Published
Installation photovoltaïque en autoconsommation zéro injection pour les besoins du Smdea (Ariège 09)
Notice number: 26-78546
KEY INFORMATION
- Submission deadline
- • Sep 29, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Syndicat Mixte Départemental de l'Eau et de l'Assainissement
- Accepted Languages
- French
- Tender type
- Works
- Contract Value
- Published date
- Aug 6, 2026
TENDER DESCRIPTION
This tender seeks a contractor for the supply, installation, and commissioning of crystalline technology photovoltaic power generators for zero injection self-consumption, including all necessary AC interconnection components such as cabling, trenching, TGBTs, breakers, and a zero injection bridging system, along with a data acquisition system for performance monitoring. The scope further encompasses earthing, technical room setup, mandatory three-year preventive maintenance, and potentially an RFID electric vehicle charging station, with a provisional start date of November 2, 2026, and works reception anticipated by end of August 2027 across two firm phases. Bidders must demonstrate financial stability through global and specific annual turnover declarations for the last three years and provide proof of professional indemnity insurance or a bank statement. Technical requirements mandate structures on micropiles or equivalent, synchronous inverters, monitoring boxes, and relevant certifications like Quali'PV Elec and Qualifelec SPV (depending on power output), ensuring compliance with all necessary technical and safety standards. The project includes specific document submission…
TENDER BRIEF
The contract timeline is as follows:
- Provisional Start Date: November 2, 2026.
- End Date: The works are expected to be received without reservations before the end of August 2027.
- Total Duration: Not explicitly stated as a single total duration, but the project is divided into phases.
- Key Milestones/Phases:
- Tranche Ferme (Firm Phase):
- Phase 1: Serres sur Arget / St Jean de Verges, with a maximum execution period of 10 months. The start date for this phase will be determined by a separate service order.
- Phase 2: Carbonne, with a maximum execution period of 10 months. This phase will start upon obtaining the modified building permit. The start date for this phase will also be determined by a separate service order.
- The preparation period for the site is included within each phase.
- Optional Tranches: There are two optional tranches whose deadlines are included within the duration of each firm phase. These correspond to an added value for installation on longrines if the micro-piled solution is not feasible.
- Document Submission: The contractor must submit all required documents at most 45 days before the start of the works. A Dossier des Ouvrages Exécutés (DOE) must be submitted at most 7 days before the reception of the works, and a Dossier d'Intervention Ultérieur sur Ouvrage (DIUO) at the reception of the works, if applicable.
- Warranty: The contract includes a perfect completion guarantee for a duration of 12 months.
Sources
- 1AFF 23040 - AE.docx — “ou égaux aux délais plafonds. Dans le cas contraire, les délais plafonds imposés par l’Entité Adjudicatrice constitueront les délais contractuels applicables. En l’absence de proposition de délais, les délais plafonds se…”
- 2AFF 23040 - CCAP.pdf — “dès le début du contrat les noms et coordonnées professionnelles d'une ou plusieurs personnes chargées de le représenter pour l'exécution des prestations. En cas d'empêchement ou de remplacement de ces représentants en c…”
The core scope of work for this tender involves the supply, installation, and commissioning of photovoltaic power generators. Key deliverables include the provision and installation of a data acquisition system compliant with CCTP for local or remote performance monitoring, including all necessary cabling. The scope also covers the interconnection of alternating current (AC) elements, which encompasses AC cabling between inverters and the site's General Low Voltage Panel (TGBT), trenching with conduits, installation of an IGBT PV, a main circuit breaker, and an emergency AC cut-off switch. Further, it includes the supply and installation of earthing and equipotential bonding for all metallic masses, cable marking, and a technical room. Depending on the project, the installation of an RFID electric vehicle charging station is also specified. Miscellaneous services are integral to the scope, such as material transport, site visits, safety provisions, testing, commissioning, and documentation. The tender also requires the obtainment of the CONSUEL certificate and attestation from the control office for commissioning, installation of a site signboard, and network detection. An optional, but mandatory, three-year preventive maintenance service, commencing from the work reception date, is also part of the scope. Specific photovoltaic equipment deliverables include junction boxes for PV module string coupling with protection devices, a synchronous inverter for public low voltage grid connection, a PV TGBT, electrical cabinets for the AC circuit with protection devices, a zero injection bridging system, and the connection of the solar plant to the injection point.
Sources
- 1AFF 23042 - CDPGF 263,2 kWc.pdf — “configuration: -Système d'acquisition de données conforme au CCIP pour le suivi des performances du générateur photovoltaique localement ou à distance, y compris les câblage | ens | 1 | G8 | Sous Total HT Acquisition de…”
- 2AFF 23040 - CDPGF 27,9 kWc SERRE v2.pdf — “| G5 G5.1 | Sous Total HT Onduleurs (G4) Interconnexion des éléments Courant Alternatif Fourniture el pose, y compris accessoires de pose et de raccordement: Câblage courant AC | | | G5.1.1 | -Câblage entre onduleur et l…”
- 3AFF 23043 - CDPGF 55,8kWc ST JEAN v2.pdf — “des éléments Courant Alternatif Fourniture et pose, y compris accessoires de pose et de raccordement: | | | G51 | Câblage courant AC | | | G5.1.1 | -Câblage entre onduleur et le Tableau Général Basse Tension du site | en…”
- 4AFF 23040 - CCTP v2.pdf — “de boîtes de jonction pour le couplage parallèle des chaînes de modules PV (BJP), y compris dispositifs de protections de l'installation de production d'électricité; Mise en place d'une zone technique: La fourniture, pos…”
- 5AFF 23040 - AE.docx — “| Montant TVA (€) | Montant TTC (€) | Montant TTC en toute lettres | En cas de groupement, ce montant est décomposé entre les co-traitants comme suit : Groupement | Nature des travaux | Montant HT (€) | Montant TVA (€) |…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 35 FILES
- AFF 23042 - PLAN DE MASSE.pdf1.8 MBPDF
- AFF 23043 - SYNOPTIQUE ELECTRIQUE.pdf253 KBPDF
- AFF 23043 - CDPGF 55_8kWc ST JEAN DE VERGES.xlsx162 KBXLSX
and 28 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.