    Grundinstandsetzung der Ostmole des Bundeshafens Helgoland, Planungsleistungen nach der HOAI sowie Sicherheits- und Gesundheitsschutzkoordination nach der BaustellV

    Notice number: ocds-mnwr74-99c4e3fa-5084-4cac-b1a0-948fa4f77f5a

    🇩🇪 GermanyWasserstraßen- und Schifffahrtsamt Elbe-NordseeServices

    KEY INFORMATION

    Submission deadline
    Sep 22, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Wasserstraßen- und Schifffahrtsamt Elbe-Nordsee
    Accepted Languages
    DEU
    Tender type
    Services
    Contract Value
    Published date
    Aug 19, 2026

    TENDER DESCRIPTION

    This tender seeks comprehensive planning services and safety and health coordination for the essential rehabilitation of the East Mole of the Federal Port of Helgoland, a critical infrastructure project to address a structure over 100 years old. The scope includes all phases of object and structural engineering planning (HOAI Phases 1-6) and full safety and health coordination (SiGeKo) according to BaustellV, both during planning and execution. All services must adhere to generally recognized German rules and standards, be provided in German, and involve secure electronic communication, with project activities commencing by September 2027 and construction anticipated from August 2030 to August 2033. Financial requirements include maintaining robust liability insurance with coverage at least double the insured sum, and a potential 5% security deposit for contracts meeting EU thresholds.

    TENDER BRIEF

    The contract timeline is defined by various project phases and their estimated completion dates or durations. A specific overarching contract start date is not explicitly stated, but project-related activities begin with the awarding of contracts for soil investigations by September 2027. The estimated end of the project, based on the 36-month construction period starting in August 2030, would be around August 2033.

    Key milestones and phases include:

    • Award of contract for soil investigations: By September 2027.
    • Completion of soil investigations: January 2028.
    • Preparation of foundation recommendations: By February 2028 (one month after investigation completion).
    • Geotechnical Report: Approximately February 2028 (11 months after commissioning).
    • Preliminary Design Completion: By April 2028.
    • Basic Evaluation and Preliminary Planning / Specialized Planning for Structural Engineering: Approximately April 2028 (13 months after commissioning).
    • Submission of Draft and Approval Planning to the client: Approximately May 2029.
    • Draft and Approval Planning: Approximately May 2029 (8 months after commissioning for some parts).
    • Execution Planning and Assistance with Awarding: Approximately February 2030 (6 months after commissioning).
    • Start of Construction: August 2030.
    • Estimated Construction Period: 36 months.

    Sources

    • 101 BV Ostmole Helgoland, Beschreibung Planungsleistungen mit Anlagen_clean.pdf — “für die Planungsstufen 1 bis 3. Insbesondere aufgrund des nur schwer abzuschätzenden Zeitbedarfs, der mit der Prüfung und Genehmigung der Entwürfe-HU und -AU verbunden ist (Planungsschritte 2 und 4 nach Abschnitt 3.2), w…
    • 2Entwurf_des_Vertrages_für_Planungsleistungen_nach_der_HOAI_clean.pdf — “4 der Fachplanung zur Trag- werksplanung nach Anlage 14 zu § 51 Absatz 5 HOAI (Formblatt 622-F) | 1.3.1 bis 1.3.9 und 1.4.1 bis 1.4.6 | (8 Monate nach Beauftragung) Sicherheits- und Gesundheits- schutzkoordination | Leis…
    • 3Entwurf_des_Vertrages_für_Planungsleistungen_nach_der_BaustellV_clean.pdf — “Fachplanung zur Trag- werksplanung nach Anlage 14 zu § 51 Absatz 5 HOAI (Formblatt 622-F) | 1.1.1 bis 1.1.6 und 1.2.1 bis 1.2.11 1.1.1 bis 1.1.3 und 1.2.1 bis 1.2.6 | voraussichtlich April 2028 (13 Monate nach Beauftragu…

    The core scope of work for this tender involves planning services and safety and health coordination for the basic renovation of the East Pier of the Federal Port of Helgoland (Grundinstandsetzung der Ostmole des Bundeshafens Helgoland).

    The Statement of Work summary and core deliverables include:

    I. Planning Services according to the Fee Schedule for Architects and Engineers (HOAI):

    These services cover various phases for both object planning (Ingenieurbauwerke) and structural engineering (Tragwerksplanung).

    • Phase 1 (Basic Evaluation - Grundlagenermittlung):
    • Clarifying the task based on client specifications or needs planning.
    • Determining planning boundary conditions and advising on overall service requirements.
    • Formulating decision aids for selecting other planning participants.
    • Clarifying the task for structural engineering (if required).
    • Site inspection.
    • Summarizing, explaining, and documenting results.
    • Phase 2 (Preliminary Planning - Vorplanung):
    • Analyzing the basic information.
    • Aligning objectives with public law conditions and third-party planning.
    • Investigating solution options, considering structural design, practicality, economy, and environmental compatibility.
    • Obtaining and evaluating official maps.
    • Developing a planning concept, including examining alternative solutions with drawings and evaluation, integrating contributions from other planners.
    • Clarifying and explaining essential specialist contexts, processes, and conditions.
    • Preliminary coordination with authorities regarding approval feasibility; potentially assisting in negotiations for subsidies and cost participation.
    • Assisting in explaining the planning concept to third parties (up to two meetings).
    • Revising the planning concept based on concerns and suggestions.
    • Cost estimation and comparison with financial frameworks.
    • Summarizing, explaining, and documenting results.
    • Phase 3 (Design Planning - Entwurfsplanung):
    • Developing the design based on preliminary planning, with necessary scope and detail, considering all specialist requirements.
    • Providing work results for other planners and integrating/coordinating specialist plans.
    • Explanatory report, incorporating contributions from other planners.
    • Specialist calculations (excluding calculations from other service profiles).
    • Determining and justifying eligible costs, assisting in preparing the financing plan and applications.
    • Assisting in explaining the preliminary design to third parties (up to three meetings), revising the preliminary design based on concerns and suggestions.
    • Preliminary coordination of approval feasibility with authorities and other planners.
    • Cost calculation, including associated quantity determination, and comparison with cost estimation.
    • Determining essential construction phases, considering traffic management and operational continuity during construction.
    • Construction time and cost plan.
    • Summarizing, explaining, and documenting results.
    • Phase 4 (Approval Planning - Genehmigungsplanung):
    • Basic services for object planning for engineering structures.
    • Basic services for structural engineering.
    • Phase 5 (Execution Planning - Ausführungsplanung):
    • Developing the execution-ready solution.
    • Graphic representation, explanations, and calculations for object planning, with all necessary individual details including detailed drawings.
    • Providing work results as a basis for other planners and integrating their contributions until an execution-ready solution is achieved.
    • Completing the execution planning during the execution of the object.
    • Phase 6 (Preparation for Award - Vorbereiten der Vergabe):
    • Determining quantities by individual positions, using contributions from other planners.
    • Preparing tender documents, including performance descriptions with bills of quantities and special contract conditions.
    • Coordinating interfaces with other planners' performance descriptions.
    • Defining essential execution phases.
    • Determining costs based on the planner's priced bills of quantities.
    • Cost control by comparing the planner's priced bills of quantities with the cost calculation.

    II. Coordination of Safety and Health Protection (SiGeKo) according to the Construction Site Ordinance (Baustellenverordnung - BaustellV):

    These services are required during both the planning of the execution and the execution of the construction project.

    • Coordinating SiGe aspects among all participants in technical and organizational planning according to § 2 BaustellV, specifically promoting cooperation and continuous information exchange on safety-related issues through safety meetings and protocols.
    • Coordinating measures based on the general principles of § 4 Arbeitsschutzgesetz during the planning of the execution.
    • Advising the client on the planning of the construction site setup.
    • Creating a construction site order.
    • Identifying safety and health-relevant interactions between the work of individual trades on the construction site and other operational activities or influences on or near the construction site.
    • Developing and demonstrating possibilities to avoid safety and health risks during construction.
    • Drafting a safety and health protection plan (SiGe-Plan).

    Sources

    • 1Entwurf_des_Vertrages_für_Planungsleistungen_nach_der_BaustellV_clean.pdf — “Vertrags) Bezeichnung der Leistung: Koordinierung des Sicherheits- und Gesundheitsschutzes gemäß Baustellenverordnung während der Planung der Ausführung sowie während der Ausführung des Bauvorhabens für folgende Baumaß-…
    • 2Entwurf_des_Vertrages_für_Planungsleistungen_nach_der_HOAI_clean.pdf — “Vereinbarung zwischen Auftragnehmer und Auftraggeber bis zur Höhe der im Vertrag genannten Deckungssummen sowie subsidiär bis zu der Höhe, bis zu der bestimmte Mindestversicherungssummen im Rahmen einer Pflichtversicheru…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 18 FILES

    • 392-LF Verzeichnis Leistungen Ua-aU_clean.pdf
    • Hinweis auf Bekanntmachungsorte.pdf
    • 351-F-AVF_clean.pdf

    and 11 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders