, modernizations, repairs, and maintenance across Fraunhofer Institutes in Region 18. The core scope involves expertise in working within highly technical existing research, laboratory, and office buildings during ongoing operations, delivering services across preliminary, execution, award assistance, object supervision, and documentation phases. Key technical requirements include the use of CAD, digital submissions, and strict adherence to sustainability standards, promoting the waiver of fossil fuels, integration of environmentally friendly heat generation (e.g., heat pumps, geothermal), LED lighting, and photovoltaic systems, in addition to compliance with various federal building guidelines and GDPR. Financially, bidders must demonstrate a minimum average annual turnover of €350,000.00 over the last three fiscal years and maintain professional liability insurance with coverage of €1,500,000 for personal injury and €1,000,000 for property damage. The framework agreement has a…

    TENDER BRIEF

    The documents do not explicitly state a contract start date, end date, or total duration.

    However, the following related information is mentioned:

    • The contractor is required to prepare a time and schedule plan for planning, awarding, and execution immediately after the contract is concluded, in coordination with the client. This plan will be regularly reviewed and updated.
    • Specific deadlines that need to be met include the start of construction, completion date, start of the commissioning phase, and handover date. These are listed as checkboxes in the document, but no dates are provided.
    • Performance periods for specific services, such as draft planning and submission of construction documents, are indicated with blank fields for "weeks from" and "on" (e.g., "Wochen, ab", "am").
    • In the case of phased commissioning, the total duration of the call-off periods utilized by the client must not exceed 18 months.
    • The contract refers to various "Leistungsstufen" (performance levels), including "Leistungsstufe 1 - Vor- und Entwurfsplanung" (Preliminary and Draft Planning) and mentions the possibility of commissioning "Leistungsstufe 5 (Objektbetreuung)" (Object Support) at a later stage.

    Sources

    • 1Anlage B Vertragsmuster Objektplanung.pdf — “RBBau. Statt der Muster 16 bis 18 RBBau kann der Auftragnehmer in Abstimmung mit dem Auftraggeber gleichwertige Formulare oder Kostenkontrollinstrumente einsetzen. 5.3.4 5.4 Die Kostenobergrenze ist in jeder Leistungsstu…
    • 2Anlage F_Allgemeine Vertragsbestimmungen.pdf — “genommenen | Abruffristen die Interessen des Auftragnehmers nicht unangemessen beeinträchtigen; insbesondere darf die | Gesamtdauer der vom Auftraggeber in Anspruch genommenen Abruffristen 18 Monate nicht überschreiten.…

    The core scope of work for this tender involves "Objektplanung Gebäude und Innenräume" (Object Planning for Buildings and Interiors), structured into several service levels.

    The statement of work summarizes the following key deliverables and services across these stages:

    • Leistungsstufe 1: Vor- und Entwurfsplanung (Preliminary and Draft Planning): This includes analyzing fundamentals, coordinating with planning participants, developing preliminary planning, investigating and evaluating variants, clarifying essential contexts and conditions, providing work results as a basis for other planning participants, assisting with pre-negotiations for approval, conducting coordination meetings, and performing cost estimation according to DIN 276. This stage also encompasses the creation of design documents for construction/household budgets.
    • Leistungsstufe 2: Ausführungsplanung (Execution Planning): This involves developing the execution planning with all necessary individual details (graphical and textual) based on the draft and approval planning, creating execution, detail, and construction drawings, providing work results for other planning participants, updating the schedule, and updating the execution planning based on trade-oriented processing during object execution.
    • Leistungsstufe 3: Vorbereitung und Mitwirkung bei der Vergabe (Preparation and Assistance with Awarding Contracts): This stage includes establishing a tender schedule, creating performance specifications with bills of quantities, determining and compiling quantities based on the execution planning, coordinating interfaces with performance specifications of other planning participants, reviewing and recalculating offers, conducting clarification discussions with bidders, and assisting with order placement.
    • Leistungsstufe 4: Objektüberwachung und Dokumentation (Object Supervision and Documentation): This covers all specified services related to object supervision and documentation.
    • Leistungsstufe 5: Objektbetreuung (Object Support/Care): This service level may be commissioned at a later date.

    Throughout the project, the contractor is required to submit drawings, descriptions (including bills of quantities), and calculations in reproducible and digital formats. Additionally, coordination of all technically involved parties is essential in each service stage to ensure planning and supervision goals are met.

    Potential additional services that can be subject to separate agreements include feasibility studies, concepts for construction processes/logistics (especially for existing buildings with difficult access), scaffolding concepts, preparatory demolition work, temporary constructions, measurements, local preliminary investigations, and coordination services.

    Sources

    • 1Anlage B Vertragsmuster Objektplanung.pdf — “Abruf der Stufe 4 erteilte Vollmacht für die Objektüberwachung wird diese sodann Vertragsbestandteil, berührt jedoch nicht § 3 AVB. Der Auftraggeber behält sich vor, die Leistungsstufe 5 nach § 6.5 (Objektbetreuung) zu e…
    • 2Anlage C Vergütungsvereinbarung Muster.pdf — “Fraunhofer Anlage C Vergütungsvereinbarung zu Beratungs- und anderen Leistungen Diese Liste enthält Beispiele für Fälle, in denen eine Einzelvereinbarung nach Anlage C geschlossen werden kann. Für sachlich beschriebene I…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 16 FILES

    • Anlage B Vertragsmuster Objektplanung.pdf
    • Anlage C Vergütungsvereinbarung Muster.pdf
    • Verpflichtung zum Mindestlohngesetz.pdf

    and 9 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders