Notice number: ocds-h6vhtk-0780df
KEY INFORMATION
- Submission deadline
- • Nov 9, 2026
- Location
- 🇬🇧 United Kingdom
- Contracting authority
- Cyngor Sir Ceredigion County Council
- Accepted Languages
- English
- Tender type
- Services
- Contract Value
- Published date
- Oct 15, 2026
TENDER DESCRIPTION
This tender seeks specialist consultancy services for the Growing Mid Wales Datgloi project, focusing on the technical, operational, commercial, and environmental feasibility of hydrogen-powered machinery and infrastructure within rural forestry. The scope encompasses a two-part approach: initial design and feasibility studies, including baseline assessments, technical options appraisal for hydrogen and alternative low-carbon solutions, followed by the potential commissioning of an early-stage pilot demonstrator involving detailed design, procurement support, testing, and monitoring. Key requirements include adherence to project management, quality assurance, document control methodologies, and compliance with Welsh Language Standards, UK GDPR, and the Data Protection Act 2018. The estimated contract value ranges from £125,000 to £250,000, with completion anticipated by February 2027, subject to grant funding approval and requiring financial standing criteria of a Net Profit Margin > 1.0%, Interest Cover > 1.5, and Current Ratio > 1.0.
TENDER BRIEF
The contract timeline includes several key milestones and their indicative timings. The "Final evaluation and completion" is expected by February 2027.
The indicative milestones are:
- Contract mobilisation and inception: Following contract award.
- Baseline, engagement and data review: Early Part 1.
- Options appraisal and preferred concept: Mid Part 1.
- Part 1 gateway review: During concurrent delivery of Parts 1 and 2.
- Part 2 concurrent mobilisation: Commences alongside Part 1.
- Pilot testing and monitoring: During Part 2, concurrent with Part 1.
- Final evaluation and completion: By February 2027.
A specific contract start date or total duration is not explicitly stated, though mobilization and inception are "Following contract award".
Sources
- 105_Contract for GMW Datgloi Project_Tender Copy.docx — “must be transparent; editable source files, models, registers and supporting data must be provided in agreed Microsoft Office-compatible formats; documents must follow agreed version control, accessibility, Welsh languag…”
- 202_Specification for GMW Datgloi Specialist Services.docx — “| Accepted gateway report and written decision Part 2 concurrent mobilisation | Commences alongside Part 1 | Approved detailed scope, readiness plan and controls Pilot testing and monitoring | During Part 2, concurrent w…”
The core scope of work for this tender, referred to as the GMW Datgloi Specialist Services, is divided into two main parts: Part 1 focusing on Design and Feasibility, and Part 2 on an Early-Stage Pilot Demonstrator.
Part 1: Design and Feasibility includes:
- Inception and Project Definition: Establishing methodology, governance, reporting, and quality assurance, reviewing existing evidence, defining project boundaries, dependencies, data requirements, and stakeholder engagement plans, and creating information request and assumptions registers.
- Baseline and Operational Assessment: Characterizing forestry operations, machinery, fuel use, and emissions, identifying operational challenges, reliability needs, seasonal factors, maintenance, downtime constraints, and priority use cases suitable for further assessment, while documenting data quality and gaps.
- Technical Feasibility and Options Appraisal: Evaluating technically viable hydrogen end-use options and technology interfaces, assessing hydrogen production, procurement, distribution, storage, and refuelling models, considering renewable energy, electrolyser requirements, utilities, space, access, security, and grid constraints. It also involves comparing with battery-electric, hybrid, or other low-carbon alternatives and recommending a preferred option based on transparent criteria.
Part 2: Early-Stage Pilot Demonstrator (commissioned upon written approval) involves:
- Refining and finalizing the detailed pilot design and delivery plan.
- Supporting the procurement, coordination, or mobilisation of agreed technology, equipment, and services within the approved scope.
- Conducting necessary site, safety, operational, regulatory, and readiness checks prior to testing.
- Assisting with integration, commissioning, operator training, and controlled trial activities.
- Implementing a specified monitoring and evaluation framework.
- Collecting and analyzing technical, energy, operational, reliability, safety, cost, user, and carbon data.
- Managing risks, issues, changes, and contingencies throughout the project delivery.
- Engaging with stakeholders, facilitating knowledge transfer, and conducting dissemination activities.
- Producing a final evaluation and completion report with clear recommendations for future deployment, investment, modification, or discontinuation.
Key Deliverables include:
- An accepted inception report and programme.
- An accepted baseline and evidence register.
- A technical review and agreed preferred option.
- An accepted gateway report and written decision.
- An approved detailed scope, readiness plan, and controls.
- Agreed evidence and progress reporting.
- Accepted final reports and all source files.
- A completion report evidencing achievement of Datgloi objectives and grant requirements.
- Regular progress meetings, concise written progress reports, and up-to-date programme, budget position, deliverable tracker, and risk, issue, action, assumption, and decision registers.
Out of scope for this tender are:
- Full-scale commercial deployment.
- Long-term operation or maintenance beyond the agreed pilot period.
- Routine forestry operations unrelated to the demonstrator.
- Permanent infrastructure or equipment purchases not explicitly included in the approved contract scope.
- Future delivery phases not funded or authorized under this commission.
- Any assumption that hydrogen must be recommended regardless of the evidence.
Sources
- 105_Contract for GMW Datgloi Project_Tender Copy.docx — “funding and the Contracting Authority’s decision to proceed. Part 1: Design and Feasibility Inception and Project Definition Confirm the methodology, programme, governance, reporting and quality assurance arrangements. R…”
- 202_Specification for GMW Datgloi Specialist Services.docx — “be re-scoped or not proceed; Identify all actions, approvals, information and funding required before Stage 2 mobilisation. Part 2: Early-Stage Pilot Demonstrator Part 2 will only be commissioned through written approval…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 18 FILES
- 03_Form of Tender.doc653 KBDOC
- (i)_Modern Slavery Policy.pdf208 KBPDF
- (vii) CCC Corporate AI Policy.docx706 KBDOCX
and 11 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.