    Installations photovoltaïques individuelles autonomes avec stockage batterie - MAFATE - Commune de Saint-Paul et La Possession Ilets des Orangers, Roche-Plate, Grand Place et La Nouvelle (T2C bis &...

    Notice number: 26-82778

    🇫🇷 FranceSIDELEC RéunionWorks

    KEY INFORMATION

    Submission deadline
    Sep 25, 2026
    Location
    🇫🇷 France
    Contracting authority
    SIDELEC Réunion
    Accepted Languages
    French
    Tender type
    Works
    Contract Value
    Published date
    Aug 24, 2026

    TENDER DESCRIPTION

    This tender seeks a contractor for autonomous individual photovoltaic installations with battery storage in the MAFATE area, specifically covering the Ilets des Orangers, Roche-Plate, Grand Place, and La Nouvelle. The core scope of work encompasses execution studies, conformity assessments, and comprehensive installation services for solar technical rooms and their associated concrete rafts, including diagnostic assessments, extensive concrete work, technical room amenities and conformity, and specialized site transport, often via heliportage. Key technical requirements include the use of durable materials like anodized aluminum or hot-dip galvanized steel, certified photovoltaic modules (NF EN 61215, NF EN 61730-1-2), specific electrical components such as MPPT charge regulators, OPZS batteries, and reversible inverter-chargers, all adapted for tropical and cyclonic climatic conditions. Proposers must demonstrate financial standing through a declaration of overall and contract-related turnover for the past three fiscal years, with provisions for newly established companies or alternative proof of financial capacity. The contract specifies a maximum execution period of 30 weeks…

    TENDER BRIEF

    The contract timeline includes a preparation period of 6 weeks, which is part of the overall execution time. The maximum execution period for the firm tranche is 30 weeks, including the preparation period and excluding building holidays. Similarly, the maximum execution period for optional tranches is also 30 weeks, including the preparation period and excluding building holidays.

    While the planning documents (ANNEXE H - Planning T2C.pdf and ANNEXE H - Planning T3B.pdf) illustrate various phases such as "Piquetage & diagnostic", "Elaboration EXE Individuel", "Commande matériel", "Mise en conformité des ouvrages", "Pose PV", "Pose Batterie", "OPR", "Levée des réserves", and "Prise en concession" across 30 weeks, specific contract start and end dates are not explicitly stated.

    Sources

    • 11.1 - AE - 2026010020 - Lot PV.docx — “agrément des conditions de paiement du contrat de sous-traitance. Le montant total des prestations que : J'envisage (nous envisageons) de sous-traiter conformément à ces annexes : €. TVA incluse. ( € en lettres) En outre…
    • 21.1 - AE - 2026010010 - Lot LT.docx — “est réputée emporter acceptation du sous-traitant et agrément des conditions de paiement du contrat de sous-traitance. Le montant total des prestations que : J'envisage (nous envisageons) de sous-traiter conformément à c…
    • 3ANNEXE H - Planning T2C.pdf — “| | | 4 | T2C.bis Dalle | | | | | | | | | | | | 13 20 | 45 43.48 | | | | | | | | | | | 5 | Charpente Lot | | | | | | | | | | | | | 13 20 | 43 48 | 45 | | | | | | | | | 6 | Paul Couverture | | | | | | | | | | | | | | 13 |…
    • 4ANNEXE H - Planning T3B.pdf — “| | S1 | S2 | S3 | S4 | S5 | S6 | S7 | S8 | S9 | S10 | S12 S13 S11 | S14 | S15 | S16 | S17 | S18 | S19 S20 S21 | S23 S22 | S24 | S26 S27 S25 | S28 | \$29 | \$30 0 | Piquetage & diagnostic | | | | | | | | | | | | | | | |…

    The core scope of work for this tender primarily involves the execution studies, conformity, and installation related to solar technical rooms and their concrete rafts. Key deliverables and tasks include:

    • Execution Studies (Etudes d'Exécution): Conducting diagnostic assessments of the existing facilities, including the technical room itself.
    • Concrete Work (Béton):
    • Bringing the concrete raft into conformity, which includes cleaning around its perimeter.
    • Supplying and installing a concrete raft with rebar for the solar technical room.
    • Installing an earth cable and creating an earth bar for interconnections on the technical room.
    • Providing and implementing concrete for superficial foundations, including HA steels, with considerations for conduits, reservations, and anchoring.
    • Work on the "Béton de propreté" (lean concrete) involving clearing the subgrade of impurities, pouring, dressing, and cleaning.
    • Solar Technical Room Amenities and Conformity (Aménagements dans local technique solaire):
    • Bringing metallic doors into conformity to restrict access to the technical room.
    • Depositing existing locks and installing new THIRARD locks (including keys) for "EDF client access" on the exterior door and "Subcontractor/EDF access" on the battery room door.
    • Conformity or supply and installation of an anti-insect and anti-bird system.
    • Conformity and cleaning of the siding (bardage), particularly the ceiling.
    • Conformity of the structural panel (voile travaillant) and provision/installation of joinery frames.
    • Site Transport (Transport sur site): Specific transport, often by heliportage, for equipment, tools, and personnel required for the conformity work of the entire structure or the solar technical room.
    • Complete Installation, Conformity, and Testing (Installation complète, mise en conformité et essai): This encompasses the full installation for the conformity of the technical room (including testing and commissioning) and the concrete raft.

    Sources

    • 11.3 - CDPGF - LT - Locaux techniques.xlsx — “- Site N°207,,,,, ,,,,, Poste,"Nature des travaux Local technique solaire et son radier béton",U,Q Moe,Q ent.,TOTAL HT en € ,,,,, LT1,Etudes d'Exécution,,,, ,,,,, LT1.1, - Diagnostic d'état des lieux de l'ourvage,ens,1,,…
    • 22.4 - CCTP - SPECIFICATIONS PARTICULIERES - RADIER BETON.pdf — “maîtrise d'œuvre et au bureau de contrôle avant réalisations. Localisation: Sous l'emprise du local technique. 2 INFRASTRUCTURES 2.1 Béton de propreté La prestation comprend le débarrassage au préalable du fond de fouill…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 97 FILES

    • ANNEXE B.2 - Compléments PEO LTS.pdf
    • 1.3 - CDPGF - PV - Photovoltaïque.xlsx
    • LTS 3.2 kWc - PEO.pdf

    and 90 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders