Published
6509786 - Lotto unico
Notice number: 00540783-2026
KEY INFORMATION
- Submission deadline
- • Sep 10, 2026
- Location
- 🇮🇹 Italy
- Contracting authority
- Agenzia del demanio - direzione regionale abruzzo e molise
- Accepted Languages
- Italian
- Tender type
- Services
- Contract Value
- Published date
- Aug 5, 2026
TENDER DESCRIPTION
This single-lot tender encompasses the technical-economic feasibility and executive design for the seismic retrofitting and energy efficiency upgrades of the "CASERMA PASQUALE INFELISI" building, alongside safety coordination during the design phase and optional works supervision, execution safety coordination, and cadastral updates. The comprehensive scope includes spatial remodulation, architectural restoration, and plant requalification, requiring preparatory design activities and the acquisition of necessary approvals. Bidders must demonstrate the progressive use of building and infrastructure modeling tools, ensuring compatibility with open, non-proprietary formats such as *.IFC and *.BCF, and managing all project information via the Agency's upDATe platform. The design services have a total duration of 180 natural and consecutive days, including a 120-day feasibility study and a 60-day executive project phase, with penalties applied for delays. Financial standing requirements include a global turnover of at least €1,595,204.01 in the best three of the last five years, or professional liability insurance coverage of at least €1,000,000.00.
TENDER BRIEF
The contract timeline is structured into several phases with specific durations and dependencies.
The total duration for the services related to preliminary surveys and design is 180 natural and consecutive days. This duration begins from the date of the service commencement report issued by the Director of Execution (DEC) office. The overall total duration is stated as 180 days plus the execution of works.
Key milestones and phases include:
- Phase 1: Progetto di fattibilità tecnico-economica (Feasibility Study): This phase has a maximum duration of 120 days. It commences from the delivery report of the service by the DEC/RUP.
- Phase 2: Verifica preventiva dell'interesse archeologico (Preventive verification of archaeological interest): This is a principal phase, but no specific duration in days is provided.
- Phase 3: Progetto Esecutivo (Executive Project): This phase has a maximum duration of 60 days. It starts from the RUP's communication to proceed.
- Phase 4: Coordinamento per la sicurezza in fase di Progettazione (Safety Coordination during Design Phase): This is a principal phase, but no specific duration in days is provided.
- Phase 5: Coordinamento per la sicurezza in fase di Esecuzione (Safety Coordination during Execution Phase): This is an optional phase, and its duration is determined by the related works contract.
- Phase 6: Direzione Lavori (Works Supervision): This is an optional phase, and its duration is determined by the related works contract.
- Phase 7: Aggiornamenti catastali (Cadastral updates): This is an optional phase, but no specific duration in days is provided.
The start of each phase must be authorized by the Project Manager (RP), and the effective start date will be recorded in a report drawn up between the contractor and the DEC. The DEC will also indicate the deadline for each phase in this report.
The contractual terms can be suspended if necessary authorizations or opinions from competent bodies are pending, as per Article 23 of D.M. n. 49/2018. The terms will resume once the reasons for suspension cease. Additionally, the delivery of complete documentation for each phase will automatically suspend the service terms until the delivered documents have been verified.
A penalty of 1.5 per mille of the contractual amount will be applied for each day of delay beyond the assigned deadline for each phase, with the total penalty not exceeding 10% of the contractual amount.
Sources
- 1Disciplinare di gara Infelisi_CHB0210_signed.pdf — “5,6,7 della tabella n.2 seguiranno le tempistiche dell’appalto dei lavori. Tabella n. 2 – Indicazione della durata delle fasi del servizio da affidare Fase Attività CPV P (principale) O (opzionale) Durata max. prevista 1…”
- 2CTP CHB0210_Infelisi_signed _2_.pdf — “al cronoprogramma. 19. DURATA DEL SERVIZIO La durata massima dei servizi relativi di rilievo ed indagini preliminari oltre che alla progettazione, è stabilita in 180 giorni naturali e consecutivi (al lordo del ribasso of…”
- 3DIP CHB0210_CASERMA INFELISI_signed.pdf — “(centottanta) giorni naturali e consecutivi, come nel seguito specificato: Attività P (principale) O (opzionale) Durata max. prevista Decorenza Progetto di fattibilità tecnico-economica P 120 giorni Dal verbale di conseg…”
- 4Decisione di contrarre.pdf — “come di seguito specificato: Tabella n. 2 – Indicazione della durata delle fasi del servizio da affidare Fase Attività CPV P (principale) O (opzionale) Durata max. previ�sta 1 Progetto di fattibilità tecnico-economica 71…”
The core scope of work for this tender primarily involves the technical-economic feasibility design and executive design for the seismic retrofitting and energy efficiency upgrades of the "CASERMA PASQUALE INFELISI" building. Additionally, the tender includes safety coordination during the design phase.
Optional services include works supervision, safety coordination during the execution phase, and cadastral updates.
The services are structured around two main activities:
A. Seismic Retrofitting.
B. Energy Efficiency.
Detailed activities encompassed within the scope for each building and its appurtenances include:
- Spatial remodulation.
- Plant requalification.
- Architectural restoration.
- New construction.
- Maintenance.
- Building demolition.
- External requalification.
- Green systems.
- Interior furnishings.
- Urban furniture.
- Furniture demolition.
- Digital Twin.
- Archaeological restitution.
The tender also covers preparatory design activities, such as verifying and integrating existing surveys, acoustic studies, structural analyses, critically reviewing previous investigations, and planning any additional necessary investigations to improve subsequent design. It also requires the preparation of the technical-economic feasibility project (PFTE) and the executive project, including all necessary elaborations for obtaining opinions and authorizations from competent bodies to ensure project approval. A preventive verification of archaeological interest is also a required service. The entire service is consolidated into a single lot to optimize the design activities.
Sources
- 1CHB0210-ADD-SPECIFPRO-XX-SM-Z-P00001_signed.pdf — “di lavoro. Tale documento dettaglia e conferma quanto offerto nell’oGI, costituendo documento contrattuale in cui si definiscono ufficialmente le modalità di gestione ed esecuzione del progetto BIM. La sua stesura è a cu…”
- 2CHB0210-ADD-SPECIFPRO-XX-SM-Z-E00001_signed.pdf — “del flusso di lavoro. Tale documento dettaglia e conferma quanto offerto nell’oGI, costituendo documento contrattuale in cui si definiscono ufficialmente le modalità di gestione ed esecuzione del progetto BIM. La sua ste…”
- 3CTP CHB0210_Infelisi_signed _2_.pdf — “durante l’esecuzione dello stesso. Il servizio si suddividerà nelle attività individuate nella tabella sottostante: Tabella n. 1 – Prestazioni oggetto del servizio, qualificazione ed importo n. Descrizione servizi/beni/l…”
- 4CHB0210-ADD-SPECIFRIL-XX-SM-Z-S00001_signed.pdf — “la cornice di riferimento per l’esecuzione del flusso di lavoro. Tale documento dettaglia e conferma quanto offerto nell’oGI, costituendo documento contrattuale in cui si definiscono ufficialmente le modalità di gestione…”
- 5CHB0210-ADD-SPECIFCSP-XX-SM-Z-C00001_signed.pdf — “servizi presenti nel medesimo appalto: − CHB0210-ADD-SPECIFRIL-XX-SM-Z-S00001 − CHB0210-ADD-SPECPRO-XX-SM-Z-P00001 − CHB0210-ADD-SPECPRO-XX-SM-Z-E00001 1 In fase di Avvio del servizio sarà consegnata all’Aggiudicatario l…”
- 6Disciplinare di gara Infelisi_CHB0210_signed.pdf — “l’incarico in questione riguarda i seguenti punti salienti comunque meglio descritti nel DIP: a) attività propedeutiche alla progettazione, nella verifica ed eventuale integrazione del rilievo dei manufatti, nello studio…”
- 7CHB0210-ADD-SPECIFCSE-XX-SM-Z-K00001_signed.pdf — “SA 2 Documento redatto con l’obiettivo di definire i termini e la cornice di riferimento per l’esecuzione del flusso di lavoro. Tale documento dettaglia e conferma quanto offerto nell’oGI, costituendo documento contrattu…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 43 FILES
- 3.6 Informativa-privacy.pdf114 KBPDF
- E_Schema di contratto.pdf280 KBPDF
- Disciplinare di gara Infelisi_CHB0210_signed.pdf1.3 MBPDF
and 36 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.