Hintere Insel Schütt 7, Sanierung und Erweiterung des bisherigen Kinderhortes zum schulischen Betreuungshaus, Ingenieurleistungen der Tragwerksplanung
Notice number: 00561132-2026
KEY INFORMATION
- Submission deadline
- • Sep 14, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Stadt Nürnberg Hochbauamt
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 13, 2026
TENDER DESCRIPTION
This tender seeks structural engineering services (Tragwerksplanung) in accordance with HOAI §§ 49 ff. and Anlage 14 Nr. 14.1, for the renovation and extension of the former children's daycare at Hintere Insel Schütt 7, 90403 Nuremberg, into a school care center, encompassing existing building parts and a new ground-floor structure within a heritage ensemble. The scope includes HOAI Leistungsphasen 1-6, with phased commissioning initially for LPH 1 and 2, plus special services such as static verification of demolition/construction states, constructive fire protection verifications, and engineering control during execution. Proposers must meet financial requirements, including professional liability insurance of EUR 500,000 for personal injury and EUR 500,000 for other damages (available twice per year), and provide turnover declarations for the past three financial years. Key technical requirements include CAD system compatibility (dwg, dxf), AVA software with GAEB interface, adherence to specific City of Nuremberg guidelines for various technical installations, and electronic submission and invoicing, all in German. The project is structured with a comprehensive timeline, with…
TENDER BRIEF
The contract timeline includes the following key milestones and phases:
- Preliminary phases (BIC-Phase 1-2, Bedarfsanmeldung und Projektkonkretisierung):
- Basic evaluation, feasibility studies: 2021/2022
- Planning order: 02.05.2023
- Kick-Off meeting: 16.04.2024
- Room program review (completion BIC-Phase 1): 07.06.2024
- Review and approval of technical report I (cost framework): 11/2024-02/2025
- Revision of area variants with selection of variant 2: 02/2025-06/2025
- Submission of revised room program and planning order: 10/2025
- Preliminary investigations (pollutants, structure, species protection, etc.): 01/2025-12/2025
- Award of architectural and engineering services (VgV): 10/2025-07/2026
- Planning Phase (BIC-Phase 3, Planung):
- Preliminary design + detailed cost estimate (HOAI-Lph 1-2): 07/2026-01/2027
- 1st Planner-Jour Fixe with all specialist planners: 09/2026
- Submission of preliminary design (HOAI § 51 Abs. 1 Nr. 2): 01/2027
- Preparation and submission of technical report II (HOAI-Lph 2, with detailed cost estimate): 02/2027
- Review and approval of technical report II: 03/2027-05/2027
- Draft design + cost calculation (HOAI-Lph 3): 04/2027-08/2027
- Submission of draft design (HOAI § 51 Abs. 1 Nr. 3): 08/2027
- Preparation and submission of technical report III: 08/2027
- Review and approval of technical report III: 09/2027
- Registration for Project Freeze (Elderly Council) and budget consultations: 09/2027
- Obtaining school supervisory approval: 10/2027
- Final project meeting on the draft: 10/2027
- Preparation of grant applications, FAG: 10/2027
- Approval planning (HOAI-Lph 4): 09/2027-12/2027
- Submission of building permit application: 12/2027
- Submission of structural analysis: 12/2027
- BIC-Phase 4, MIP decision (Project freeze): 01/2028
- Further commissioning from Lph 5, from Project freeze: 11/2027
- Execution planning (HOAI-Lph 5): 01/2028-07/2028
- Preparation and submission of object plan by H: 11/2027-12/2027
- Review and approval of object plan: 01/2028
- Approval of the budget by the Reg. V. Mfr: Spring 2028
- Building permit approval: approximately 05/2028
- Construction Preparation and Execution (BIC-Phase 5 & 6):
- Tendering (HOAI-Lph 6), after budget approval: 08/2028-12/2028
- Award (HOAI-Lph 7): 11/2028-05/2029
- Start of construction (Beginning of activity on the construction site): 03/2029
- Construction execution (HOAI-Lph 8): 03/2029-07/2030
- Execution of outdoor facilities: 05/2030-07/2030
- Overall completion of construction: 07/2030
- Free measurements and defect rectification: 07/2030-08/2030
- Completion:
- Handover to user: 09/2030
The contract's initial planning order was on 02.05.2023, with preliminary studies starting in 2021/2022. The overall project completion and handover to the user are scheduled for September 2030.
Sources
- 1Anlage_4a_2025-10-21_Grob-Rahmenterminplan.pdf — “Hintere Insel Schütt 7, Sanierung und Erweiterung zum Betreuungshaus Grob-Rahmenterminplan Stand 21.10.2025 BIC-Phase 1-2, Bedarfsanmeldung und Projektkonkretisierung | | Grundlagenermittlungen, Machbarkeitsstudien | 202…”
- 2Anlage_00_260716_HIS7_San+Erweit BetrHaus_TWP_Entwurf.pdf — “Das vom Auftragnehmer verwendete CAD-System muss die Schnittstellen dwg und dxf vollumfänglich unterstützen. 6.2 Leistungsverzeichnisse sind generell mit einer AVA-Software zu erstellen. Die verwendete Software muss über…”
The core scope of work for this tender involves providing engineering services for structural planning (Tragwerksplanung) in accordance with §§ 49 ff. HOAI. The specific project is the renovation and extension of a care home located at Hintere Insel Schütt 7, 90403 Nuremberg. The overall construction project includes both existing building parts (partial basement + ground floor) and a new ground-floor building.
The Statement of Work (SOW) summarizes the following basic services (Grundleistungen) as per § 51 HOAI in conjunction with Anlage 14 Nr. 14.1, which are considered essential work steps and parts of the overall project success:
- Leistungsphase 1: Grundlagenermittlung (Basic Appraisal).
- Leistungsphase 2: Vorplanung (Preliminary Design): This includes actively advising the object planner and client on the type of structural system and materials, considering structural safety, usability, and economic efficiency; supporting the object planner in pre-negotiations with relevant authorities regarding approval of static-constructive aspects; conducting necessary coordination meetings with the inspection engineer and specialized experts; assisting with cost estimation; and participating in scheduling.
- Leistungsphase 3: Entwurfsplanung (Detailed Design): This involves assisting with cost calculation, specifically providing cost information related to the structural system.
- Leistungsphase 4: Genehmigungsplanung (Approval Planning).
- Leistungsphase 5: Ausführungsplanung (Execution Planning): This entails preparing final formwork and reinforcement plans with all necessary information for execution (excluding assembly and workshop plans), including thicknesses and masonry qualities in formwork plans, and incorporating penetrations, recesses, and slots from other specialists as per the object planner's execution plans; and assisting with cost control by adjusting planning in coordination with other planners if costs exceed procurement budgets or projected total costs.
- Leistungsphase 6: Vorbereitung der Vergabe (Preparation for Procurement): This includes participating in cost control by adjusting planning in coordination with object planners and other specialized engineers to adhere to approved procurement budgets if costs increase.
In addition to the basic services, the contractor is required to provide the following special services (Besondere Leistungen) as per § 3 Abs. 2 HOAI:
- From Leistungsphase 3 (Detailed Design): Static verification of demolition and construction states.
- From Leistungsphase 4 (Approval Planning): Creation of constructive fire protection verifications in accordance with building regulations.
- For Leistungsphase 8 (Object Supervision): Engineering control of the structural execution to ensure conformity with the approved static documents, and assistance in supervising the execution of structural interventions during renovation and modernization.
The contract outlines several binding deadlines for key deliverables, including the submission of preliminary design (January 2027), draft design (August 2027), building application (December 2027), static verification (December 2027), start of construction (March 2029), overall completion (July 2030), and handover to the user (September 2030). Initially, only Leistungsphasen 1 and 2, along with specific special services, will be commissioned, with the option for further services to be commissioned in stages.
Sources
- 1Anlage_00_260716_HIS7_San+Erweit BetrHaus_TWP_Entwurf.pdf — “9 Muster Projektdokumentation (Stand 03.09.2021) ☑ Nr. 10 Richtlinien zur Führung eines Bautagebuchs (Stand 03/2018) ☑ Nr. 11 Datenschutzhinweis zum Abschluss von Verträgen mit der Stadt Nürnberg (Stand 03/2021) ☑ Nr. 12…”
- 2Sonderanlage_ Honorarangebot_Formular_TWP.pdf — “2 | Vorplanung | 10,0% | 10,0% | 8.680,71 EUR | 0,00% | 8.680,71 EUR LPH 3 | Entwurfsplanung | 15,0% | 15,0% | 13.021,07 EUR | 0,00% | 13.021,07 EUR LPH 4 | Genehmigungsplanung | 30,0% | 30,0% | 26.042,13 EUR | 0,00% | 2…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 27 FILES
- Sonderanlage_ Honorarangebot_Formular_TWP.pdf250 KBPDF
- Bekanntmachung\Auftragsbekanntmachung.pdf203 KBPDF
- Anlage_17_Leistungskriterien HIS7 TWPL 2026-07-28.pdf6 KBPDF
and 20 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.