    Notice number: 00494495-2026

    🇫🇷 FranceMaison d'Accueil Spécialisée NiortWorks

    KEY INFORMATION

    Submission deadline
    Oct 9, 2026
    Location
    🇫🇷 France
    Contracting authority
    Maison d'Accueil Spécialisée Niort
    Accepted Languages
    French
    Tender type
    Works
    Contract Value
    Published date
    Jul 17, 2026

    TENDER DESCRIPTION

    This tender outlines a comprehensive scope of work encompassing preparatory activities such as site installation, scaffolding erection, and project documentation, followed by extensive works on existing structures. The primary tasks involve careful internal stripping and specific demolitions of elements like glass roofs, various flooring types, exterior joinery, and railings, alongside select restoration tasks including the creation of openings in steel decks and reinstallation of metal railings. Key technical requirements necessitate the implementation of a modular and extensible security management system capable of centralizing security across multiple distant sites, compatible with both BUS (RS485) and native TCP/IP architectures, and integrated with Synchronic Air'Evolution and Castel systems, while strictly adhering to specified dimensional tolerances and utilizing equivalent industry-standard equipment for lighting, IT, and interphony. Financially, candidates are expected to demonstrate an average annual turnover over the last three financial years exceeding twice the estimated market value. The project timeline includes a preparatory period commencing December 18, 2026,…

    TENDER BRIEF

    The contract timeline includes a preparation period starting on Friday, December 18, 2026. The provisional start date for the works is Monday, February 22, 2027, with a provisional end date of Wednesday, September 5, 2029. The total duration of the works from the provisional start to end date is approximately 2 years, 6 months, and 14 days. These dates, including the start of the preparatory period and the commencement of works, will be confirmed by a service order. A detailed work schedule will be signed by the parties and communicated via a service order following the preparation period.

    Sources

    • 1012.00 - AE lot 12 - Carrelage - faïence.docx — “la période de préparation : vendredi 18 décembre 2026 Date prévisionnelle de début des travaux : lundi 22 février 2027 Date prévisionnelle de fin des travaux : mercredi 05 septembre 2029 Les dates de début de la période…
    • 2005.00 - AE lot 5 - Étanchéité multicouche élastomère.docx — “la période de préparation : vendredi 18 décembre 2026 Date prévisionnelle de début des travaux : lundi 22 février 2027 Date prévisionnelle de fin des travaux : mercredi 05 septembre 2029 Les dates de début de la période…
    • 3007.00 - AE lot 7 - Menuiserie extérieure aluminium.docx — “la période de préparation : vendredi 18 décembre 2026 Date prévisionnelle de début des travaux : lundi 22 février 2027 Date prévisionnelle de fin des travaux : mercredi 05 septembre 2029 Les dates de début de la période…
    • 4006.00 - AE lot 6 - ITE - Ravalement.docx — “la période de préparation : vendredi 18 décembre 2026 Date prévisionnelle de début des travaux : lundi 22 février 2027 Date prévisionnelle de fin des travaux : mercredi 05 septembre 2029 Les dates de début de la période…
    • 5013.00 - AE lot 13 - Peinture.docx — “: vendredi 18 décembre 2026 Date prévisionnelle de début des travaux : lundi 22 février 2027 Date prévisionnelle de fin des travaux : mercredi 05 septembre 2029 Les dates de début de la période préparatoire et de début d…
    • 60015.00 - AE lot 15 - Ascenseurs.docx — “: vendredi 18 décembre 2026 Date prévisionnelle de début des travaux : lundi 22 février 2027 Date prévisionnelle de fin des travaux : mercredi 05 septembre 2029 Les dates de début de la période préparatoire et de début d…
    • 7011.00 - AE lot 11 - Système lève-personne.docx — “de préparation : vendredi 18 décembre 2026 Date prévisionnelle de début des travaux : lundi 22 février 2027 Date prévisionnelle de fin des travaux : mercredi 05 septembre 2029 Les dates de début de la période préparatoir…
    • 8010.00 - AE lot 10 - Menuiserie intérieure.docx — “de préparation : vendredi 18 décembre 2026 Date prévisionnelle de début des travaux : lundi 22 février 2027 Date prévisionnelle de fin des travaux : mercredi 05 septembre 2029 Les dates de début de la période préparatoir…

    • System capable of centralizing security management for multiple geographically distant sites.
    • System must be modular and extensible.
    • System must function on both BUS field architecture (RS485) and native TCP/IP architecture.
    • Level 1 field terminals (e.g., access control readers) must not be proprietary and must be based on market standards.
    • Compatibility with the Air'Evolution software suite from Synchronic.
    • Ability to operate natively in MODBUS/TCP mode.
    • Centralized videophone network: SYNCHRONIC / CASTEL.
    • Centralized access control network: SYNCHRONIC / CASTEL.
    • Videophone Full IP/SIP, 1 call button with Mifare reader (Réf 590.3000 XE VIDEO 1B MI EVO).
    • Videophone compliance with accessibility law (Full HD color wide-angle camera, 3 LEDs with PHMR pictogram, reassuring voice messages, integrated hearing induction loop).
    • Videophone with IP65 protection rating and IK09 impact resistance.
    • Videophone including 2 RJ45 ports (switch function), a USB port, an RS485 bus, 2 inputs, and 2 relays.
    • Appareillage: LEGRAND (Type MOSAIC, PLEXO, SOLIROC) or equivalent.
    • Lighting: EPSILON (Type FUSCO, KIBITO, KAIO, MONCLA, LUNA, SATURNE) or equivalent.
    • Lighting: LADY LIGHT (Type PANNEAU PPA 300x1200 40W, PANNEAU PPA 600x600 40W) or equivalent.
    • Lighting: RESISTEX (Type RESIDETECT Ref: 830271, PLAFOLED 36W Ref: 749364) or equivalent.
    • Lighting: PHILIPS (Type LUMISTONE) or equivalent.
    • Lighting: THORN (Type PRT LED Ref: 96268802) or equivalent.
    • Safety Lighting: URA (Type URAONE Ref: 111013, Bloc Portable BPI100 Ref: 953375) or equivalent.
    • IT equipment: EXCEL (Type Baie Informatique 9U 600x600 Ref: WB9.6SGB, Panneau de brassage cuivre 24 ports Ref: 100-026, Noyau baie de brassage catégorie 6A Ref: 100-180, Bandeau de prises de courants 8PC Ref: 555-093) or equivalent.
    • IT equipment: D-LINK (Type SWITCH POE 24 Ports Ref: DGS-312024PC) or equivalent.
    • IT equipment: GIGAMEDIA (Type Convertisseur RJ45 / Fibre Optique Ref: GGMFES1602, Modules SFP pour convertisseur Ref: GGMD4MLCLC1M) or equivalent.
    • Interphony: CASTEL (Type CAPH V1B, IPS2) or equivalent.
    • Dimensional tolerance for length and width: ± 0.01 m.
    • Dimensional tolerance for squareness: ± 0.01 m measured over 10 m.
    • Dimensional tolerance for level (arase): ± 0.01 m over 10 linear meters and ± 2 mm per linear meter.
    • Dimensional tolerance for straightness of edges in plan: ± 5 mm.
    • Dimensional tolerance for slab edge camber: ± 2mm.
    • Joint development of details and prototype realization for interfaces between lots "MENUISERIES EXTERIEURES" and the current lot.
    • Vigilant intervention after insulation and airtightness complex installation to maintain energy performance integrity.

    Sources

    • 1610-MFJ2-DCE-CCTP-Lot17 ELEC.pdf — “système sera impérativement capable de centraliser la gestion de la sécurité, de plusieurs sites distants géographiquement. PJ INGENIERIE 68, Avenue Louis Bréguet-85180 LES SABLES D'OLONNE Tél. 02 51 32 67 98-contact@pj-…
    • 2Sommaire matériels.docx — “Documentations techniques : APPAREILLAGE : 1 – Appareil de type N°1: Marque : LEGRAND ou équivalent Type : MOSAIC 2 – Appareil de type N°2: Marque : LEGRAND ou équivalent Type : PLEXO 3 – Appareil de type N°3: Marque : L…
    • 3610-MFJ2-DCE-CCTP-Lot4-CHARPENTE BOIS-BARDAGE.pdf — “des tolérances dimensionnelles « renforcées ». - longueur et largeur : ± 0,01 m - équerrage : ± 0,01 m mesuré sur 10 m - arase : sur le muret périphérique, sur la dalle de fondation ou sur les piles, l'arase doit être ni…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 383 FILES

    • 313 - PIC - chantier général.pdf
    • 008.1 - Annexe 1 à l'acte d'Engagement du lot 8 - DPGF.xlsx
    • 008.00 - AE lot 8 - Charpente métallique - Serrurerie.docx

    and 376 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders